12 24 36 48 60 11x 23x 35x 47x 59x Varian OTR Angsuran Total DP Angsuran Total DP Angsuran Total DP Angsuran Total DP Angsuran Total DP Ultimate 4x4 1,322,700,000 88,180,000 369,034,000 46,430,000 327,284,000 32,823,000 313,677,000 26,486,000 307,340,000 23,067,000 303,920,000
Eclipse Cross 20%
12 24 36 48 60 11x 23x 35x 47x 59x Varian OTR Angsuran Total DP Angsuran Total DP Angsuran Total DP Angsuran Total DP Angsuran Total DP Ultimate AT 2WD (Black) 488,750,000 32,584,000 138,624,000 17,190,000 123,230,000 12,174,000 118,214,000 9,840,000 115,880,000 8,654,000 114,694,000 Ultimate AT 2WD (White) 491,750,000 32,784,000 139,460,000 17,295,000 123,971,000 12,248,000 118,924,000 9,900,000 116,576,000 8,707,000 115,383,000 Ultimate AT 2WD (Red Diamond) 493,750,000 32,917,000 140,017,000 17,365,000 124,465,000 12,298,000 119,398,000 9,940,000 117,040,000 8,742,000 115,842,000 Keterangan: Terdaftar dan diawasi oleh:
1. Asuransi All Risk + TJH 10 Juta
2. Perhitungan menggunakan skema ADDM + NI Include 3. Paket diatas tidak mengikat, sewaktu - waktu dapat berubah, disesuaikan dengan situasi & kondisi 4. Berlaku khusus Indonesia International Motor Show