WBS Creation
WBS Creation
WBS Creation
ERPLOGIN
User id 99900535
Password ramu@1978 (SDE Ele)
Enter T Code: CN41
Network Initial Screen Appears
Network profile:
Click :Enter
Click Enter
Save
Click Save
ATTACH DOCUMENT
Select z00…..1
CJ02
Proj Def wbs no
Click on triange:
Enter
Wbs element changed
i. Select WBS Element of EW
Works.
Then select second row which
corresponds to level 2 WBS. Go to
details,
ii. Click on Details/ dropdown menu – WBS Element Customer
fields.
Click on Notesheet
Click on Display document, check for attached document
Come back
Check the amount
Don’t save
Sent email the note sheet
Create Notification with Mtce. order - Extl. Services
( Refer Breakdown Process Manual page 225 - 325 )
Create,Assign & Ackldge the Notification using steps 1 to 3 of EXERCISE 1 ( Breakdown
1
Notification )
2 Creating Order
Enter /niw22 in Transaction window ( or search notification no. by IW28 )
By default Notificn No. appears; if not enter it
Enter Click on Order icon; Create order window pops up; click to continue
Enter Press
Ignore any mesg about date and continue Enter
Objct infm window pops up; click to continue
Press
Click Operations tab; Goto Control Key field; select PM03 Enter
Information window pops up; click to continue; Error window pops up; click to
continue
Enter Material Group: eg .2001011, Pur Grp: eg.040, Requisnr: in the pop up window
Click External tab at the bottom;
Enter Purchasing Organization: Decentralized 2000
Enter Servcie No(if available):eg. 73000030 , if Not available use Short text field, Qty:eg2,unit:eg ea,
Press Gross Price: eg.2000 ; Cost element: eg.5020812
Enter Click Save & Notedown the Order No.
3 Release of Order
Note : Finance person will review cost reflecting in GL for respective work using Tcode
FS10N/F.08/GR55
Click on accounting document
Note : Cost centre (2417301) and R&M GL (5020805) in combination correctly debited.
Vendor Payment once approved in note-sheet can be realized through ERP by Purchase
Order and Service entry sheet/ Goods Receipt through MIGO route in the following way:
b. Purchase order once created is stored in the inbox, SAP Business Workplace, of
the initiator and can be forwarded to the next higher authority through the workflow by writing
the user ids of the reviewer and Final Approver.
c. After approval of P.O., a Service Entry Sheet is created by T-code ML81n against the
P.O. in order to measure the services marked in the P.O. In case the Purchase Order is for
procurement of Material, then Goods Receipt is to be done with the help of T -code MIGO.
d. Service Entry sheet once created is stored in the inbox, SAP Business Workplace, of
the initiator and can be forwarded to the next higher authority through the workflow by writing
the user ids of the reviewer and Final Approver. There is no workflow for MIGO approval
e. The original vendor invoice is forwarded to Finance section for payment either
with copies of PO and material document/SES or mentioning ERP system generated PO
no. and SES/Material document no. in sanction memo as per their requirement. AO (Claims)
in Finance section run the T-code MIRO, Invoice verification, and create liability. The created
liability is forwarded to competent authority through workflow for release of payment
block and subsequent payment by Central Settlement Cell (CSS).
Purchase Requisition
A requisition defines the need for a material or service. It is the primary document in the
purchasing cycle. Purchase Requisition for services will be used to procure external services.
The requisition is assigned a PR number which is subject to release/approval through
a workflow process. Only after approval the requisition is available for further processing.
Write T-code me51n “Create Purchase Requisition” in title Bar and press enter. Below
screen
appears.
Steps for creating Purchase Requisitions:
1. Write PR Type. Select from dropdown. (a) need base requisition , (b) Service Requisition
2. Write Description of the Requisition in Header Note. The header note will be displayed in
the print preview of PR.
3. Write Account Assignment as K (Cost center)
4. Write Item category as D (Service) in case of service procurement or leave it blank in case
of procurement of material
5. Write material Code in case material is to be procured
6. Write Description of item in “Short Text” and PO Quantity
7. Write material Group Code
8. Write Plant Code, 1002 in case of BSNL CO
9. Write
a. Purchase Organization – 2000
Purchase Group – 010, A10, I10, M10 in case of BSNL CO
10. Write Requisitioner name
11. Write Tracking No. and press enter
12. System will ask for maintaining Services in Item data Tab of the Create Purchase Requisition
13. Maintain services in “ Short Text”. Short Text should be within 40 characters.
14. Write Quantity to be procured
15. Write the unit
16. Write the Gross price and press enter.
17. System will ask for G/L Account and Cost center. Write the appropriate G/L Account and
Cost center and press enter.
18. Once all the required fields are filled completely then select the Icon Check at the top of
the screen.
19. If system does not display any error message then we can save the document by
4. Click on the Selection Variant and select “Purchase Requisition”. The above
screen appears.
5. Write Purchase Organization.
6. Write Purchasing Document number. (In this case PR number)
10. All the relevant details maintained in the PR will automatically populate to Purchase
Order.
11. If any detail is not maintained in the PR, then it is to be entered manually in the PO.
11. Once all the required fields are filled completely then select the Icon Check at the
top of the screen
12. If system does not display any error message then we can save the document by
clicking on the Save button . and a Purchase Order number is generated at the bottom
of the screen.
Service Entry Sheet
After approval of P.O., a Service Entry Sheet is created by T-code ML81n against the
P.O. in order to measure the services performed by the vendor as per the P.O. The
service entry sheet is a list of all planned services that have actually been performed. It
is the abstract of the measurement book. The actual payment to vendor will be made in
accordance with the duly approved Service Entry Sheet.
1. Click on the Other Purchase Order button and enter the PO number
in the following window and press Enter.
2. Click on the Create Entry Sheet icon and type short text in the short text field
Approved Service Entry sheet along with the vendor invoice will be forwarded to
Finance section for payment. Finance section will run the T-code MIRO, Invoice
verification, and verify the vendor invoice against the Service Entry Sheet. In case, the
invoices match, the same may be saved and is forwarded to competent authority
through workflow for release of payment block and subsequent payment
Q) How to see FI document posted when a Service Entry Sheet is
released?
Ans) A FI document gets posted when a SES is released. Entry will be debit expenditure a/c
and credit GR / IR clearing account. Note: Accounting document will not be posted if SES is
only saved but not released. Use t-code ME23N to Display Service order. Following screen
appears.
Click on “other purchase order” button and input Service order number to be displayed and press enter.
Click on account assignment tab under item detail. You can see the GL and cost centre. To
see input tax code selected, click on invoice tab under item detail.
In the above example there is only one item i.e item 10 in the service order. If item 20 is
also there in the service order, then select item detail of item. Screen shot given below.
TEMPORARY ADVANCE
1. Mandatory information to be checked by the user who is applying Temporary Advance in
ERP
a. Please Run T Code „PA20‟ and fill Infotype „0105‟ and subtype „0001‟ (to check System User
ID).
b. Please Run T Code „PA20‟ and fill Infotype „0001‟ and display to see Org-Assignment.
c. Please fill name of the Company Code after displaying Org-Assignment as given in step „b‟:
.
d. Please fill name of the Business area (BA) Code after displaying Org-Assignment as given in
step „b‟: .
2. To process the TAR (Temporary Advance Request), the following relationship has to be
checked:
IFA Relationship with GM Run T-CODE PO13 & Click on Relationship If this relationship is
Position and Overview , check relationship as given not maintained plz
below: Create it using T-
A|Z01 Has the IFA Code „PO13‟.
Looking after Run T-CODE PO13 & check Relationship If this relationship is
B|Z02 Is Looking After in case of vacant not maintained plz
position in TAR hierarchy work flow. Create it using T-
Code „PO13‟.
JOB ID Run T-CODE PO13 & check Relationship If this relationship is
B|007 Is described by for each position in not maintained plz
TAR hierarchy work flow. Create it using T-
Code „PO13‟.
Roles for Temporary ZFI_temp_adv_req_Company Code_BA Use T-Code „SU01D‟
Advance Code
5. Reviewer can reject and IFA can amend the amount of advance. Final approver can approve
with or without amendment and can reject also. After final approval TAR document will post
and payment by CSC will be received in Bank A/c.
6. Temporary Advance Process (Settlement) :
a) Use T-code ZFI069_2_2, for settlement of temporary advance, fill all details with correct
CO Object & save. Again run this T-code with Edit option and submit to Claim Office for
approval.
b) Claim officer will use T code ZFI069_3_1 to acknowledge, check details and forward
for approval.
c) After final approval by GM settlement document will post and Employee vendor will
get cleared automatically.
WORKFLOW OF THE TEMPORARARY ADVANCE REQUEST(TAR)
6. AM (Initiator) will SBWP Check Inbox and once Expenses TAR history will
receive a mail for mail for payment is done updated with
approval of TAR and received officer can Payment
Payment received. withdraw money for document.
expenditure
7. Create TAR ZFI069_2_2 Give the advance Fill all the TAR settlement
Settlement request number and details will be saved.
Click on Create correctly with
CO Object &
Cost center,
and Save
8. Change and submit ZFI069_2_2 Enter TAR no Tar Once TAR
for approval T0000 & Select submitted to Settlement
claim officer submitted no
Edit . Do changes if for bill change is
required and Submit to verification. possible. Only
claim office. history can be
checked
through display.
9. Workflow of SBWP Go to Inbox and select Final Settlement
Reviewer, IFA and TAR available for Approval will Document will
Final approver. review. be given by get post as
Check details click on Final 1900
approving It can be
, decision box will
authority viewed through
open with 3 or 4 display option.
alternatives, select OK (GM).
and Press Enter as
done for TAR.
10. Temporary advance ZFI070 Fill Co Code, BA, Status with or Can be viewed
Report for status employee vendor code without any time after
and TAR no for details. details will be submission of
Select options for available TAR.
request and settlement
as per requirement.
e. Now “MIRO” may be immediately done after “MIGO” (“J1IEX” etc. procedure done after MIGO is
not required)
f. The “HSN Code (Control Code)” may be corrected at the time of “MIRO”. But this should be done
only in cases of “HSN Code” being correctly quoted by the Vendor in the Invoice and different
/incorrect “HSN Code” has been maintained in the Purchase Order.
New c omplia nces /c ha nges i n proc e dure re g. P urc ha s e O rde rs for “S e rvic e
s ” w .r. t. GS T
a. Now only one Material Group will be used in all Purchase Order for services which is “1000000-
GST Services”. Thus, other material groups have become dysfunctional.
b. The purchase order for services has been made activity based (which is automatically linked to
“HSN Code for Services”). Thus, you will have to choose correct type of the activity (services)
available from the drop down in the purchase order.