1. Basic Data

Height of Pole = 70 mt
Top Diameter of Pole = 400 mm
Bottom Diameter of Pole = 1800 mm
Uniform Diameter Height = 23.2 mt
Yield Stress of Pole Plate(fy) = 250 MPa
Thickness of Pole Plate = 10 mm
Terrain Category = TC-2
Basic Wind Speed (Vb) = 47 m/s ……………..As per Tender
Class of Structures = All general buildings being pole or mast Structure n
Risk Coefficient (k1) = 1 human occupency and no or v
K2 at 10 = 1 human life
K2 at 15 = 1.05
K2 at 20 = 1.07
K2 at 30 = 1.12
K2 at 50 = 1.17
K2 at 100 = 1.24 IS 875(P-3):2015
K2 at 150 = 1.28
(Topography Factor) K3 = 1
Importance in cylonic region = All other Structures
K4 = 1
Kd (Wind Directionality Factor) = 1
Ka (Area Averaging Factor) = 0.85
Kc = 1
Density of Pole Material = 78.5 kN/cu.m
Modulus of Elasticity E = 200000 N/sqmm

Design Wind Speed Vz can be calculated as per following formulae.

Vz = k1× k2× k3× k4× Vb IS 875(P-3):2015


Project : --
Client: --
Agency : --
Consultant: --
Designed by: -- Rev : R0
Checked by: -- Date : 21/12/2022

Vz at 10 m = 47.00 m/s
Vz at 15 m = 49.35 m/s
Vz at 20 m = 50.29 m/s
Vz at 30 m = 52.64 m/s
Vz at 50 m = 54.99 m/s
Vz at 100 m = 58.28 m/s
Vz at 150 m = 60.16 m/s

Wind Pressure at Height Z is calculated by Following Formulae


Pz = 0.6 × VZ2 IS 875(P-3):2015

Pz at 10 m = 1.33 kN/sq.m
Pz at 15 m = 1.46 kN/sq.m
Pz at 20 m = 1.52 kN/sq.m
Pz at 30 m = 1.66 kN/sq.m
Pz at 50 m = 1.81 kN/sq.m
Pz at 100 m = 2.04 kN/sq.m
Pz at 150 m 2.17 kN/sq.m

Design Pressure
Pd PZ× kd× kc× ka IS 875(P-3):2015

Pd at 10 m = 1.13 kN/sq.m
Pd at 15 m = 1.24 kN/sq.m
Pd at 20 m = 1.29 kN/sq.m
Pd at 30 m = 1.41 kN/sq.m
Pd at 50 m = 1.54 kN/sq.m
Pd at 100 m = 1.73 kN/sq.m
Pd at 150 m = 1.85 kN/sq.m

Drag Co-efficient = 0.6 Table 25 IS 875 part 3


Project : --
Client: --
Agency : --
Consultant: --
Designed by: -- Rev : R0
Checked by: -- Date : 21/12/2022

Wind Force = Cd * A * Pd Eq. 3 of ANSI/ NAAMM FP 1001-07


Bending Moment = Wind Force * Lever Arm of Individual Segment
2. Calculation for Bending Moment Due to Wind Pressure on Pole

Distance Wind
Length of Height Dia of Pole Avg Pole Wind Area of Drag Co- Bending
from Force on
Segment Segment from GL at height h Diameter Pressure Segment efficient Moment
Centroid Segment
(m) (m) (m) (m) (kN/sq.m) (sq.m) (Cd) (kN m)
(m) (kN)
1 5.8 5.8 2.9 1.50 1.5 1.13 8.70 0.6 5.88 17.05
2 5.8 11.6 8.7 1.50 1.5 1.13 8.70 0.6 5.88 51.16
3 5.8 17.4 14.5 1.50 1.5 1.23 8.70 0.6 6.42 93.14
4 5.8 23.2 20.3 1.50 1.5 1.29 8.70 0.6 6.75 137.07
5 5.8 29 26.1 1.36 1.4 1.37 8.30 0.6 6.80 177.53
6 5.8 34.8 31.9 1.23 1.3 1.43 7.51 0.6 6.43 205.00
7 5.8 40.6 37.7 1.09 1.2 1.46 6.72 0.6 5.90 222.47
8 5.8 46.4 43.5 0.95 1.0 1.50 5.93 0.6 5.34 232.30
9 5.8 52.2 49.3 0.82 0.9 1.54 5.14 0.6 4.74 233.88
10 5.8 58 55.1 0.68 0.8 1.56 4.35 0.6 4.08 224.64
11 5.8 63.8 60.9 0.55 0.6 1.58 3.56 0.6 3.38 206.03
12 5.8 69.6 66.7 0.41 0.5 1.61 2.77 0.6 2.67 177.99
13 0.4 70 69.8 0.40 0.4 1.62 0.16 0.6 0.16 10.97
Total 64.44 1989

Base Shear = 64.44 kN


Bending Moment at Base = 1989.24 kN m

3. Calculations for Bending Moment Due to Force Exerted by Flag on Pole


Eq.4M of ANSI/ NAAMM FP 1001-07
Force Exerted by Flag on Pole , WF in newton = 0.1022* V2*(√AF)*Ch*G
Where,
V = 3-Second Gust wind Speed in m/s
AF = Area of Flag in Sq.m
Ch = co-efficient of height for wind pressure,calculated at
top of flag
G = Gust effect Factor,Use minimum Value of 1.14
Project : --
Client: --
Agency : --
Consultant: --
Designed by: -- Rev : R0
Checked by: -- Date : 21/12/2022

Length of Flag = 36 mt
Height of Flag = 24 mt
G = 1.25
CH = 1.45 TABLE: 3.2.3A,ANSI/NAAMM FP 1001-07
Area of Flag = 864 Sq.m
Wind Force Exerted by Flag Wf = 12.03 kN
Lever Arm = 58 mt
Bending Moment due to Flag Mf = 698 kN m
Total Bending Moment M=Mp+Mf = 2686.8 kN m

4. Calculations For Axial Load REF: ANSI/ NAAMM FP 1001-07

Axial Load P, equal to the dead load of the pole ,in addition to that it includes string load, flag load and
other accessories load. Which might be 20% of the pole weight.

Length of O/O Thickness I/I Radius of Area of Section


Weight of
Segment Segment Diameter of Section Diameter gyration Section Inertia (mm^4) Modulus
Pole (kN)
(m) (m) (mm) (m) r (mm) (sqmm) (mm^3)

1 5.8 1.50 12 25.54 1.48 66.81 50096 15401664519 20535552.69


2 5.8 1.50 12 25.54 1.48 66.81 56096 15526664519 20702219.36
3 5.8 1.50 12 25.54 1.48 66.81 56096 15526664519 20702219.36
4 5.8 1.50 12 25.54 1.48 66.81 56096 15526664519 20702219.36
5 5.8 1.36 10 19.36 1.34 58.17 42527 9741526496 14287165.15
6 5.8 1.23 10 17.41 1.21 55.17 38244 7084937576 11545093.26
7 5.8 1.09 10 15.46 1.07 51.99 33961 4961409030 9094944.873
8 5.8 0.95 10 13.51 0.93 48.60 29679 3311246181 6936719.843
9 5.8 0.82 10 11.56 0.80 44.95 25396 2074754351 5070417.943
10 5.8 0.68 8 7.71 0.67 36.72 16941 962254301.6 2821647.952
11 5.8 0.55 8 6.15 0.53 32.79 13515 488573938.3 1790545.052
12 5.8 0.41 8 4.59 0.39 28.33 10088 203263780.1 992979.6358
13 0.4 0.40 8 0.31 0.38 28.00 9852 189316696.1 946583.4807

Self Weight of Pole = 198.24 kN


Additional Load = 39.65 kN
Total Vertical Load (P) = 237.89 kN
Project : --
Client: --
Agency : --
Consultant: --
Designed by: -- Rev : R0
Checked by: -- Date : 21/12/2022
5. Calculation for Shear Force
Total Shear Force on pole (Wt) = Shear Due to Wind +Shear Due to Flag
Total Shear = 76.46 kN
6. Stress Analysis REF: ANSI/ NAAMM FP 1001-07
Permissible stresses
Allw. Axial Stress = π2E(r/2L)2 /1.95 Eq. 27
Allw Bending Stress = 0.6*Fy
Allw.Shear Stress = 0.33*Fy

Area of pole at base of segment-2 = 0.25*Π*(D22-D12)


= 56096.3 Sq.mm
Moment of Inertia of segment-2 (Ie) = Π*(D24-D14)/64
= 15526664519.45 mm4
Section Modulus of segment-2 (Z) = Ie/(D/2)
= 20702219.36 mm3

Axial stress at base of segment -2 = P/A = 4.2 N/Sqmm Eq. 21


Bending stress at base of segment -2 = M/Z = 129.79 N/Sqmm Eq. 22
Shear Stress at base of segment-2(τ) = 2*Shear = 2.73 N/Sqmm Eq. 23
Area

Bending Total
Length of Axial Axial Stress Bending allowable Shear allowable
allowable Moment Shear
Segment Segment Force (P) (fa) Stress (fb) bending Stress (fs) shear
axial stress (M) Foece
(m) kN N/sqmm (N/sqmm) stress (N/sqmm) stress
(kN m) (kN)
1 5.8 237.89 4.75 33.58 2687 129.8 199.50 76.46 2.73 109.73
2 5.8 212.35 3.79 33.58 2204 106.45 199.50 70.58 2.52 109.73
3 5.8 186.81 3.33 33.58 1811 87.501 199.50 64.70 2.31 109.73
4 5.8 161.27 2.87 33.58 1455 70.274 199.50 58.28 2.08 109.73
5 5.8 135.73 3.19 25.46 1193 83.501 199.50 51.53 2.42 109.73
6 5.8 116.37 3.04 22.89 914 79.155 199.50 44.73 2.34 109.73
7 5.8 98.96 2.91 20.33 673 74.007 199.50 38.30 2.26 109.73
8 5.8 83.49 2.81 17.77 468 67.477 199.50 32.40 2.18 109.73
9 5.8 69.98 2.76 15.20 296 58.309 199.50 27.06 2.13 109.73
10 5.8 58.42 3.45 10.14 152 54.038 199.50 22.31 2.63 109.73
11 5.8 50.70 3.75 8.09 35 19.481 199.50 18.24 2.70 109.73
12 5.8 44.55 4.42 6.04 9 8.7426 199.50 14.85 2.94 109.73
13 0.4 39.96 4.06 1240.03 0.03 0.0332 199.50 12.18 2.47 109.73
Project : --
Client: --
Agency : --
Consultant: --
Designed by: -- Rev : R0
Checked by: -- Date : 21/12/2022

Segment -1 has sleeve. Size of 500 x 2000mm in size in elevation


Sleeve Size = 500 x 12 mm in plan
Area = 50096.2784 Sqmm
MI = 1.5402E+10 mm^4
Section Modulus = 20535552.7 mm^3
Axial Force at base of Segment-1 = 238 kN
Bending Moment at Base of Segment-1 = 2687 kN m
Shear at Base of Segment-1 = 76.46 kN
Axial stress at base of segment -1 = 4.75 N/sqmm
Bending stress at base of segment -1 = 130.85 N/sqmm
Shear stress at base of segment -1 = 3.05 N/sqmm

6a. Check For Combined Stress REF: ANSI/ NAAMM FP 1001-07

Combined Stress Ratio = fa/(0.6*fy*1.33)+fb/(CA*Fb)+(fs/Fs)2 <=1.0 Eq. 25 & 26 of ANSI/


Where, CA = 1-(0.38*DP*L2/(2.46*E*IB))/0.52 NAAMM FP 1001-07
1 2 3 4

Segment fa/(0.6*fy 1+3+4 Check


CA fb/(CA*Fb) (fs/Fs)2
*1.33)

1 0.0238 0.9 0.73 0.00062 0.76 OK


2 0.019 0.9 0.58 0.00053 0.60 OK
3 0.0167 0.9 0.47 0.00044 0.48 OK
4 0.0144 1.0 0.37 0.00036 0.38 OK
5 0.016 1.0 0.44 0.00049 0.45 OK
6 0.0153 1.0 0.41 0.00045 0.43 OK
7 0.0146 1.0 0.38 0.00042 0.40 OK
8 0.0141 1.0 0.35 0.0004 0.36 OK
9 0.0138 1.0 0.30 0.00038 0.31 OK
10 0.0173 1.0 0.28 0.00058 0.30 OK
11 0.0188 1.0 0.10 0.0006 0.12 OK
12 0.0221 1.0 0.04 0.00072 0.07 OK
13 0.0203 1.0 0.00 0.00051 0.02 OK