Skill Cluster Five Practical Rubric 2022

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 3

RESEARCH PROJECT AND ORAL PRESENTATION RUBIC

SKILL CLUSTER FIVE (5)

SKILL AREA: Electrical Installation Inspection Level 4


UNIT CODE/TITLE: MEMMRD0673A: Coordinate the installation of electrical wiring
support system infrastructure
MEMMRD0683A: Coordinate the installation of electrical cable and
accessories
MEMMRD0693A: Coordinate The Installation Of Electrical
Equipment, Ancillary Apparatus And Secondary
MEMPLN0034A: Coordinate And Manage Commissioning Processes
MEMMRD0034A: Modify Complex Electrical Circuits And Systems

INSTRUCTOR/DEMONSTRATOR: Lawrence Kirby


Date given: December 22, 2022 Due date: December 22, 2022 Weight: 5%
Instructions: You are required to carry out the following

Given three (3) 110KVA single phase transformer, you are required to connect them in the
following configuration;
a) Star – Delta
b) Star – Star
c) Delta – Delta
d) Delta Star
e) Open Delta

You are also required to carry out the following test using a meg-ohm meter to verify that
transformers are in proper working condition
a) Open circuit
b) Short circuit
c) Leakage current
d) Grounding of the transformer
RUBRIC

Criteria 0 1 2 3 4 5
Use of appropriate PPE
Selection of appropriate tools/equipment
Appropriate use of tools/equipment

Transformer Configuration
Delta- Delta
Delta – Star
Star - Star
Star - Delta
Open Delta
Test
Open circuit
Short circuit
Leakage
Grounding of the transformer

Total (60)

Rating Scale: 5. Excellent, 4. Good, 3. Average, 2. Weak, 1. Not Identified

Commment:___________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________

Instructor’s Name: ___________________ Instructor’s Signature: ______________


Trainee’s Names: _____________________ Trainee’s Signature: ________________
Date: ___________________

NB. A hard copy of the project and the presentation should be submitted on the due date
before the presentation is done.

You might also like