IBADAN URBAN FLOOD MANAGEMENT PROJECT (IUFMP)

1STPOOLOF LONG-TERM
TERM INVESTMENTS FOR FLOOD CONTROL IN IBADAN CITY OF
OYO STATE:Lot
Lot #2 (Ogbere Channel), Lot #1A, Lot #1B, Lot #1C & Lot #2A

Project No & Title: CHANELIZATION OF AGODI, OROGUN, KUDETI Pheman Peniel


FOR FLOOD CONTROL IN IBADAN CITY, OYO STATE Consultants Ltd.

REQUEST FOR INSPECTION (RFI)


Date:7/12/2022
Request No:001

Client: Consultant: Contractor: A.


Inspecti
DEPHANNY/DUTUM JV on
request
ed at:

Site Name: AGODI, KUDETI, OROGUN Time:


11:0008:30
am Date: 07/12/2022
Drawing No: SHD-DDJV-AO First Inspection ☐V Second Inspection ☐ Third Inspection ☐

B. Purpose of Inspection:

Describe activity on site:


1. Concrete Works
Orogun: Ch 1+ 430 – Ch 1+465,

Submitted by: Engr Oloko A Felix, PMP Signature:

C. Inspection Carried out by:


Consultant’s Representative Name and Position: Engr Eniola Bolaji (re)

Date: 09/12/2022 Time: 03:49 PM Sign:

D. Consultant’s Representative Comments:


-Adopt Proper placement of the concrete spacers
-Ensure the presence of the Representative of the University of Ibadan during the batching of concrete to collect samples during batching and at the point of discharge
-Ensure the reinforcement sizes are adequate and of the recommended size.

E. Consultant’s Inspection Report:


A ☐ B ☐x C ☐ D ☐
Approved as Submitted Approved as Noted Revise and Resubmit Rejected
before work proceed

F. Received by Contractor: (please sign below, retain the original & return copy)

Name: Sign: Date: