Final PSSR Audit Observation Report - Diesel Import
Final PSSR Audit Observation Report - Diesel Import
Final PSSR Audit Observation Report - Diesel Import
Date of PSSR:
Plant: Diesel Tanks and Diesel Unloading
Finding type
S. Checklist (Document
Checklist item
No Ref No or Field)
Field
Field
12 2.4.5.1 Installation of all piping and equipment as per drawings FORMAT III
14 Document/
2.4.5.3 All low point drains and high point vents are blinded
Field
All temporary blinds are removed.Updated status of Document/
15
permanent blind is available. Field
2.4.5.9
Document/
Temporary strainers and permanent strainers
field
Field
16 2.4.5.25 CSO/CSC valve status
Document
Document
19 2.6.6 Have operating procedures prepared
Document
Bump hazard at the sprinkler water Zebra marking (Black/yellow) stripes to be painted
A Ravi Ramasamy
collection tray when climbing ladder, on bump/trip hazard point in all six tanks
No first Aid box A Ravi Ramasamy First Aid box to be provided in office or at SRR11
The cross over ladder from C,D tanks to E F B Ravi Ramasamy Steps in the slope required for safe cross over
Tank road is ending in drain channel.
No safety boards B Ravi Ramasamy To provide safety boards as needed
Tank inlet / outlet MOV's are diffcult to operate Muhammad To operate the valve in tankage area some
B
manually Chaudhry extended platforms are required,
MSDS not available A Ravi Ramasamy MSDS to be made available to O&M team
Hazop action taken report not provided A Ravi Ramasamy To provide Hazop closeout report
Format III documents not for CP system not FORMAT III documents for CP system and any other
A Ravi Ramasamy
available missing systems in the PSSR scope to be provided
CSO/ CSC not in place A Ramasamy Ravi To apply CSO/CSC as per P&ID .
CSO/CSC Register not available B Ramasamy Ravi To maintain a register for CSO/CSC status checking
Generators for construction still in place A Ramasamy Ravi All temporary equipment to be removed
Corrosion probe 733-CP/CT-1601installed To check EIL design basis and decide the forward
A Ramasamy Ravi
without isolation valve path- Install Isolation valve
Diesel receiving procedure needs to be updated A Ramasamy Ravi Update procedure as per the E Mail comments
SOP Index is not available and SOP's are not Prepare SOP Index and get all SOP's signed off by
B Shailesh Dubey approving authority
signed off.
Communication protocol/procedure with Marine Communication procedure /protocol to be prepared
A Ramasamy Ravi and agreed with Marine
during Diesel recipt not available
Equipment hand over/ takeover procedure B Shailesh Dubey Prepare pump changeover, handover/takeover for
between production & maintenance not available maintenance procedures
Shift handover/ takeover procedures are not B Shailesh Dubey Shift handover/ takeover procedures to be prepared
available
Pipe entry to Tank Dyke not yet sealed A Ramasamy Ravi To seal all pipe entry points
OWS system is modified to store OW in Diesel A Ramasamy Ravi IFC P&ID to be updated or MOC to be approved
Tank
2 Nos 2000 GPM monitor not installed A Ramasamy Ravi To Install
Foam supply point to tanks- Flange open, no A Ramasamy Ravi To install connectors
connector
Fire hose cabinets not installed A Ramasamy Ravi To install
Fire water system not charged A Ramasamy Ravi To charge
Fire hose connectors (11/2"" to 2,1/2"" to Fire A Ramasamy Ravi To arrange connectors/couplings
truck not available
Foam connection coupling to 2000 GPM monitor A Ramasamy Ravi To arrange couplings
not available
Not conducted A Ramasamy Ravi To conduct emergency drill of fire scenario
Some grounding connections missing as shown A Ramasamy Ravi To provide grounding connections
during PSSR
Arc flash suit not available in SS. Mitigation plan B Raja Saminathan Arc flash suit to be procured and made available
available
Unwanted cable sleeves, loose cables observed in B Raja Saminathan Cable cellar cleaning to be done
cable celler.
Action by Function Responsible person Name Target Date Punch Clearance Action Date
Completed