: 05
Supplier Name : M/S Yogesh Engg. Works. Auditor Name : Vinay Sharma Verification Auditor Name / Signature : Total Nonconformance : 21
Major/
S.No. Ref. Check Sheet point Action Point Revised Target
Observation Minor/ Root Cause Action To be Taken Responsibility Target Date Non Conformity Verification Observation Open/Closed Date
Remark
Improvement
Daily/periodic check Instrument check but records are not available. Need to kept Major
9 System failure Records will be maintained Mr. Prashant 5.06.21
5B.1 records.
Daily/periodic check Jigs checking frequency decided but need to check every set- Major
10 Lack of information Setup approval modified Jig recording will be there Mr. Prashant 24.06.21
5C.1 up
Grasping process capability SPC done only foe Kubota Parts not for Escorts part, Need to Major
15 Not demanded by EAM available for EKI Will be made for EAM also now onwards Mr. Prashant 15.06.21
9.1 do SPC for ESCORTS parts is well.
Transmission of quality information Procedure available . But evedence of communication not Major
17 Training records available Training will be given Mr.Prashant
12.1 available. Communication done only verbal need evedant.
Lot control WI for tracebility is available YEW but need procedure for Major
18 WI was enough as per knowledge Procedure will be made Mr.Prashant 16.06.21
13.1 tracebility & implement the same.
Arranged (sierra) and ordered No activity done for 2S & condition of plant 2S is very bed.
Major Will improve the same and also new plant is in
21 environment (seiton) (2S) Need to make Zone & decide Zone Leader & do audit & Score Space constraint Yew Team 25.06.21
construction
18.1 of 2S audit display on the bord.
Classification | ESCORTS-INTERNAL
F.No. YEW/QA/001
YEW YOGESH ENGINEERING WORKS Issue Date 17.06.2021
गुणवत्ता नीति
योगेश इंजीनियरिंग वर्क्स (M/s Yogesh Engineering Works) ग्राहक और
उपयुक्त आवश्यकताओं के अनुसार सटीक बने पार्ट्स के निर्माण के लिए प्रतिबद्ध है। हम अपनी
गुणवत्ता प्रबंधन प्रणाली में निरंतर सुधार के लिए भी प्रतिबद्ध हैं |
Mr.G.S Dahiya
(MD)
Mr.S.N Bharti
(Plant Head)
Mr.Prashant Singh Mr.Deepak Mr.CP Singh Mr. Harinder Tanwar Mr. Suresh
(QA Head) (D&D Head) (Purchase Head) (Account Head) (Conv. Shop)
7 Meta Forge (India) Mr. Rajeev Arora 9891149191 12/09/2003 Forging Parts
Mr. Vasim
10 Neha Forgings 9871267172 18/03/2008 Forging Parts
Ahmed
11 Nirupam Engineers (P) Ltd. Mr. Ravi Dwivedi 9311063428 28/06/2009 Hardening
Prepared by Approved by
Format No:- YEW/PUR/F-006
Forging
2 Sant Forge Once in Year
Parts
3
Sukhmani Engineering Once in Year Machining
Works
Forging
9 MGA Industries Once in Year
Parts
Prepered by:- Deepak Reviewed by:- Mr. Prashant Singh Approved by:- Mr. Prashant Singh
Format No:- YEW/QA/F-005
Prepared by:- Deepak Reviewed by:- Mr. Prashant Singh Approved by:- Mr. Prashant Singh
Rev.No. Rev.History Prepared by Approved by
Measuring Observation 2
Sr.No. Parameters Specification Sample Size Observation 1 (If first time piece Remarks
Method
rejected than filled)
8 -
10
11
12
13
14
15
16
17
18
19
20
Fixture Condition
Guiding Pin,Block,Clamps & Sliders
1 is in good condition and working
properly.
3
There should be no wearing &
tearing
01 Format Change i.e. setting approval criteria added dated on 07.06.18 Mr. Deepak Mr. G.Singh
02 Format Change i.e. Production incharge & QA Incharge Sign column Deleted Mr. Deepak Mr. P.Singh
Prepared By Approved by