Points to discuss

1. Gas purification and bag house shifting to right side.


2. Low voltage room Missing
3. Cable trench construction Plan
4. Plinth beam plan
5. Embedded parts up to 4.8m
6. Size and type of bolts WRT to load given.
7. Block masonry (Up to Roof)??
8. Thinning of PB of air path and Air path room.
9. Air path sections clarification
10. 4.8m Bottom embedded parts
11. 4.8m Top Embedded parts
12. Cooling water path from 4.8m floor
13. Front screen foundation
14. Baffle addition
15. Round Wheels Foundation
16. Small Ground wheel Foundation
17. C
Cal ci um Car bi de1. 1. 3 钢结构工程 Steel work Engineering 174 21- Dec- 22 12- J un- 23 o
25
o
钢结构制作 Steel work
Cal ci um Car bi de1. 1. 3. 1 85 21- Dec- 22 15- Mar - 23 li
26 manufacturing
n
g water lines under or over ground.

As per schedule following tasks can be started within next 2 Months.

1. Steel work Engineering from 21 December 2022 to 12 June 2023.


2. Steel work manufacturing from 21 December 2022 to  15 March 2023.
3. General gas pipeline Engineering 01 December 2022 to 30 December 2022.
4. General electrical utilities work
a. 10KV substation project from 01 December 2022 to 19 April 2023.
5. Pipe gallery and bridge engineering from 01 December to 12 March 2023.
a.       Pipe gallery foundation engineering from 01 December 2022 to 30 December 2022.
b.       Pipe gallery production and installation works 01 December 2022 to 29 January 2023.
c.       Cable laying works 30 January 2023 to 12 March 2023.
d.       Clean furnace gas pipeline engineering 30 January 2023 to 28 February 2023.

Embbeded Parts Nut bolts

Baffle addition