Part I - Account of Work Executed

Name of Work : Improvement to Nudurupada – Kaliahata Road from 46/000 km to 52/550 km in District of Keonjhar under State Plan for the year 2019-20
Work Number : 587/8675/1 RA Bill Number : 13 and Date : 15/12/2022

Sr.No Item Description Unit Rate Quantity Payments on the basis of Actual Measurements Remarks
Executed Upto
Date as per
Upto Date Since Previous Bill
measurement
book

1 2 3 4 5 6 7

1 Item No.1. Clearing and grubbing road land including uprooting rank vegetation, sqm 5.4500 36583.000000000 199,377.35 0.00 -
grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of 0
trees cut earlier and disposal of unserviceable materials and stacking of serviceable
materials to be used or auctioned upto a lead of 1000metres including removal and
disposal of top organic soil not exceeding 150mm in thickness as per Clause 201 of
MoRT&H Specifications for Road & Bridge works (5th Revision) &including cost,
conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for
the work etc. complete as per specification & direction of Engineer-in-charge.
2 Item No.2. Earthwork in excavation for road way and CD structures in all kinds of soil cum 42.2800 1531.6370000000 64,757.61 887.88 -
with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in
tippers, setting out, dressing of section to correct line, level, grade and camber
transporting to embankment site within all lifts and lead upto 1000mtr., utilising the
surplus earth locally for road work where ever required, back filling the excavated
earth to the extent required complete in all respect as per approved drawing
and technical specifications as per Section 900 and Clause 301 of MoRT&H
Specifications for Road & Bridge works (5th Revision) & including cost,
conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for
the work etc. complete as per specification & direction of Engineer-in-charge.
3 Item No.3. Scarifying and removing the existing bituminous road surface to sqm 3.5100 12297.600000000 43,164.58 899.26 -
the required depth as per approved drawing and technical specifications and 0
disposal of scarified materials within all lifts and lead upto 1000mtr. complete in all
respect as per Section 900, Clause 305.4.3, 305.8, 305.9.5, 501.8.3.2, 501.8.7.2 and
501.8.8.1 of MoRT&H Specifications for Road & Bridge works (5th Revision) &
including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour,
T&P required for the work etc. complete as per specification & direction of Engineer-in
-charge.
4 Item No.4. Reworking the scarified bituminous surface suitably after supplementing sqm 13.1300 12297.600000000 161,467.49 3,363.91 -
the base materials with sand and compacting finished surface as per approved 0
drawing and technical specifications as per Section 900, Clause 501.8.3.2 and
501.8.8.1 of MoRT&H Specifications for Road & Bridge works (5th Revision) &
including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour,
T&P required for the work etc. complete as per specification & direction of Engineer-in
-charge.
5 Item No.5. Loosening to a depth of 150mm, leveling and compacting original ground cum 20.6500 3779.0190000000 78,036.74 1,463.67 -
supporting embankment /sub-grade as per approved drawing and technical
specifications complete in all respect as per Section 900 and Clause 305 of
MoRT&H Specification for Road & Bridge works (5th Revision) & including cost,

Designed & Developed by C-DAC , Pune


Part I - Account of Work Executed
Name of Work : Improvement to Nudurupada – Kaliahata Road from 46/000 km to 52/550 km in District of Keonjhar under State Plan for the year 2019-20
Work Number : 587/8675/1 RA Bill Number : 13 and Date : 15/12/2022

Sr.No Item Description Unit Rate Quantity Payments on the basis of Actual Measurements Remarks
Executed Upto
Date as per
Upto Date Since Previous Bill
measurement
book

1 2 3 4 5 6 7

5 conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for cum 20.6500 3779.0190000000 78,036.74 1,463.67 -
the work etc. complete as per specification & direction of Engineer-in-charge.

6 Item No.6. Construction of embankment with approved materials deposited at cum 55.2000 1770.8670000000 97,751.86 0.00 -
site from road-way cutting and other structures with all lifts and leads graded and
compacted to meet requirement as per approved drawing and technical
specifications complete in all respect as per Section 900 and Clause 305 of
MoRT&H Specification for Road & Bridge works (5th Revision) & including
cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P
required for the work etc. complete as per specification & direction of Engineer-in-
charge.
7 Item No.7. Construction of embankment with approved materials obtained from cum 128.7100 22956.609000000 2,954,745.14 0.00 -
borrow pits by mechanical means graded and compacted to meet requirement as per 0
approved drawing and technical specifications complete in all respect as per Section
900 and clause 305 of MoRT&H Specification for Road & Bridge works (5th Revision)
& including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour,
T&P required for the work etc. complete as per specification & direction of Engineer-in
-charge.
8 Item No.10. Construction of granular subbase by providing close graded granular cum 2175.5700 2346.6050000000 5,105,203.44 52,104.90 -
subbase Grading-VI material (hard granite crusherbroken) as per Table 400-
2,satisfying all physical,chemical properties of Granular subbase material (road
aggregate), spreading in uniform layer with motor grader on prepared surface, mixing
by mix in place method with rotavator at OMC, and compacting with vibratory roller to
achieve the desired denisity complete as per clause No.401 and section 900 of
MoRT&H specification for Road & Bridge works(5th Revision) including cost,
conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for
the work etc. complete as per specification & direction of Engineer-in-charge.
9 Item No.11. Providing, filling clean sand of approved quality in road work for cum 704.9200 2054.4090000000 1,448,193.99 59,093.44 -
construction of drainage layer and foundation trenches of structures in uniform layers,
watered and rammed/ compacted as per approved drawing and technical
specifications complete in all respect as per Section 900, 2100 and Clause 401 &
304 of MoRT&H specifications for Road & Bridge works (5th Revision) & including
cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P
required for the work etc. complete as per specification & direction of Engineer-in-
charge.
10 Item No.12. Providing Wet Mix Macadam using crushed stone aggregates cum 2281.2800 5562.3600000000 12,689,300.62 1,087,463.36 -
as per approved drawing and technical specifications complete in all respect as
per Section 900 and Clause 406 of MoRT&H Specifications for Road & Bridge

Designed & Developed by C-DAC , Pune


Part I - Account of Work Executed
Name of Work : Improvement to Nudurupada – Kaliahata Road from 46/000 km to 52/550 km in District of Keonjhar under State Plan for the year 2019-20
Work Number : 587/8675/1 RA Bill Number : 13 and Date : 15/12/2022

Sr.No Item Description Unit Rate Quantity Payments on the basis of Actual Measurements Remarks
Executed Upto
Date as per
Upto Date Since Previous Bill
measurement
book

1 2 3 4 5 6 7

10 works (5th Revision) & including cost, conveyance, taxes, cess,royalties of all cum 2281.2800 5562.3600000000 12,689,300.62 1,087,463.36 -
materials, cost of all labour, T&P required for the work etc. complete as per
specification & direction of Engineer-in-charge.
11 Item No.17. Construction of dry lean cement concrete Sub- base over a prepared sub- cum 4273.4400 526.3700000000 2,249,410.61 0.00 -
grade with coarse (hard granite (crusher broken) aggregate) (Using Branded
Cement) and fine aggregate conforming to IS: 383, the size of coarse aggregate not
exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation
after blending to be as per Table 600.1,cement content not to be less than
150kg/cum, optimum moisture content to be determined during trial length
construction, concrete strength not to be less than 10Mpa at 7 days, mixed in a
batching plant, transported to site, laid and compacting with vibratory roller,
finishing and curing as per Clause 601 and section 900 of MoRT&H Specifications
for Road & Bridge works(5th Revision) including cost, conveyance, taxes,
cess,royalties of all materials, cost of all labour, T&P required for the work etc.
complete as per specification & direction of Engineer-in-charge.
12 Item No.18. Construction of un-reinforced,dowel jointed, plain cement concrete cum 6425.2800 1480.7600000000 9,514,297.61 0.00 -
pavement M-30 grade (using branded cement) over a prepared sub base 43 grade
Cement @ 400kg / cum with 20mm and down grade hard granite (crusher broken)
aggregate and fine aggregate conforming to IS 383) over a prepared sub base ,
mixed in concrete mixer as per approved mix design(M30 grade), transported to site,
laid , spread, compacted and finished in a continuous operation including provision of
contraction, expansion, construction and longitudinal joints, joint filler, separation
membrane, sealant primer, joint sealant, debonding strip, admixtures as approved,
curing compound, dowel bar, tie bars etc required for the work finishing to lines and
grades as per drawing and as per Clause 602 and section 900 of MoRT&H
Specifications for Road & Bridge works (5th Revision) including cost, conveyance,
taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc.
complete as per specification & direction of Engineer-in-charge.
13 Item No.30. Removing all type of Hume Pipes upto 600mm dia and Stacking within a rm 188.2200 157.5000000000 29,644.65 0.00 -
lead of 1000 metres including Earthwork and Dismantling of Masonry Works including
T&P, sorting the dismantled material, disposal of unserviceable material as per
Clause 202 of MORT&H Specifications for Road & Bridge works (5th Revision) &
including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour,
T&P required for the work etc. complete as per specification & direction of Engineer-in
-charge.a) Up to 600 mm dia
14 Item No.31. Earthwork in excavation for foundation of structures as per drawing and cum 53.3300 1141.2200000000 60,861.26 11,717.67 -
technical specifications including setting out, construction of shoring and bracing,

Designed & Developed by C-DAC , Pune


Part I - Account of Work Executed
Name of Work : Improvement to Nudurupada – Kaliahata Road from 46/000 km to 52/550 km in District of Keonjhar under State Plan for the year 2019-20
Work Number : 587/8675/1 RA Bill Number : 13 and Date : 15/12/2022

Sr.No Item Description Unit Rate Quantity Payments on the basis of Actual Measurements Remarks
Executed Upto
Date as per
Upto Date Since Previous Bill
measurement
book

1 2 3 4 5 6 7

14 removal of stumps and other deleterious matter, dressing of sides and bottom and cum 53.3300 1141.2200000000 60,861.26 11,717.67 -
backfilling with approved material as per clause 304 of MoRT&H Specification for
Road & Bridge works (5th Revision) including cost, conveyance, taxes, cess,royalties
of all materials, cost of all labour, T&P required for the work etc. complete as per
specification & direction of Engineer-in-charge.
15 Item No.32. Providing and laying Plain cement concrete of grade M-15 (Using cum 4568.1800 247.5200000000 1,130,715.91 215,115.60 -
Branded Cement) in levelling course of in Box cell culvert, HP culvert, drain etc
complete as per drawing and technical specification using High Strength approved
quality Cement and coarse granite aggregate conforming to Table 1000-1 with
formwork as per Section 900,1000,1500,1700 & 2100 of specifications for Road and
Bridge works of Ministry of Road Transport & Highways (5th Revision) & including
centering and shuttering, cost, conveyance, taxes, cess,royalties of all materials, cost
of all labour, T&P required for the work etc. complete as per specification & direction
of Engineer-in-charge. a) Head wall,Drain, Return Wall, Toe wall
16 Item No.33. Providing P.C.C M-15 (Using Branded Cement) grade with 40mm and cum 4840.5800 1262.5000000000 6,111,232.25 1,573,188.50 -
down grade hard granite (crusherbroken) aggregate including hoisting and laying in
open foundation/substructure of Abutment,Pier,wing wall/ return wall, cutoff wall,rigid
apron etc. of C.D. work or in places as shown in the drawing as per approved drawing
& section 1500, 1700,2100,2200,2300 of MoRT&H specification for Road & Bridge
works (5th Revision) including dewatering, centering and shuttering, cost,
conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for
the work etc. complete as per specification & direction of Engineer-in-charge.a) Sub
structure wall, Parapet Wall, Toe wall
17 Item No.34. Providing, laying and fixing in position reinforced cement concrete rm 7208.5300 137.5000000000 991,172.88 0.00 -
1000mm dia NP4 hume pipes for culverts on first class bedding of granular materials
including pointing ends fixing collars with cement mortar 1:3 for finished item of work
as per approved drawing and technical specifications complete in all respect as per
Section 900,1000 & 2900 of specifications for road and bridge works of Ministry of
Road Transport & Highways (5th Revision) including cost, conveyance, taxes,
cess,royalties of all materials, cost of all labour, T&P required for the work etc.
complete as per specification & direction of Engineer-in-charge. a) 1000 mm ? NP4
18 Item No.35. Providing & Laying of NP3 Hume pipe of following diameters for pipe rm 5742.0100 30.0000000000 172,260.30 0.00 -
culverts as per approved drawing and technical specifications as per Section 900,
1000 & 2900 of MoRT&H specifications for Road & Bridge works (5th Revision)
including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour,
T&P required for the work etc. complete as per specification & direction of Engineer-in
-charge.a) 1000 mm ? NP3

Designed & Developed by C-DAC , Pune


Part I - Account of Work Executed
Name of Work : Improvement to Nudurupada – Kaliahata Road from 46/000 km to 52/550 km in District of Keonjhar under State Plan for the year 2019-20
Work Number : 587/8675/1 RA Bill Number : 13 and Date : 15/12/2022

Sr.No Item Description Unit Rate Quantity Payments on the basis of Actual Measurements Remarks
Executed Upto
Date as per
Upto Date Since Previous Bill
measurement
book

1 2 3 4 5 6 7

19 Item No.36. b) 900 mm ? NP3 rm 4813.8200 75.0000000000 361,036.50 0.00 -

20 Item No.40. Dismantling of Cement Concrete Grade M-15 & M-20 including T&P cum 412.2200 392.1000000000 161,631.46 0.00 -
and scaffolding wherever necessary, sorting the dismantled material, disposal
of unserviceable material and stacking the serviceable material with all
lifts and lead of 1000 metres etc. complete as per Clause No. 202, Section 200 of
MoRT&H Specifications for Road & Bridge works (5th Revision) including cost,
conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for
the work etc. complete as per specification & direction of Engineer-in-charge.
21 Item No.46. Providing weep holes in abutment, wing wall, retaining wall, toe wall and rm 86.4700 116.0000000000 10,030.52 5,620.55 -
RCC drain etc with 100mm dia A.C. pipe as per approved drawing and technical
specifications complete in all respect as per Section 2200 & Clause 2706 of MoRT&H
Specifications for Road & Bridge works (5th Revision) including cost, conveyance,
taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc.
complete as per specification & direction of Engineer-in-charge.
22 Item No.48. Adjustment of other materials component (As per Cl. 31 (a) (i) of -- 0 0 1,624,763.65 0.00 -
Agreement) (Price Escalation Item) (Price Escalation Item)

23 Item No.49. Adjustment of Cement component (As per Cl. 31 (a) (ii) of Agreement) -- 0 0 149,107.69 0.00 -
(Price Escalation Item) (Price Escalation Item)

24 Item No.50. Adjustment of Steel component (As per Cl. 31 (a) (iii) of Agreement) -- 0 0 240,460.39 0.00 -
(Price Escalation Item) (Price Escalation Item)

25 Item No.51. Adjustment of Bitumen component (As per Cl. 31 (a) (iv) of Agreement) -- 0 0 644,413.73 0.00 -
(Price Escalation Item) (Price Escalation Item)

26 Item No.52. Adjustment of Pipe component (As per Cl. 31 (a) (v) of Agreement) (Price -- 0 0 100,747.57 0.00 -
Escalation Item) (Price Escalation Item)

27 Item No.53. Adjustment of Labour component (As per Cl. 31 (b) of Agreement) (Price -- 0 0 54,562.33 0.00 -
Escalation Item) (Price Escalation Item)

28 Item No.54. Adjustment of P.O.L. component (As per Cl. 31 (c) of Agreement) (Price -- 0 0 354,661.36 0.00 -
Escalation Item) (Price Escalation Item)

29 Item No.55. Adjustment for Plant & Mechinery Spare component (As per Cl. 31 (d) of -- 0 0 112,139.64 0.00 -
Agreement) (Price Escalation Item) (Price Escalation Item)

Designed & Developed by C-DAC , Pune


Total : 46,915,149.14 3,010,918.74

Deduct -4.10 % As Per Tender : -1,789,006.00 -123,447.67

Total Value of Work Done to Date (A) : 45,126,143.15 2,887,471.08

Add SGST 9.00 % 2,935,590.00 259,872.00

Add CGST 9.00 % 2,935,590.00 259,872.00

Add IGST 0.00 % 0.00 0.00

Total Value of Work Done including SGST And CGST And IGST : 50,997,323.00 3,407,215.00

Deduct-value of work shown in previous Bill : 47,590,108.00 0.00

Net Value of work since previous Bill (F) : 3,407,215.00 3,407,215.00

Figures (F) in Words Rs. Thirty Four Lakhs Seven Thousand Two Hundred Sixteen Only