CARIBBEAN MILITARY TECHNICAL TRAINING INSTITUTE

PLUMBING LEVEL 11

INTERNAL ASSESSMENT

UNITS: MEMCOR0012A : Plan a Complete Activity

MEM0S0042A : Interpret Standard Specification and Manuals

MEMCOR0052A : Operate in An Autonomous Team Environment

MEMMAH0042A : Order Materials

MEMMAH0073A : Purchase Material

Instructor/Demonstrator: Mr. Lascelles Stern and SGT.Wallen D

NQR#: ________________________________
Name: _________________________________
Date: December 9, 2022
Time Allotted: 1 hrs. 30 mins
Instructions:
1. Attempt all questions.
2. Direct all question(s) to the invigilator(s).
3. Any form of corresponding without the invigilator’s approval will be considered
cheating and will result in disqualification.
4. No cellular phone will be allowed in the assessment room.
SECTION A TRUE AND FALSE

INSTRUCTIONS: Decide whether each statement is true or false and circle “T” or “F” which
indicates your choice. Each correct answer value (one 1 mark each)

1. Setting clear and specific goals are characteristics of effect T F

2. A good team player shows willingness to compromise and accept criticism. T F

3. Ground rules are not necessary in the team building process when team members
are adults T F

4. Forming is the last stage of the team building process T F

5. A purchase order should not contain quantity, delivery and price as they are already
on the request for quotation T F

6. Payment for invoices is the final control steps in purchasing. T F

7. It is not a good practice to have more than one source of supply T F

8. The plan that will show the length and width of a bath tub is the Elevation plan. T F
9. A bar chart is similar to bar graft T F
SECTION B MULTIPLE CHOISE

Instructions: Circle the correct answer for questions 10 – 20. Each correct answer values
(1) mark

10. Coordinate works with other trades means

A. Cooperating with the foreman only


B. Scheduling of different skill men to do their work
C. Try to finish before the other skill men
D. Supervising other skill men

11. Planning is never complete without adequate consideration for safety. This includes:

A. Barricade around open excavations


B. Shoring for trenches
C. Clean up
D. All of the above

12. Checking the quality of work should be on aspect of planning and organizing the job and

should include:

A. Joints should be neat


B. Properly aligned fixtures
C. Properly aligned pipes
D. All of the above

13. Which of the following should be used as an imperative in organizing the job?

A. The name of all plumbers


B. Identify and obtain the necessary tools and equipment for the job
C. Arranging for deliveries and inspections
D. Coordinating the work of the crew

14. Identify the phrase or statement that is false about reviewing your plan

A. It retards the job and cast time


B. It enables you to see unforeseen difficulties
C. It ensures that outcomes are obtained
D. It is part of quality assurance

15. Identify the phrase that describes a team

A. An organized group of persons possessing different skills and experience


B. Work together to achieve common goal
C. A group that works cooperatively to increase productivity
D. All of the above

16 Effective team work is one of the most important skills a plumber should possess. He

should not be:

A. Able to work with other plumbers


B. Accept criticism
C. Work with supervisors and other plumbers
D. Increase tension and decrease productivity
17. Which of the following best describe a bad team member?

A. Find a way to contribute to team goals


B. Make suggestions in a positive way to other group members
C. Participate by trying by trying to control what the group does
D. Participate in the group without trying to control what the group does

18. All but one is not an objective of good purchasing

A. Procurement of the right material, in the right quantity and right quality
B. Receipt of the material at the right place, at the right time
C. Purchase of materials from the right source at the place
D. Purchase of materials from the cheapest source

19. Identify the statement that is not true when preparing specifications

A. Describe materials to be used


B. List all plumbing operation to be performed
C. Shows location of plumbing fixtures
D. State the quality of work that is expected

SECTION C

20 Arrange the following items below in the format of a material listing to be taken to the

hardware store. (6 marks)

Items

2 - 30 gallon electrical water heaters @ $12575.00


10. 4- Briggs bathtubs @ $12500.00 each
11. 4- American Standard W.C. @ $7600.00 each
12. 1- Pedestal Lavatory 24” x 16” @ $5800.00
13. 3- Sayco bath mixer faucets @ $6900.00 each
14. Wall hung lavatory basin 20”x 16” @ $3000 e

21 Complete the purchase requisition order for the items described given your name as the

hardware supplier. The request date must be 21 days in advance of the required date

(8) marks)
PURCHASE REQUISTITION

SUPPLIER NAME __________________________ Date of


requisition___________

SUPPLIER ADDRESS ___________________________ Date


Required____________

Purchase Order
no._________

Dept.____________________

ITEM QUANTITY UNIT DISCRIPTION ITEM UNIT VALUE


# REQUESTED NAME PRICE $ C

Prepared by__________________ Date---------------------------------


CARIBBEAN MILITARY TECHNICAL TRAINING INSTITUTE

INTERNAL ASSESSMENT

(PRACTICAL)

Group: Plumbing Level 2

MEMCOR0012A Plan A Complete Activity

MEM0S0042A Interpret Standard Specification and Manuals

MEMCOR0052A Operate In An Autonomous Team Environment

MEMMAH0042A Order Materials

MEMMAH0073A Purchase Material

Instructor/Demonstrator: Mr. Lascelles Stern and SGT.Wallen D

NQR# ___________________________________

Name ___________________________________

Date : December 9, 2022

Time Allotted: 2 hours

Scenario

The 2022 cohort of the Plumbing Level 2 trainees has been task to upgrade the Plumbing system
of the Caribbean Military Technical Training Institute. The trainees are required to

Task/scope of work

 Plan a complete activity


 Interpret standard specification and manuals
 Operate in an autonomous team environment
 Order materials
 Purchase materials

(01) You were given a contract for a plumbing installation in the CMTTI location
Prepare a Gantt chart using the information given below

Activitie Description of activates Duration in


s days
A Site clearance 1

B Prepare location for installing D.W.V. pipes 2

C Excavate trench for the installation DWV pipes ,Manholes , Gully 3


Basins and Grease Trap using the proper procedures

D Prepare location for Septic Tank and Absorption pit 4

E Fabricate Absorption pit and Septic Tank 4

F Lay out and positing pipes and fittings in trench and backfilled with 2
selected materials

G Fabricate man holes, Trap Gully basin and Grease trap 4

H Roughin-ing pipes for bath room fixtures 2

I Back fill DWV pipes with selected materials 1

J Roughin-ing hot and cold water supply pipes to bath room fixtures 3

K Install plumbing fixtures 2

L Inspection 1

(02) Prepare a Purchase Order/List with all the piping materials supplies and fittings for the job

above, to be taken to an hardware in order to acquire a Performer Invoice (10 mks)

Purchase Order

Item Size Description Items quantity


# ____________________________ name________