Professional Documents
Culture Documents
Baroc BR - Plan 2022-Layout1
Baroc BR - Plan 2022-Layout1
WIDENING
WIDENING
55.000
60.000
55.000
60.000
S T A T I O N
S T A T I O N
SUPERELEVATION
SUPERELEVATION
EXIST'G ROAD ELEV.
0.00%
61.20 L.M.
55.655 61.146
BAROC BRIDGE
LEGEND
58.652 61.146
LEFT LANE
LEFT LANE
K0143 + 800
59.419 59.419 K0143+547.30 BEGINNING OF PROPOSED
61.108 61.108 PCCP WIDENING & CONC. SHOULDER @ 1ST
REGION IV-B
APPROACH
59.417 59.417
61.000 61.000
SOUTHERN MINDORO
60.757 60.757
K0143+575.30
BEGINNING OF PROPOSED
59.353 59.353
RETAINING WALL @ B/S
K0143 + 600
59.428 59.428
59.539 59.539
59.450 59.450
59.303 59.303
59.519 59.519
59.109 59.109
59.582 59.582
K0143 + 900
59.693 59.693
58.870 58.870
59.819 59.819
58.794 58.794
59.916 59.916
58.804 58.804
60.116 60.116
58.746 58.746
60.518 60.518
58.629 58.629
K0143 + 700
60.706 60.706
STA. K0143+713.00 END OF PROPOSED
58.583 58.583 PCCP WIDENING & CONC. SHOULDER @ 1ST APPROACH;
END OF RETAINING WALL @ B/S
61.051 61.051
58.439 58.439
61.117 61.117
55.000
60.000
-1.50%
58.419 58.419
K0144 + 000
58.939 61.146
58.408 58.408 GRADE BREAK STA = 144+010.00
ELEV = 58.408
SHEET CONTENTS:
58.840 61.146
144+000.00m 144+009.97m
58.391 58.408
55.261 61.146
58.362 58.408
0.00%
61.20 L.M.
55.655 61.146
58.324 58.408
BAROC BRIDGE
58.652 61.146
144+038.71m
BACK TO BACK OF BACKWALL
58.256 58.408
GENERAL PLAN
59.532 61.146
58.174 58.408
K0143 + 800
61.108 61.108
58.147 58.408
61.000 61.000
58.080 58.408
60.757 60.757
58.067 58.408
60.463 60.463
58.060 58.408
STA. K0143+845.20
DATE:
BEGINNING OF PROPOSED
PCCP WIDENING & CONC. SHOULDER
K0144 + 100
60.101 60.101
@ 2ND APPROACH
144+100.97m
58.033 58.408
PREPARED BY:
8.00%
-8.00%
144+107.08m
59.815 59.815
58.035 58.408
59.539 59.539
58.043 58.408
ENGINEER II
59.303 59.303
144+130.70m
58.037 58.408
RAYMOND D. SISCAR
3.20%
-3.20%
0.00%
144+137.90m
59.109 59.109
58.056 58.408
58.995 58.995
58.064 58.408
K0143 + 900
58.870 58.870
DATE:
58.060 58.408
144+164.34m
144+164.34m
58.794 58.794
58.053 58.408
58.804 58.804
58.046 58.408
CHECK & SUBMITTED BY:
58.746 58.746
58.032 58.408
K0144 + 200
58.682 58.682
57.997 58.408
DETINO V. GUEVARRA, JR.
58.629 58.629
CHIEF, PLANNING AND DESIGN SECTION
57.981 58.408
58.583 58.583
57.980 58.408
58.517 58.517
DATE:
57.988 58.408
58.439 58.439
58.010 58.408
55.000
60.000
-1.50%
58.419 58.419
57.959 58.408
K0144 + 000
RECOMMENDING APPROVAL:
58.391 58.408
57.988 58.402
OIC-ASSISTANT DISTRICT ENGINEER
EMMANUEL A. MANALAYSAY
58.362 58.408
57.983 58.385
58.324 58.408
57.973 58.356
144+038.71m
K:86.78
K0144 + 300
LVC:60.00
58.256 58.408
DATE:
57.967 58.316
PVI ELEV:58.41
APPROVED:
PVI STA:144+300.00
HIGH PT ELEV: 58.41
58.174 58.408
HIGH PT STA: 144+270.00
57.987 58.264
58.147 58.408
57.995 58.200 EVCS: 144+330.00
EVCE: 58.20
-0.69%
58.080 58.408
57.996 58.133
DISTRICT ENGINEER
58.067 58.408
ANNIELYN E. PADULLO
58.002 58.071
K:70.97
LVC:40.00
58.060 58.408
57.993 58.014
PVI ELEV:57.99
PVI STA:144+360.00
K0144 + 100
-8.00%
K0091+300
@ 2ND APPROACH
DPWH
SMDEO
CY-2022
58.043 58.408
144+130.70m
58.037 58.408
3.20%
-3.20%
0.00%
SHEET NO.
BRIDGE
144+137.90m
58.056 58.408