JHA FOR DEMOLITION

Job No: 4300065248 Date: 09th May 2022

Name of the NREP/TP/NEECON/


Numaligarh Refinery Expansion Project JHA No:
Project: JHA/0

Client: Numaligarh Refinery Ltd Rev. No: 00

Prepared By
MPMC: Technip India Limited (Contractor Site
Partha Lahkar
Engg)

Name of the Reviewed By


North East Engg & Construction
Contractor: (Contractor HSE) Akash Baruah

Demolition of Connection of new CRWS


Job line in MS Block with the existing
Description: network in north and south direction. Approved By Ajit Kumar Mohanty
(Road No. 7B) (MPMC Site Engg)
(MPMC HSE)
Job
Classification: A Rajib Lochan Sahu

General Job Hazard Analysis


With reference to the scheme reported below, the hazards identified for the JHA are classified as A, B or C
according to their degree of potential human impact considering severity and probability (i.e. from most severe
and probable to least severe and probable).

Hazard areas are identified, and colour coded.

Class "A" Hazards


A condition or practice likely to cause permanent disability, loss of life or body part and/or extensive loss
of structure, equipment or material.
Class “B” Hazards
A condition or practice likely to cause serious injury or illness (resulting in temporary disability) or
property damage that is disruptive, but less severe than Class “A”.
Class "C" Hazards
A condition or practice likely to cause minor (non-disabling) injury or illness or non-disruptive property
damage.

Page 1 of 2
JHA FOR DEMOLITION

Sl. Sequence of Activity


Hazards Involved Safety Measures / Precautions
No Steps
1. Detaching of all General Hazards (Cut, Abrasion, Only Competent Person with a
supplies Puncture ,etc) during normal activity Demolition Plan.

-All Utilities Lines Impact/ Collision with Use all mandatory PPE
-Electric cables obstacles/vehicles (fixed or
movement) All utility services such as
electricity, telephone,gas and
Electric shock , explosion , jet, etc water must be shut off and the
main supplies disconnected
outside the line of the demolition
work.
2. Machine moving Vibration – Noise Safe area with barricade around
demolition area.
(Poklain) Machines/Tools contact with moving
and rotating parts
3. Demolishing General Hazards (Cut, Abrasion, The hazard of material inside the
Puncture, etc.) during normal activity structure to demolish shall be
Collapse/Cave in/Compression considered.
Material/falls Use of masks.

Dust and Fibres (Asbestos) Wet the area (water spraying) for
dust abatement/minimisation
Material disposal

4. Environmental aspects waste to dispose Waste should be disposed at


Dust location identified by NRL/Technip
Vibration Dust level shall be controlled by
spraying water at job location

Page 2 of 2