Micropile Elevation Pile Head Treatment (Fixed)
Micropile Elevation Pile Head Treatment (Fixed)
TN
29.11.2022
PROJECT GLORY
COMMENTS RESPONSE SHEET (CRS)
.
Date: 9-Nov-22
CRS No: OTHERS-LNG-CVS-DWG-8900-0237-0004_00-CRS
Rev No: 00
General comments:
1. To show pile cut off level.
2. Show pile schedule.
2 Dwg change to Micropile details
3. Show pile starter bar details.
4. Water stop to be installed at construction joint.
5. To show construction joint at reasonable locations.
Internal
PROJECT GLORY
COMMENTS RESPONSE SHEET (CRS)
.
Date: 9-Nov-22
CRS No: OTHERS-LNG-CVS-DWG-8900-0237-0004_00-CRS
Rev No: 00
Internal
PROJECT GLORY
COMMENTS RESPONSE SHEET (CRS)
.
Date: 9-Nov-22
CRS No: OTHERS-LNG-CVS-DWG-8900-0237-0005_00-CRS
Rev No: 00
General comments:
1. To show pile cut off level.
2. Show pile schedule.
2 Dwg has been cancelled
3. Show pile starter bar details.
4. Water stop to be installed at construction joint.
5. To show construction joint at reasonable locations.
Internal
PROJECT GLORY
COMMENTS RESPONSE SHEET (CRS)
.
Date: 9-Nov-22
CRS No: OTHERS-LNG-CVS-DWG-8900-0237-0005_00-CRS
Rev No: 00
4 To ease construction work and better quality control, recommende to keep only 1 or 2 Type only. Dwg has been cancelled
Internal
PROJECT GLORY
COMMENTS RESPONSE SHEET (CRS)
.
Date: 9-Nov-22
CRS No: OTHERS-LNG-CVS-DWG-8900-0237-0005_00-CRS
Rev No: 00
Internal