INVOICE

InvoiceNo: 2241 S.K Engineers & Construction


Date : 28/11/2022 GSTIN :
W.O No : 4700012290 29AIYPP1800F1ZZ
SAC.Code: 9954 Construction PAN :AIYPP1800F

To : Project Adress :
M/S. Orchids Apartments Pvt.ltd " Adarsh Tropica" Chikkanayakanahalli 1
#10,Vittal Mallya Apartments-Phase 1, Chikkanayakanahalli
Road, Bangalore-560001, Karnataka , India. Village "
Vathur Hobli,
Bangalore East Taluk, Bangalore-560035
GSTIN : 29AAACO2209G2ZO
PAN : AAACO2209G

Present Bill
Sl No Particulars Unit Cummulative Bill
RA Bill No-03

A Work Done Value Of RA -03 Rs 308985.72 308,985.72

b Add CGST 9% Rs 27,808.71 27,808.71


c Add SGST 9% Rs 27,808.71 27,808.71
B Sub Total Amount (B= A+b+c) Rs 364,603.15 364,603.15
Roundup 0.74 0.74
C Total Amount C= (B-e) Rs 364,602.41 364,602.41

Five Lakh Seventy four Thousand Five


Amount in Words hundred and Fourty Seven Rupees Only

SK ENGINEERS & CONSTRUCTIONS.

Authorized Signatory
SK ENGINEERS AND CONSTRUCTIONS

CLIENT : ADARSH DEVELOPERS


CONTRACTOR : M/s S K ENGINEERS & CONSTRUCTIONS
SITE: ADARSH TROPICA ,CHIKKANAYAKANAHALLI VILLAGE, VARTHUR HOBLI, BANGALORE EAST TALUK BENGALURU-560035 ABSTRACT SHEET
NATURE OF WORK : CIVIL WORKS FOR CONSTRUCTION OF MOCK UP , SALES OFFICE, GAZEBO, RETAINING WALL AND OTHER MISCELLANEOUS WORK.
WO NO : 4700012290
RA BILL-03

AS PER BOQ Previous RA Bill-02 Present RA Bill-03 Cummulative Bill


SL NO DESCRIPTION REMARKS
UNIT QTY RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT
10 Earth Work
10.1 Excavation Cum 98.98 162.00 16034.76 42.44 6875.40 3.97 643.66 46.41 7519.06

Excavation by mechanical means in all types


of soil for basement, footings of columns, retaining walls, core
walls, catch pits, lift pits, trenches for drains etc., including dense
soil, soft rock,
weathered rock disintegrated rock including necessary manual
excavation for dressing the edges and levelling, all leads and
lifts. Rate to include disposing the excess earth & spreading in
layers to the required levels within the site wherever specified, ..
carting away out side the site to the designated areas identified
by the local authorities, dewatering of both ground & surface
water & rain water, removal of slurry generated while excavation
& keeping the area free from water (upto plinth level) with
necessary shoring, struting etc, Keeping earth in position etc.,
including filling wherever required, excavating loose pockets &
compacting the same as per drawing / as per instruction of
project

0.00
10.2 ANTI TERMITE TREATMENT Sqm 681.53 78.00 53159.34 367.53 28667.07 0.00

Providing anti termite treatment in accordance with


stipulations laid down by IS 6313 Part II by approved agency
with minimum of 10 years of guarantee including the cost of 0.00
chemical, precautionary measures etc., complete under and
around the column pits etc complete as per specification @
3 Levels

1.Foundation Level 0.00


2.Plinth Level 0.00
3.Periphery Of Building 0.00
0.00
20 PLAIN CEMENT CONCRETE - M 7.5 0.00
20.1 PCC M7.5 Cum 51.82 3101.00 160693.82 18.95 58778.98 18.95 58778.98

Footing & Block work foundation collecting and


laying PCC M7.5 for below footings , blockwork & flooring &
compacted by wooden or cast iron rammers, curing, with
necessary edge formwork complete. Rate to includes all 0.00
leads and lifts,cleaning, sub grade preparation & levelling
etc., complete at all heights and depths as instructed and as
per the directions of project-in-charge / drawing / structural
consultant.

M7.5 Grade Concrete Supply in Adarsh Scope 0.00


20.2 PCC M7.5 Cum 16.33 1727.00 28201.91 13.60 23493.45 13.60 23493.45

Page 2
AS PER BOQ Previous RA Bill-02 Present RA Bill-03 Cummulative Bill
SL NO DESCRIPTION REMARKS
UNIT QTY RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT

collecting and laying PCC M7.5 for flooring compacted by


wooden or cast iron rammers, curing, with necessary edge
formwork complete. Rate to includes all leads and
lifts,cleaning, sub grade preparation & levelling etc.,
complete at all heights and depths as instructed and as per 0.00
the directions of project-in-charge / drawing / structural
consultant.

M7.5 Grade Concrete Supply in Adarsh Scope 0.00


0.00
30 Reinforced Cement Concrete 0.00

RCC - REINFORCED CEMENT CONCRETE -M20 0.00

Unless otherwise specified the following will apply for all


items of plain & reinforced cement concrete Rates quoted
shall be in clusive of the following but excluding cost of
reinforcement .Adequate protection to edge & corners from
damage during construction . The contractor are particularly
advised to study relevant Drawing carefull before quoting .
Note: All the RCC framed should be a Seismic zone II
compliant. Providing and laying controlled reinforced
cement concrete confirming to grades as specified in (IS 456-
2000) as per specifications using 20 mm down size
aggregates at any depth or heights ,Rate shall include
Centering ,Shuttering ,Scaffolding and necessary
staging ,compacting with vibrators ,curing rate hacking the
exposed surfaces wherever required. for providing recess to
walls or columns ,sleeves in slabs ,construction joints ,sunk
slabs cantilever slabs ,making holes or cutting formwork for
taking out Electrical condutes or dowels for column to
Blockwork to the required shape ,size slopedown in
drawings for the foiiowing items of work. Rates include all
leads & lifts. And as per drawings/directions of project
incharge. M20 for column
footings ,columns ,plinthbeams ,staircase waist
slab ,steps ,landing ,roof beams ,sunkan slabs ,flat roof
sabs ,balconies ledges ,counter slabs ,shelves ,store racks
etc ,of all shapes & profiles at all levels.

30.1 RCC With Centering ,Shuttering CUM 122.88 7864.98 966448.74 74.363 584864.83 74.36 584864.83
###
###
40 Reinforcement Work ###

40.1 REINFORCEMENT STEEL - HYSD Fe 415/ 500 MT 8.80 18000.00 158400.00 4.51 81149.43 4.51 81149.43

Page 3
AS PER BOQ Previous RA Bill-02 Present RA Bill-03 Cummulative Bill
SL NO DESCRIPTION REMARKS
UNIT QTY RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT

Collecing and fabricating in position the reinforcement steel


of high yield strength ribbed bars of various diameters and
Grade Fe - 415/ 500 conforming to IS 1786 for reinforced
concrete work. The work includes cutting, bending,
fabricating, (welding in Shear Walls if required) and placing
in position according to drawings. The reinforcement works
includes supply and use of 18G black annealed /GI binding
wire double fold to tie the bars in position and providing 0.00
precast cement/PVC cover blocks for main reinforcement to
ensure specified cover. Use Adequate Number of Chairs and
Spacer For Keeping Bars In Position Steel Supply In Adarsh
Scope and Cost of Binding wire &Cover block included in
contractor scope.chairs and spacer bars will not be paid
Extra and Considered only for Reconcilation Purpose

50 Solid Block Masonry 0.00


50.1 SBM 200MM Sqm 1079.0 454.00 489847.84 159.58 72448.78 210.48 95557.92 370.06 168006.70

Collecting and Constructing 200 mm thick Solid concrete


Blockwork in walls, piers and architectural features at all
levels using approved Solid blocks of strength 35 kg / Sqcm
in cement mortar 1:6 including curing, steel scaffolding, steel
staging and curing etc., complete with all leads and lifts and
as directed by Architect/Engineer in charge. Special care
tobe taken while packing the top course of block below
beam course of masonry is packed with polymer modified
mortar. if the mortar filling thickness exceeds over
20mm,polymer modified screed concrete to be used to pack
the gap

Basement,Ground Floor,First Floor ,Terrace Floor/Head


Room /Parapet Wall.
Cement and Blocks Supply In Adarsh Scope

50.2 SBM 100MM sqm 24.45 497.00 12151.65 14.93 7419.81 14.93 7419.81

Collecting and Constructing 100 mm thick Solid concrete


Blockwork in walls, piers and architectural features at all
levels using approved Solid blocks of strength 35 kg / Sqcm
in cement mortar 1:4 including curing, steel scaffolding, steel
staging, all leads and lifts and a concrete band 75mm thick.
with placing in position of 2nos. T or 8 longitudinal bars and
T or 8 at 200c/c transverse reinforcement at every fifth
course with M15 grade concrete mix including steel
shuttering, steel staging, curing etc., complete Rate should
including drilling the column & fixing 200mm long 50x4mm
thick MS flat bent to shape, with anchor bolts at every fifth
course, with all leads and lifts and as directed by
Architect/Engineer in charge.

Basement,Ground Floor,First Floor ,Terrace Floor/Head


Room /Parapet Wall.

Cement and Blocks Supply In Adarsh Scope

60 PLASTERING WORKS

Page 4
AS PER BOQ Previous RA Bill-02 Present RA Bill-03 Cummulative Bill
SL NO DESCRIPTION REMARKS
UNIT QTY RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT

Unless otherwise specified rates quoted for all items shall


include the following : Hacking or scarifying concrete
surfaces to be plastered or rendered, Preparation of surface by
raking out joints wetting the surface etc., Necessary scaffolding,
ladder, platform etc., for any height & depth, . And as per the drg /
project-in-charge. Preparing the surface and plaster the ceiling in
Cementmorter, with smooth finish to line and level with lime
rendering at all levels for both flat and sloped roof, includes leads
and lifts of materials, hydrating the lime 24 hours before starting
of work with necessary scoffolding , curing etc , And finishing as
mentioned in the Drg.

60.1 Internal Plastering

Prepare the surface & plaster all internal RCC/Masonry


surface in cement mortar 1:6 15mm thick with smooth finish
to line & plumb with lime rendering at all levels including
leads & lifts of material, hydrating the lime
24 hrs Scaffolding, curing etc., and finishing as mentioned in
the drg. Rate to Include Finishing Above Skirting with 5mm
groove complete as directed by Architect/engineer In
charge

Basement,Ground Floor,First Floor,Terrace Floor/HR Sqm 708.50 316.00 223886.00 545.73 172449.46 0.00 545.73 172449.46
Cement Supply in Adarsh Scope
60.2 External Plastering

Plastering external surface in cement plaster 1:5 (1 cement:


5 coarse sand), of average 20mm thick using admixture and
finished as specified in drawing, including chejja projections
providing necessary plaster grooves sponge
finish,scaffolding,all circular works ,plaster bands and
finishing as mentioned in the drawing, and rate should
include dosage of Rendercon Superadmixture or
equivalent, as per manufacturer's specification and as
directed by the project-in-charge at all heights and levels.

Drip moulding To be Provided Where ever necessary as


directed by engineer in charge or as per drawing
basement,ground floor,First Floor &Terrace Floor
Basement,Ground Floor, First Floor & Terrace Floor Sqm 1263.9 507.00 640777.02 797.39 404278.53 377.66 191475.65 1175.06 595754.18
Cement and Bonding Agent Supply In Adarsh Scope

80.2 Rough Plastering

Prepare the surface & plaster all internal RCC/masonry


surface in cement mortar 1:5 15mm thick with rough
plastering to line & plumb at all levels including leads & lifts Sqm 500.00 300.00 150000.00 0.00 0.00 0.00
of material, scaffolding, curing etc complete. Rate to include
Finishing of chasing etc., done by other agency.

70 IPS Flooring ,Screed &Flagging Concrete


70.1 IPS

Page 5
AS PER BOQ Previous RA Bill-02 Present RA Bill-03 Cummulative Bill
SL NO DESCRIPTION REMARKS
UNIT QTY RATE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT

IPS Flooring for MBR & Dress Area- Collecting and laying
of 50mm thick M15 cement concrete using with 12mm and
down size graded stone aggregate and shell be thoroughly
tamped, spread, towelled and finished smooth with power
travel and including cost of labour, curing & etc., complete as Sqm 171.18 371.00 63507.78 84.15 31218.91 45.16 16753.77 129.31 47972.67
per the specification finished smooth with a floating coat of
neat cement and including cost of labour, curing & etc.,
complete as per the specification

M20 grade Concrete and Cement Supply In Adarsh Scope

80 IPS Flooring ,Screed &Flagging Concrete

80.1 Screed Concrete

Collecting and laying M20 for Screed Concrete of 50mm Sqm 300.00 281.00 84300.00 0.00 0.00 0.00
thick, self-finished for Sunken portions

0.00 0.00
80.2 FLAGGING CONCRETE 0.00 0.00

Collecting & laying and finishing Flagging Concrete with M10


Concrete, self-finished on the top with cement mortar CM Sqm 300.00 281.00 84300.00 16.21 4554.73 16.21 4554.73
1:4, all round the building as directed by the project incharge

M7.5 or M10 grade Concrete and Cement Supply In Adarsh 0.00 0.00
Scope

80.3 Granular Sub-base Cum 40.00 162.00 6480.00 0.00 0.00

Total Amount in Rs. 3,138,188.86 1,471,644.66 308,985.72 1,751,963.31

Page 6
SK ENGINEERS AND CONSTRUCTIONS
Project Name :Adarsh Tropica
MEASUREMENT SHEET RA BILL-03
Measurement
Sl.
Description Unit Total Qty Remarks
No Nos No of Members Length Breadth Depth
10.1 Earth work (Dressing work)
Sales office out side Cum 1 1 56.76 0.7 0.1 3.973

Total Qty of Earth work excavation 3.97 Cum

50.1 200mm solid block works


a RCC Wall top at sales office Sqm 1 1 120.000 1.200 144.00
b Nala Bridge side Sqm 1 1 6.000 1.200 7.20
d Car parking near drain inside Sqm 1 1 45.000 0.400 18.00
1 1 9.000 0.600 5.40
Road Side Compound wall 1 1 14.800 0.600 8.88
1 1 27.000 0.600 16.20
1 1 27.000 0.400 10.80

Total Qty For Solid Block work 210.48 Sqm

External plastering at RCC


60.2
inside Wall
Sqm 1 1 118.020 3.200 377.66

Total Qty For External Plastering 377.66 Sqm

70.1 IPS Flooring


Sales office tent flooring Sqm 1 1 6.720 6.720 45.16

Total Qty For Ips Flooring 45.16 Sqm

80.2 Flagging concrete

Marketing office out side works Sqm 1 1 56.760 0.600 34.06

Deduction at column Sqm -1 3 0.360 0.360 -0.39


Deduction 1.2X1.2Chamber Sqm -1 2 0.600 0.600 -0.72
Deduction 2X2 Chamber Sqm -1 3 0.420 0.420 -0.53

Total Qty For Flagging concrete 16.21 Sqm