REVISION 0 1 2 3
ASTISOR S.A. 1 1 1 1
08-Mech B360 2 2 2 2
09-Piping B360 2 2 2 2
08-Jan-15
12-Elect B360 2 2 2 2
Comm B360 1 1 1 1
PJS B360 1 1 1 1
ABS Site Surveyor 2 2 2
08-Mech B354 2 2 2 2 Printed from GEMS
08-Mech B355 2 2 2 2
08-Mech B356 2 2 2 2
No Signature Required
08-Mech B357 2 2 2 2
09-Piping B354 2 2 2 2
09-Piping B355 2 2 2 2
09-Piping B356 2 2 2 2
09-Piping B357 2 2 2 2
12-Elect B354 2 2 2 2
12-Elect B355 2 2 2 2
12-Elect B356 2 2 2 2
12-Elect B357 2 2 2 2
Comm B354 1 1 1 1
Comm B355 1 1 1 1
Comm B356 1 1 1 1
Comm B357 1 1 1 1
PJS B354 1 1 1 1
PJS B355 1 1 1 1
PJS B356 1 1 1 1
PJS B357 1 1 1 1
QA 10 10 10 10
Project : B354/355/356/357/360 Page 2 of 8
Doc. No. : TM-M015 Alt. 3
Title : Test Memo For Sewage Treatment System
1.0 REFERENCES
KFELS
No. Description Commissioning
Supervisor
1.1 HAMWORTHY, ST13-C Super Trident Sewage Treatment Unit – Installation, Operating and
Maintenance Manual.
1.2 Keppel FELS drawing no. M101-08 Stbd Fwd Aux. Mach Room, Heavy Tool Room & Main
Storage Room.
1.3 Keppel FELS drawing no. P104 Piping Diagram – Raw Water/Salt Water Piping System.
1.4 Keppel FELS drawing no. P127 Piping Diagram – Sanitary Drainage System
1.5 Keppel FELS Drawing No. E053 – One-Line Diagram - 480V AC Main Switchboard
1.6 Keppel FELS Drawing No. E320 –Schematic & Arrangement - Monitoring Alarm Panel
1.7 Keppel FELS document no. TM-M010 Test Memo – Sanitary Water System
1 1 1.8 Keppel FELS document no. FDS-P008 FDS-Sanitary Drainage System
2.1 Prior to the commencement of the commissioning activities specified in this Test Memo, Commissioning
Superintendent is to carry out risk assessment specific to the activities. Activities are to be coordinated
during VSCC and all involved parties are to be briefed of the potential risk and hazard.
KFELS
No. Description Commissioning
Supervisor
2.1 Ensure Work Permits are in place.
2.2 Ensure Isolation Permits are cleared, Lock Out, Tag Out System implemented for
MCC.
2.3 Ensure adequate barriers and signs are in place.
2.4 Hold Toolbox Risk Assessment meeting with all personnel involved with the
commissioning prior to commencement.
2.5 Consider adequate personnel deployment at around the affected area i.e Main
Deck and Crane.
2.6 All non-essential items blocking the passages and equipment around the generator
sets, PCR and Engine Room have been removed.
2.7 Adequate amount of fire extinguishers to be on hand.
Owner
Keppel FELS
3.0 ABBREVIATION
1 1
MCC : Motor Control Centre
VAC : Voltage Alternating Current
ABS : American Bureau of Shipping
QA : Quality Assurance
AMR : Auxiliary Machinery Room
4.0 PURPOSE
1 1 4.5 To ensure that sewage treatment plant is as per requirement of MARPOL 73/78 (The International
Convention for the prevention of Marine Pollution from ships 1973,1978 Protocol and later amendments
5.1 System:
The purpose of the Sewage Treatment System is to treat discharges from the water closets, in order to
comply with MARPOL requirements for the quality of discharged effluent. The sewage treatment plant
1 1 is designed for 150 persons and each person waste is 70 litres per day. The black water collecting
system is direct gravity system and Black water and all drains from hospital in living quarter are led to
Sewage Treatment Plant.
5.2 Mechanical:
One (1) set of Sewage Treatment Unit is installed in Stbd Fwd Aux. Machinery Room. The Sewage
Treatment Unit operates on the extended aeration principle, with air supplied from a built-in rotary air
1 1 blower to promote digestion by bacteria of the incoming sewage. An activated sludge is separated in
the settling tank and clarified water floats to the contact tank. The activated sludge is pumped back to
the aeration tank by air driven ejector. A chlorine base disinfection chemical is added by dosing pump
in to contact before being finally discharged overboard by a discharge pump.
5.4 Piping:
Discharge from the water closet drain lines is routed to the sewage treatment unit. Clean discharge
from the sewage treatment units is routed overboard via the deck drainage system to the funnel on
vessel transom. A sea water inlet is provided for flushing.
Project : B354/355/356/357/360 Page 4 of 8
Doc. No. : TM-M015 Alt. 3
Title : Test Memo For Sewage Treatment System
KFELS
No. Description Commissioning
Supervisor
6.1 Ammeter
6.2 Voltmeter
6.3 Megger Tester
6.4 Tachometer
6.5 Measuring container & stop watch
6.6 Commissioning spares where required.
6.7 Rig electrical power
6.8 Rig seawater
6.9 Sodium Hypochlorite 25 litre (Chlorination Agent)
2 1
7.0 Sodium Bisulfite 25 litre (De-chlorination Agent)
*NOTE: All test instruments shall bear certificate of calibration dated within 12 months of test.
KFELS
Item (No.1) Sewage Treatment Plant Nameplate Commissioning
Supervisor
Model ST 13-C
Serial No.
Capacity 8m³/hr
KFELS
Item (No.3) Aeration Blower No.1 No.2 Commissioning
Supervisor
Serial No.
1 1
8.0 PRE-OPERATIONAL CHECK
KFELS Owner
No. Description Commissioning Representative
Supervisor
8.1 Verify that all the outstanding punch list items during FAT/warehousing joint
inspection are cleared by vendor/supplier and all issues are closed.
8.2 The Sewage Treatment Unit has been installed per KFELS drawing no.
M101-08 Machinery Arrangement - Stbd Fwd Aux. Mach Room, Heavy Tool
Room & Main Storage Room and according to makers’ instruction manuals.
Check that all components have been filled with the required type/quantity of
oil and grease.
The equipment is to be mounted correctly, motor rotation checked, alignment
checks for the pumps, motors and accessories completed and the installation is
inspected/accepted by Owner and ABS, and documented by KFELS QA.
8.3 The drainage piping has been installed per KFELS drawing no.
P127 Piping Diagram – Sanitary Drainage System.
The piping system is to be flushed, cleaned, hydro-tested and accepted by
Owner and ABS, and documented by KFELS QA.
The sanitary drainage system has been installed, tested and commissioned in
accordance with KFELS document no. TM-M010 Test Memo – Sanitary
Water System prior to conducting the sewage treatment unit testing.
8.4 The electrical supply to the sewage treatment unit has been installed as per
Keppel FELS drawing no.:
E053 – One-Line Diagram - 480V AC Main Switchboard
Continuity checking, megger testing is completed and the installation is
accepted by Owner and ABS, and documented by KFELS QA.
Insulation (MΩ):
Discharge Pump no.1:____ Chlorination Dosing Pump:____
Discharge Pump no.2:____ De-chlorination Dosing Pump:____
Aeration Blower no.1:____
Aeration Blower no.2:____
Project : B354/355/356/357/360 Page 6 of 8
Doc. No. : TM-M015 Alt. 3
Title : Test Memo For Sewage Treatment System
KFELS Owner
No. Description Commissioning Representative
Supervisor
8.5 Check sewage treatment plant tanks (Aeration tank, Setting tank and Contact
1 1
tank) inside condition.
8.6 Check data found on the equipment nameplate and verify them against the
design data in Table 1.0.
KFELS ABS
Owner
No. Description Commissioning (where
Representative
Supervisor applicable)
9.1 Fill the sewage treatment plant with initial charge of
seawater until water flows through the chlorinator.
9.2 Open the inlet valves for both discharge pumps no.1 and 2
and vent all air from the pump housing by opening the
venting plug.
9.3 Ensure that all valves in the air supply line are open.
Switch on the air blower and check for correct rotation. Do
not allow motors to run in wrong direction for more than 3
seconds. When operating correctly, check the reading on
the pressure gauge and record pressure on both
compressors.
KFELS ABS
Owner
No. Description Commissioning (where
Representative
Supervisor applicable)
water, discharge the water from tanks.
Result (Satisfactory/Unsatisfactory):_________
9.11 Measure the air pressure inside the tank. The air pressure
should NOT exceed 15mm water gauge, with blower
running.
Air pressure (mm water): ___________
1 1
KFELS ABS
Owner
Description Design Actual Design Actual Commissioning (Where
Representative
Supervisor applicable)
Blower # 1 Blower # 2
M Voltage (V) 480 480
o
t Current (A) - -
o
r Speed (rpm) - -
Bearing - -
1 1 Temp. (°C)
Air pressure 0.5 0.5
3 1 (bar)
Discharge Pump # 1 Discharge Pump # 2
M Voltage (V) 480 480
o
t Current (A) - -
o
r Speed (rpm)
3480 3480
1 1 Bearing
- -
Temp. (°C)
Auto Mode - -
Tank High Level
- -
Alarm
Common Fault
- -
Alarm
11.0 POST-COMMISSIONING
At the end of the test, flush Sewage Treatment Plant including Aeration tank, Setting tank and Contact tank with fresh water.
Project : B354/355/356/357/360 Page 8 of 8
Doc. No. : TM-M015 Alt. 3
Title : Test Memo For Sewage Treatment System
OWNER
REPRESENTATIVE
ABS
KEPPEL FELS