Professional Documents
Culture Documents
Comp 1 Abs
Comp 1 Abs
ABSTRACT OF ESTIMATE
(A) BUILDING
1. CONCRETE WORK
2. REINFORCED CEMENT CO
3. BRICK WORK
4. FINISHING
--- -----------
TOT AL 387991.8
PILE LABOUR 37,700
COMPOUND WALL GRILL GATE 15,000
PILE STEEL (406X50) 20,300
PILE R.C.C (3.62X5500) 19,910
ADD FOR P.S.A ND CON TINGENCIE@ 0.5% 1,940
--- -----------
GR AND TO TAL 482841.8
--- -----------
836.13