Using Equation 19.1 with equation 19.1c & 19.1d for the above-ground storage
Qa: 2248.27
tc: 60.00
Qp: 2248.27
Tcs: 60.00
b = 4 x Qa x Q p b= 20218812.02
Using Equation 19.2 with Equation 19.2a and 19.2b for above ground storage
SSR (m3)
2500.00
2000.00
1500.00
SSR (m³ )
SSR (m3)
1000.00
500.00
0.00
5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00
td(mins)
Conclusion
Based on substorm requirement and maximum surface runoff as above, we need to provide detention pond of total volume 2343m3
minimum.
Design Approach 2: Design based on fractile values with incorporated confidence limit
Mean Site Storage, SSRmean = 1608.19 m³
Site Storage Standard Deviation, SSRstdev = 473.23
Probability of non-exceedance (two-sided) = 0.2000 (80% confidence level)
Confidence interval (two-sided) = 0.9000
Fractile value = 1.2816
Best estimate SSRbest = 2214.67 m³
OSD 1 size: Area x Depth = 1125.60 m³
1876.00 0.60
OSD 2 size: Area x Depth = 2543.40 m³
4239.00 0.60
Total Volume 3669.00 m³
Conclusion
Taking into consideration of rainfall uncertainties, substorm requirements and best estimate surface runoff based on 80% confidence level as
above, we need to provide detention pond of volume 2343m3 minimum.