COST PER LITRE
Diesel 23.00
Mobile oil 70.00
HIRE CHARGE/DAY(8hrs)
Truck 1200.00
Rate of Belder 85.00
CONSUMPTION-Km/Litre
Diesel 5
Mobile oil 140
i) Lime,Moorum,Gravel cum 7.65 22.91 26.29 29.64 32.87 36.01 2.85 2.41 2.03 8.91 8.91
Surki,building rubbish
and brick jelly
ii) Earth cum 4.25 28.64 32.86 37.04 41.08 45.02 3.56 3.01 2.53 10.18 10.18
iii) Manure or Sludge cum 7.65 24.90 28.57 32.21 35.72 39.15 3.10 2.62 2.20 8.91 8.91
iv) Excavated rocks cum 15.30 45.82 52.58 59.27 65.73 72.03 5.70 4.81 4.05 17.82 17.82
i) Sand cum 5.10 22.91 26.29 29.64 32.87 36.01 2.85 2.41 2.03 10.18 10.18
iv) Soling stone and cum 38.25 26.95 30.93 34.86 38.67 42.37 3.35 2.83 2.38 10.18 10.18
masonary stone
1.1.2 Bricks 1000nos 38.25 61.09 70.10 79.03 87.64 96.04 7.60 6.42 5.40 15.27 15.27
1.1.3 Tiles 1000nos 17.85 36.66 42.06 47.42 52.59 57.62 4.56 3.85 3.24 6.36 6.36
Note:
1. The above rates includes stacking charges.
2. For Code No. 1.1.1 the rates will be applicable to net quantities after deduction of prescribed percentage
for voids mentioned in the C.P.W.D. specification under Sub-Head "Carriage of Materials".
i) Lime,Moorum,Gravel cum 7.65 22.91 26.29 29.64 32.87 36.01 2.85 2.41 2.03 8.91 8.91
Surki,building rubbish
and brick jelly
ii) Earth cum 4.25 28.64 32.86 37.04 41.08 45.02 3.56 3.01 2.53 10.18 10.18
iii) Manure or Sludge cum 7.65 24.9 28.57 32.21 35.72 39.15 3.1 2.62 2.2 8.91 8.91
iv) Excavated rocks cum 15.3 45.82 52.58 59.27 65.73 72.03 5.7 4.81 4.05 17.82 17.82
i) Sand cum 5.1 22.91 26.29 29.64 32.87 36.01 2.85 2.41 2.03 10.18 10.18
iv) Soling stone and cum 38.25 26.95 30.93 34.86 38.67 42.37 3.35 2.83 2.38 10.18 10.18
masonary stone
1.1.2 Bricks 1000nos 38.25 61.09 70.1 79.03 87.64 96.04 7.6 6.42 5.4 15.27 15.27
1.1.3 Tiles 1000nos 17.85 36.66 42.06 47.42 52.59 57.62 4.56 3.85 3.24 6.36 6.36
1.1.4 Cement,Stone blocks tonne 17.85 20.36 23.37 26.34 29.21 32.01 2.53 2.14 1.8 25.45 25.45
G.I.,C.I.,A.C.,and
CC. pipes below 100mm
dia.,other heavy materials
rice and wheat.
1.1.5 Steel and Iron works tonne 17.85 20.36 23.37 26.34 29.21 32.01 2.53 2.14 1.8 25.45 25.45
1.1.6 Timber cum 7.65 26.18 30.04 33.87 37.56 41.16 3.26 2.75 2.32 8.91 8.91
1.1.7 Tar,Bitumen tonne 38.25 22.91 26.29 29.64 32.87 36.01 2.85 2.41 2.03 19.09 19.09
1.1.7A Solvent qtl 3.83 2.29 2.63 2.96 3.29 3.6 0.29 0.24 0.2 1.91 1.91
1.1.8 Steam coal tonne 7.65 26.18 30.04 33.87 37.56 41.16 3.26 2.75 2.32 8.91 8.91
1.1.9 S.W.pipes-
(a)100mm dia. 100 m 20.83 30.55 35.05 39.51 43.82 48.02 3.8 3.21 2.7 29.69 29.69
(b)150mm dia. 100 m 41.65 61.09 70.1 79.03 87.64 96.04 7.6 6.42 5.4 59.38 59.38
(c)200mm dia. 100 m 69.42 101.82 116.84 131.71 146.07 160.06 12.67 10.69 9.01 98.97 98.97
(d)230mm dia. 100 m 99.17 145.46 166.91 188.16 208.67 228.66 18.1 15.28 12.87 141.39 141.39
(e)250mm dia. 100 m 119 174.55 200.3 225.79 250.41 274.39 21.72 18.33 15.44 169.67 169.67
(f)300mm dia. 100 m 148.75 218.19 250.37 282.24 313.01 342.99 27.15 22.92 19.3 212.08 212.08
(g)350mm dia. 100 m 208.25 305.47 350.52 395.13 438.22 480.18 38.02 32.08 27.02 296.92 296.92
(h)400mm dia. 100 m 297.5 436.38 500.74 564.48 626.02 685.98 54.31 45.83 38.6 424.17 424.17
(i)450mm dia. 100 m 378.64 555.39 637.3 718.42 796.76 873.06 69.12 58.33 49.12 539.85 539.85
(j)500mm dia. 100 m 416.5 610.93 701.03 790.27 876.43 960.37 76.03 64.17 54.03 593.83 593.83
(k)600mm dia. 100 m 520.63 763.67 876.29 987.83 1095.54 1200.46 95.04 80.21 67.54 742.29 742.29
1.1.10 R.C.C.pipes,A.C.pipes
Steel cylinder,R.C.Pipes,
C.I.Pipes and Unrein-
forced cement pipes
(a)100 mm dia 100 m 34.14 50.08 57.46 64.78 71.84 78.72 6.23 5.26 4.43 48.67 48.67
(b)125 mm dia 100 m 45.6 66.89 76.76 86.53 95.96 105.15 8.32 7.03 5.92 65.02 65.02
(c)150 mm dia 100 m 56.9 83.46 95.77 107.96 119.73 131.2 10.39 8.77 7.38 81.12 81.12
(d)200 mm dia 100 m 92.56 135.76 155.79 175.61 194.76 213.41 16.9 14.26 12.01 131.96 131.96
(e)250 mm dia 100 m 131.53 192.93 221.38 249.56 276.77 303.27 24.01 20.26 17.06 187.53 187.53
(f)300 mm dia 100 m 162.57 238.46 273.63 308.46 342.09 374.85 29.68 25.05 21.09 231.79 231.79
(g)350 mm dia 100 m 192.53 282.4 324.05 365.3 405.13 443.93 35.15 29.66 24.98 274.5 274.5
(h)400 mm dia 100 m 310.36 455.24 522.38 588.87 653.08 715.62 56.66 47.81 40.26 442.5 442.5
(i)450,500 mm dia 100 m 379.33 556.41 638.46 719.73 798.21 874.65 69.25 58.44 49.21 540.83 540.83
(j)600,700,750 and
800 mm dia. 100 m 568.99 834.61 957.70 1079.6 1197.31 1311.98 103.87 87.66 73.82 811.25 811.25
Note:
1. The above rates includes stacking charges.
2. For Code No. 1.1.1 the rates will be applicable to net quantities after deduction of prescribed percentage