Professional Documents
Culture Documents
S1-S7-General Plan
S1-S7-General Plan
NK
R BA
VE
RI
27000
TOTAL LENGTH OF BRIDGE
1300 2500
1500 1500 1500 1500 1500 1500 1500
BRIDGE
1500
C
L 1500 1500 1500 1500 1500 1419 1500 1500
2500 1300
DRAIN RAILING RAILING DRAIN
265 265 265 265
265 265 265 265
20 20
2
-
1500
BICYCLE LANE
1
2250
2440
- DRAIN DETAILS
APPROACH SLAB
ROADWAY
3660
ROADWAY
3350
TOTAL BRIDGE WIDTH
14040
11820
L
C
ROADWAY
3350
3660
BICYCLE LANE
PARAFFIN JOINT
2440
DEFLECTION JOINT DETAIL
2250
DETAIL
1500
OF FLOW
4600 4600 4600 4600
DIRECTION
OF FLOW
DIRECTION
1 GENERAL PLAN
NK
SCALE: 1 : 125
BA
ER
RIV
CONSULTANT REPUBLIC OF THE PHILIPPINES SHEET CONTENTS : SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION XIII
21CSN012 : CONSULTING SERVICES FOR THE CONDUCT OF FEASIBILITY STUDY OF THE GENERAL PLAN
PROPOSED LIANGA-SAN MIGUEL ROAD