DAILY ROUND OFF POINT

SN. JOBS RESPONSIBILITY

1 NEAR IMP. WOOD PULPER FIRE FIGHTING WATER LINE TO BE COLOUR.


FELT PIECE TO BE HANG ON IMP. WOOD PULPER DOOR NEAR PAC
2
STORAGE.
3 BACK SIDE BALE STACK WASTE PLASTICK TO BE REMOVE STOCK S/I

4 CIVIL DRAIN WORK TO BE DONE NEAR COUCH PIT PULPER.

5 NEAR PRESSURE SCREEN PIPE LINE TO BE CLEAN. PANKAJ

6 ALL MS PIPE LINE TO BE PAINT AS PER MATERIAL WISE .

7 ALL BROKEN WINDOW SHEET TO BE REPARED.

8 DRAIN CIVIL WORK TO BE DONE NEAR UTM PULPER.

9 REMOVE CHEMICALS EQUIPMENT NEAR UTM PULPER. GAUTAM

10 BACK SIDE OF UTM PULLEY WHEEL TO BE REMOVED MECH

11 SIZE KITCHEN CHEMICALS SKID NAME TO BE TAG

12 SIZE KITCHEN AREA DOOR FELT PIECE TO BE HANG.

13 WPP OFFICE MAIN ENTRY DOOR FIBER SHEET TO BE HANG .

14 WHITE BOARD TO BE REQUIRED FOR DAILY TRAINING .