Measurment as per DPR Estimate 0

Excess/
Breadth Breadth
Sl. No. Description Unit No. Length (m) Depth (m) Quantity Description Unit No. Length (m) Depth (m) Quantity Saving
(m) (m)
Qty.

Clearing and grubbing at site which includes Clearing and grubbing at site which includes
cleaning and removal of vegetation growth from cleaning and removal of vegetation growth from
1.01 ha. 1 60.00 26.00 1560.00 ha. 4018.43 2458.43
structures, channel and protective works as per structures, channel and protective works as per
direction of Engineer as per Tech.Spec. Cl. 201 direction of Engineer as per Tech.Spec. Cl. 201
1 75.000 28.684 1.000 2151.300
1 75.000 24.895 1.000 1867.125
Dismantle existing cross drainage structure Dismantle existing cross drainage structure
Including disposal of resulting material and salvage Including disposal of resulting material and salvage
1.02 Cu.m. Cu.m.
reusable materials complete as per Tech.Spec.Cl. reusable materials complete as per Tech.Spec.Cl.
202 202
a) Brick / Stone/RCC structure 413.73 a) Brick / Stone/RCC structure 413.73 0.00
RCC Abutment 2 9.20 4.10 1.20 90.53 RCC Abutment 2 9.20 4.10 1.20 90.53
RCC Pier 5 9.20 4.10 1.20 226.32 RCC Pier 5 9.20 4.10 1.20 226.32
Returnwall 4 7.67 4.10 0.60 75.42 Returnwall 4 7.67 4.10 0.60 75.42
Returnwall (in between spans) 0 7.00 1.70 4.00 0.00 Returnwall (in between spans) 0 7.00 1.70 4.00 0.00
Parapet 2 29.80 0.60 0.60 21.46 Parapet 2 29.80 0.60 0.60 21.46

b) PCC in Substructure Cu.m. 83.49 b) PCC in Substructure Cu.m. 83.49 0.00


Abutment 2 9.50 4.40 0.15 12.54 Abutment 2 9.50 4.40 0.15 12.54
Pier 5 9.50 4.40 0.15 31.35 Pier 5 9.50 4.40 0.15 31.35
Returnwall 4 7.97 4.40 0.15 21.03 Returnwall 4 7.97 4.40 0.15 21.03
Arch 0 7.50 12.00 0.70 0.00 Arch 0 7.50 12.00 0.70 0.00
Parapet 2 25.80 0.60 0.60 18.58 Parapet 2 25.80 0.60 0.60 18.58

c) RCC in Superstructure Cu.m. 209.21 c) RCC in Superstructure Cu.m. 209.21 0.00


Girders 0 8.20 7.70 1.10 0.00 Girders 0 8.20 7.70 1.10 0.00
Slab 6 9.20 4.30 0.80 189.89 Slab 6 9.20 4.30 0.80 189.89
Approach slab 2 9.20 3.50 0.30 19.32 Approach slab 2 9.20 3.50 0.30 19.32
Railings 0 63.14 0.50 1.20 0.00 Railings 0 63.14 0.50 1.20 0.00

d) Stone Slabs in super structure Sq.m 0 7.50 2.00 0.00 d) Stone Slabs in super structure Sq.m 0 7.50 2.00 0.00
e) Steel I beams MT 0 7.00 0.04 0.50 0.00 e) Steel I beams MT 0 7.00 0.04 0.50 0.00
f) HP ( > 300 dia) m 0 10.00 0.00 f) HP ( > 300 dia) m 0 10.00 0.00
g) Wearing coat sqm 1 63.14 8.20 517.75 g) Wearing coat sqm 1 63.14 8.20 517.75

Earthwork in excavation of foundation for structures Earthwork in excavation of foundation for structures
1.03 in all types of soil including lead and lifts complete Cu.m. 2493.02 in all types of soil including lead and lifts complete Cu.m. 962.28 -1530.74
as per Tech. Spec. Cl. 304 as per Tech. Spec. Cl. 304
a) ordinary soil a) ordinary soil
Abutment AL 1 16.60 9.20 3.15 481.07 Abutment (A1) RL (188.794-186.644) 1 17.100 8.300 2.150 305.150
Abutment AR 1 16.60 9.20 4.65 710.15 Pier (P1) RL(187.126-184.976) 1 8.300 5.300 2.150 94.579
Pier - 1 1 13.10 6.30 3.15 259.97 Abutment (A2) RL (189.941-187.791) 1 17.100 8.300 2.150 305.150
Pier - 2 0 13.10 6.30 0.00 0.00 RetainingWall A1 side 1 15.000 5.800 1.650 143.550
Pier - 3 0 13.10 6.30 0.00 0.00 RetainingWall A2 side 1 15.000 4.600 1.650 113.850
Independent Returnwall on AL side 2 10.60 5.47 2.65 307.08
Independent Returnwall on AR side 2 10.60 5.65 4.15 497.32
Toe wall on side slopes AL 2 16.82 2.10 1.65 116.56
AR Side 2 17.44 2.10 1.65 120.87

b) in soft/weathered rock 0.00


AL 1 16.60 9.20 0.00 0.00
AR 1 16.60 9.20 0.00 0.00
Pier - 1 1 13.10 6.30 0.00 0.00
Pier - 2 0 13.10 6.30 0.00 0.00
Pier - 3 0 13.10 6.30 0.00 0.00
Independent Returnwall on AL side 2 10.60 5.47 0.00 0.00
Independent Returnwall on AR side 2 10.60 5.65 0.00 0.00

1
Excess/
Breadth Breadth
Sl. No. Description Unit No. Length (m) Depth (m) Quantity Description Unit No. Length (m) Depth (m) Quantity Saving
(m) (m)
Qty.

c) in Hard Rock 0.00


Abutment - A1 1 16.60 9.20 0.00 0.00
Abutment - A2 1 16.60 9.20 0.00 0.00
Pier - 1 1 13.10 6.30 0.00 0.00
Pier - 2 0 13.10 6.30 0.00 0.00
Pier - 3 0 13.10 6.30 0.00 0.00

Back filling behind abutments, wing walls, return Back filling behind abutments, wing walls, return
walls and foundation trenches with selected granular walls and foundation trenches with selected granular
1.04 material of approved quality complete with all leads Cu.m. 1565.02 material of approved quality complete with all leads Cu.m. 812.20 -752.82
as per Tech. Spec. Cl.710.1.4 of IRC:78and lifts as per Tech. Spec. Cl.710.1.4 of IRC:78and lifts
complete complete
Abutment - AL 1 16.60 0.60 1.20 11.95 Behind return wall (A1) 1 13.800 1.050 4.728 68.509
Abutment - AR 1 16.60 0.60 1.20 11.95 Behind return wall (A2) 1 13.800 1.050 3.465 50.208
Pier - 1 1 13.10 0.60 1.50 11.79 Behind abutment A1 1 16.000 3.189 6.378 325.431
Pier - 2 0 13.10 0.60 1.50 0.00 Behind abutment A2 1 16.000
(3.142x5.66 2.558 5.115 209.306
Pier - 3 0 13.10 0.60 1.50 0.00 A1 side corner slope 2 7x5.667)/
(3.142x3.77 1.889 95.304
Independent Returnwall on AL side 2 10.60 0.60 0.80 10.18 A1 side corner slope 2 4=25.226
25x3.7725)/ 1.258 63.443
Independent Returnwall on AR side 2 10.60 0.60 0.80 10.18 4=11.18
Abutment - AL 1 16.60 7.70 1.95 249.25
Abutment - AR 1 16.60 7.70 3.45 440.98
Pier - 1 1 13.10 5.30 1.65 114.56
Pier - 2 0 13.10 5.30 -1.50 0.00
Pier - 3 0 13.10 5.30 -1.50 0.00
Pier - 1 1 2.00 1.00 1.65 3.30
Pier - 2 0 2.00 5.30 -1.50 0.00
Pier - 3 0 2.00 5.30 -1.50 0.00
Independent Returnwall on AL side 2 10.60 4.87 1.85 190.84
Independent Returnwall on AR side 2 10.60 4.87 3.35 345.58
Toe wall AL side 2 16.82 0.60 0.30 6.06
2 16.82 1.85 1.20 74.68
AR side 2 17.44 0.60 0.30 6.28
2 17.44 1.85 1.20 77.44

Cement Concrete/Reinforced Cement Concrete in Cement Concrete/Reinforced Cement Concrete in


open foundation / leveling course including open foundation / leveling course including
1.05 centering and shuttering but excluding Cu.m. centering and shuttering but excluding Cu.m.
reinforcement all complete as per Tech. Spec.Cl. reinforcement all complete as per Tech. Spec.Cl.
1500, 1700 & 2100 1500, 1700 & 2100
a) M15 Grade - Levelling Course 105.72 a) M15 Grade - Levelling Course 78.89 -26.83
Abutment - AL 1 16.30 8.90 0.15 21.76 1 16.400 7.600 0.150 18.696
A1 Pile cap levelling course
Abutment - AR 1 16.30 8.90 0.15 21.76 -15 3.142x0.5x0.5=0.7855 0.150 -1.767
Pier - 1 1 12.80 6.00 0.15 11.52 1 7.600 4.600 0.150 5.244
P1 Pile cap levelling course
Pier - 2 0 12.80 6.00 0.15 0.00 -6 3.142x0.5x0.5=0.7855 0.150 -0.707
Pier - 3 0 12.80 6.00 0.15 0.00 1 16.400 7.600 0.150 18.696
A2 Pile cap levelling course
Independent Returnwall on A1 side 2 10.30 5.17 0.15 15.96 -15 3.142x0.5x0.5=0.7855 0.150 -1.767
Independent Returnwall on A2 side 2 10.30 5.35 0.15 16.54 Retaining Wall A1 Side 2 15.000 5.100 0.150 22.950
Toe wall 2 16.52 1.80 0.15 8.92 Retaining Wall A2 Side 2 15.000 3.900 0.150 17.550
2 17.14 1.80 0.15 9.26

c) M15 Grade - Below Approach Slab c) M15 Grade - Below Approach Slab
Below Approach slab 2 16.00 3.65 0.15 17.52 Below Approach slab 2 16.000 5.000 0.150 24.00 6.48

Cement concrete grade M20 in sub-structures and Cement concrete grade M20 in sub-structures and
1.06 59.51 59.51 0.00
Foundation as per Tech. Spec. Cl. 1700. Foundation as per Tech. Spec. Cl. 1700.
Toe wall Toe wall
AL AL
Base Slab 2 16.22 1.50 0.30 14.60 Base Slab 2 16.22 1.50 0.30 14.60
Stem wall 2 16.22 0.25 1.80 14.60 Stem wall 2 16.22 0.25 1.80 14.60

2
Excess/
Breadth Breadth
Sl. No. Description Unit No. Length (m) Depth (m) Quantity Description Unit No. Length (m) Depth (m) Quantity Saving
(m) (m)
Qty.
AR AR
Base Slab 2 16.84 1.50 0.30 15.16 Base Slab 2 16.84 1.50 0.30 15.16
Stem wall 2 16.84 0.25 1.80 15.16 Stem wall 2 16.84 0.25 1.80 15.16

Cement concrete grade M30 in sub-structures and Cement concrete grade M30 in sub-structures and
1.07 Cu.m. 33.60 Cu.m. 202.83 169.23
Foundation as per Tech. Spec. Cl. 1700. Foundation as per Tech. Spec. Cl. 1700.
Approach Slab Approach Slab 2 16.00 5.15 0.30 49.44
2 16.00 3.50 0.30 33.60 1 15.000 4.800 0.300 21.600
1 15.000 1/2x0.2x1.6=0.16 2.400
Raft
1 15.000 0.800 0.200 2.400
Retaining Wall (A1 Side)
1 15.000 1/2x2.4x0.2=0.24 3.600
1 15.000 1/2x6.5x0.5=1.625 24.375
Wall
1 15.000 0.300 6.500 29.250

1 15.000 3.600 0.300 16.200


1 15.000 1/2x0.1x1.1=0.0.055 0.825
Raft
1 15.000 0.600 0.100 0.900
Retaining Wall (A2 Side)
1 15.000 1/2x1.9x0.1=0.095 1.425
1 15.000 1/2x5.1x0.3=0.765 11.475
Wall
1 15.000 0.300 5.100 22.950
Pedestrian Kerb 2 53.300 0.500 0.300 15.990

Cement concrete grade M35 in Foundations as per Cement concrete grade M35 in Foundations as per
1.08 Cu.m. 595.81 Cu.m. 282.78 -313.03
Tech. Spec. Cl. 1700. Tech. Spec. Cl. 1700.
Independent Returnwall on AL side (Foundation) 2 10.00 4.87 0.80 77.86 A1 pile group 15 3.142x0.5x0.5=0.7855 10.000 117.825

Independent Returnwall on AR side (Foundation) 2 10.00 5.05 0.80 80.84 P1 Pile group 6 3.142x0.5x0.5=0.7855 10.000 47.130
Abutment base - AL 1 16.00 8.60 1.20 165.12 A2 pile group 15 3.142x0.5x0.5=0.7855 10.000 117.825
Abutment base - AR 1 16.00 8.6 1.20 165.12
Foundation 1 12.50 5.70 1.50 106.88
Foundation 0 12.50 5.70 1.50 0.00
Foundation 0 12.50 5.70 1.50 0.00

Cement concrete grade M35 in sub-structures as per Cement concrete grade M35 in sub-structures as per
1.09 Cu.m. 538.38 Cu.m. 1039.52 501.14
Tech. Spec. Cl. 1700. Tech. Spec. Cl. 1700.
Return wall Pile Cap Concrete
Independent Returnwall on AL side wall 2 10.00 0.50 6.81 68.10 A1 pile cap 1 16.100 7.300 1.500 176.295
2 10.00 0.20 6.81 13.62 P1 Pile cap 1 7.300 4.300 1.500 47.085
Independent Returnwall on AR side 2 10.00 0.50 7.12 71.21 A2 pile cap 1 16.100 7.300 1.500 176.295
2 10.00 0.20 7.12 14.24 0.00
Abutments A1 shaft 1 16.000 1.400 8.705 194.992
Abutment - AL (Shaft) 1 16.00 0.80 3.05 38.98 Hunch 2 1/2x0.45x0.45=0.10125 8.705 1.763
1 16.00 0.70 3.05 17.05 Return Wall 2 2.950 0.750 11.676 51.666
2 4.80 0.80 3.05 23.39 P1 shaft 1 4.9 1.1 9.573 51.598
Abutment Cap AL 1 16.00 0.80 0.60 7.68 1 3.142x0.55x0.55=.9504 9.573 9.098
Triangle portion 2 16.00 0.45 0.60 4.32 A2 shaft 1 16.000 1.400 7.56 169.299
1 16.00 1.70 0.90 24.48 Hunch 2 1/2x0.45x0.45=0.10125 7.56 1.530
Dirt wall 1 16.00 0.30 2.30 11.04 Return Wall 2 2.950 0.750 10.529 46.591
Projection 1 16.00 0.30 0.30 1.44 0.00
Triangle portion 1 16.00 0.30 0.30 0.72 A1 cap 1 16.000 1.400 0.800 17.920
Abutment - AR (Shaft) 1 16.00 0.80 3.36 42.96 A1 Return Wall 2 1.350 0.500 0.800 1.080
1 16.00 0.70 3.36 37.59 P1 cap 1 13.700 2.100 0.700 20.139
2 1/2x(3.15+0.55)x0.7=1. 2.100 5.439
2 4.80 0.80 3.36 25.77 295
Abutment Cap AR 1 16.00 0.80 0.60 7.68 1 6.300 2.100 0.700 9.261
Triangle portion 2 16.00 0.45 0.60 4.32 A2 cap 1 16.000 1.400 0.800 17.920
1 16.00 1.70 0.90 24.48 A2 Return Wall 2 1.350 0.500 0.800 1.080
Dirt wall 1 16.00 0.30 2.30 11.04 0.00
Projection 1 16.00 0.30 0.30 1.44 A1 Pedestal 5 0.800 0.800 0.363 1.162
Triangle portion 1 16.00 0.30 0.30 0.72 P1 pedestal 10 0.800 0.800 0.363 2.323

3
Excess/
Breadth Breadth
Sl. No. Description Unit No. Length (m) Depth (m) Quantity Description Unit No. Length (m) Depth (m) Quantity Saving
(m) (m)
Qty.
Piers A2 pedestal 5 0.800 0.800 0.363 1.162
Pier-1 A1 Dirt wall 1 16.000 0.300 2.071 9.941
1 10.50 1.00 3.83 40.19 Dirt Wall 1 16.000 0.600 0.300 2.880
Top cap 1 10.50 2.80 0.50 14.70 1 16.000 0.300 0.300 1.440
1 14.50 2.80 0.70 28.42 1 16.000 1/2x0.3x0.3=0.045 0.720
1 4.00 2.80 0.50 2.80 Return Wall 2 1.350 0.500 1.771 2.391
A2 Dirt wall
1 16.000 0.300 2.071 9.941
1 16.000 0.600 0.300 2.880
Dirt Wall
1 16.000 0.300 0.300 1.440
1 16.000 1/2x0.3x0.3=0.045 0.720
2 1.350 0.500 1.771 2.391
Return Wall 2 0.750 0.500 0.300 0.225
2 1.050 0.500 0.300 0.315

Cement concrete grade M40 in super structures as Cement concrete grade M40 in super structures as
1.10 Cu.m. 406.92 Cu.m. 321.49 -85.44
per Tech. Spec. Cl. 1700. per Tech. Spec. Cl. 1700.
For 10 girder
Pedestrals 2 2.48 0.625 1.400 4.340 43.4
28 0.80 0.80 0.25 4.48 1 11.440 1/2x(0.29+0.
0.625 0.25 1.788 17.875
G1 or G2 or G3 or G4 or G5 (for one 1 11.440 625)x0.15=0. 0.785 7.8507
Diaphgram 4 16.00 0.40 1.30 33.28 girder) 1 11.440 068625
1 0.29 3.318 33.176
RC Deck slab 2 16.00 20.00 0.20 128.00 2 1.800 0.695 2.502 25.02

b) in RC Girder Cross Girder 2 12.900 0.300 1.520 11.765


End Block 14 4.00 Area = 1.05 58.80
Tapering 14 2.40 Area = 0.92 31.00 Deck slab 2 20.000 16.000 0.285 182.400
Mid Section 14 13.60 Area = 0.80 151.37

Providing, cutting, bending and fixing in position of Providing, cutting, bending and fixing in position of
TMT bar reinforcement in reinforced cement TMT bar reinforcement in reinforced cement
1.11 T 171.98 T 282.33 110.35
concrete structures complete as per Tech. Spec. Cl concrete structures complete as per Tech. Spec. Cl
1600 1600
Toe wall 1 wt = 4.17 4.17 0.00
Abutment & Dirt wall 1 wt = 28.51 28.51 150 kg per cum 1906.13 282.33
Piers 1 wt = 8.61 8.61 0.00
Return Wall 1 wt = 15.05 15.05 0.00
RC Girder 1 wt = 36.17 36.17 0.00
RC slab 1 wt = 15.36 15.36 0.00
pedestals 1 wt = 0.54 0.54 0.00
Diapharam 1 wt = 3.99 3.99 0.00
Foundations 1 wt = 59.58 59.58 0.00
Filter media with stone crushed aggregates Filter media with stone crushed aggregates
1.12 abutments/return walls as per clause 2504.2.2 and Cu.m. 188.23 abutments/return walls as per clause 2504.2.2 and Cu.m. 318.03 129.80
Tech. Spec. Cl.710.1.4 of IRC:78 Tech. Spec. Cl.710.1.4 of IRC:78
(3.142x5.892x7.081)/
Behind Abutment - AL 1 16.00 0.60 4.60 44.11 A1 end (both corner) 2
4=32.772 0.150 9.832
(3.142x3.9975x4.804)/
Behind Abutment - AR 1 16.00 0.60 3.41 32.70 A2 end (both corner) (Below boulder) 2
4=15.085 0.150 4.526
Independent Returnwall on AL side 2 10.00 0.60 4.60 55.14 RetainingWall A1 side 2 15.000 0.6 6.500 117.000
Independent Returnwall on AR side 2 9.70 0.60 3.41 39.65 RetainingWall A2 side 2 15.000 0.6 5.100 91.800
Below pitching 4 55.46 0.15 16.64 Behind Abutment A1 1 19.300 0.6 4.728 54.750

4
Excess/
Breadth Breadth
Sl. No. Description Unit No. Length (m) Depth (m) Quantity Description Unit No. Length (m) Depth (m) Quantity Saving
(m) (m)
Qty.
Behind Abutment A2 1 19.300 0.6 3.465 40.125
Providing weep holes in abutments, returnwalls, Providing weep holes in abutments, returnwalls,
1.13 with 100mm dia AC pipes complete as per drawing no's 288.00 with 100mm dia AC pipes complete as per drawing no's 288.00 0.00
and Tech. Spec. Cl. 2706 and Tech. Spec. Cl. 2706

Abutment - AL 1 16.00 4.60 1.00 74.00 Abutment - AL 1 16.00 4.60 1.00 74.00
Abutment - AR 1 16.00 3.41 1.00 55.00 Abutment - AR 1 16.00 3.41 1.00 55.00
Independent Returnwall on AL side 2 10.00 4.60 1.00 92.00 Independent Returnwall on AL side 2 10.00 4.60 1.00 92.00
Independent Returnwall on AR side 2 9.70 3.41 1.00 67.00 Independent Returnwall on AR side 2 9.70 3.41 1.00 67.00

1.14 Providing and fixing Expansion joint


Bitumin Plug joint Rmtr 2 16.00 32.00 Rmtr 2 16.00 32.00 0.00
strip seal expansion joint Rmtr 3 16.00 48.00 Rmtr 3 16.00 48.00 0.00

Providing and fixing Tar paper bearing complete as Providing and fixing Tar paper bearing complete as
1.15 9.60 9.60 0.00
per drawing and IRC:SP:13-1973. per drawing and IRC:SP:13-1973.
in Approach slab Sq.m 2 16.00 0.30 9.60 in Approach slab Sq.m 2 16.00 0.30 9.60

Supply, fitting and fixing in position true to line and Supply, fitting and fixing in position true to line and
1.16 level POT-PTFE Bearings complete as per Tech. 28 level POT-PTFE Bearings complete as per Tech. 20 -8.00
Spec. Cl. 2000 Spec. Cl. 2000
Pot-PTFE Bearing - 200 MT No's 2 2 Pot-PTFE Bearing - 200 MT No's 20 1.000 1.000 1.000 20.000
Guided Pot-PTFE Bearing - 200 MT No's 24 24
Free Pot-PTFE Bearing - 200 MT No's 2 2

Fixed Pot Bearing - 250 MT No's 0 0


Guided Pot-PTFE Bearing - 250 MT No's 0 0
Free Pot-PTFE Bearing - 250 MT No's 0 0

Fixed Pot Bearing - 300 MT No's 0 0


Guided Pot-PTFE Bearing - 300 MT No's 0 0
Free Pot-PTFE Bearing - 300 MT No's 0 0

Fixed Pot Bearing - 350 MT No's 0 0


Guided Pot-PTFE Bearing - 350 MT No's 0 0
Free Pot-PTFE Bearing - 350 MT No's 0 0

Proving and fixing Drainage spouts complete as per Proving and fixing Drainage spouts complete as per 16 1.000 1.000 1.000 16.000
1.17 Each 18 18.00 Each -2.00
Tech. Spec. Cl. 2705 Tech. Spec. Cl. 2705

Providing and filling joint sealing compound as per Providing and filling joint sealing compound as per
drawings with coarse sand and 6 percent bitumen by drawings with coarse sand and 6 percent bitumen by
weight (0.083 kg/m bitumen) including cost and weight (0.083 kg/m bitumen) including cost and
1.18 Rmtr 3 16.00 48.00 Rmtr 3 16.00 48.00 0.00
conveyance of all materials, labour, fixing in conveyance of all materials, labour, fixing in
position, etc., complete as per drawing and Tech. position, etc., complete as per drawing and Tech.
Spec. Cl Spec. Cl

Providing and laying wearing course on top of deck Providing and laying wearing course on top of deck
1.19 complete as per Tech.Spec.Cl.515 & 2702 65mm Sq.m 1 47.00 11.00 517.00 complete as per Tech.Spec.Cl.515 & 2702 65mm Sq.m 1 47.00 11.00 517.000 0.00
Thick (40BC+ 25 Asphaltic) Thick (40BC+ 25 Asphaltic)

Construction of Crash Barrier M40 grade incl. cost Construction of Crash Barrier M40 grade incl. cost
1.20 of all materials, labour, lead, lifts, loading, Rmtr 98.00 of all materials, labour, lead, lifts, loading, Rmtr 204.600 106.60
unloading etc., complete unloading etc., complete
Inner 0 49.00 0.00 Inner,Outer 2 53.300 1.000 1.000 106.60
Outer 2 49.00 98.00 0.00

1.21 PVC Utility pipes (150 dia) Rmtr 2 49.00 98.00 PVC Utility pipes (150 dia) Rmtr 2 49.00 98.00

5
Excess/
Breadth Breadth
Sl. No. Description Unit No. Length (m) Depth (m) Quantity Description Unit No. Length (m) Depth (m) Quantity Saving
(m) (m)
Qty.
Providing and applying 2 coats of Enamel paint to Providing and applying 2 coats of Enamel paint to
1.22 plastered concrete surface complete as per Sq.m 1 98.00 0.29 28.32 plastered concrete surface complete as per Sq.m 1 98.00 0.29 28.32 0.00
Tech.Spec Cl. 800 for RC Crash barrier Tech.Spec Cl. 800 for RC Crash barrier

Painting details of Structure and span arrangements Painting details of Structure and span arrangements
1.23 No's 4 4.00 No's 4 4.00 0.00
as Tech.Spec.Cl. 800 as Tech.Spec.Cl. 800

Provide and lay stone pitching as per Tech. Spec. Provide and lay stone pitching as per Tech. Spec.
1.24 Cu.m. 66.55 Cu.m. 66.55 0.00
Cl. 2504. Cl. 2504.
for quandrantal pitching 4 Area= 55.46 0.30 66.55 for quandrantal pitching 4 Area= 55.46 0.30 66.55

1.25 metallic crash barrier m15 garde Cum 40.00 metallic crash barrier m15 garde Cum 40.00 0.00

2 10.00 20.00 2 10.00 20.00


2 10.00 20.00 2 10.00 20.00
1.26 Railing Rmtr Railing Rmtr
2 49.00 98.00 2 49.00 98.00 0.00

Painting of concrete hand rails/ parapets/ crash Painting of concrete hand rails/ parapets/ crash
barriers with two coats of enamel paint as per barriers with two coats of enamel paint as per
1.27 Sq.m 274.40 Sq.m 274.40 0.00
Technical Specification and the directions of the Technical Specification and the directions of the
Engineer Engineer

1 98.00 2.80 274.40 1 98.00 2.80 274.40

Paininting of sub structures & super structures Paininting of sub structures & super structures
1.28 with two coats of enamel paint as per Technical Sq.m 778.13 with two coats of enamel paint as per Technical Sq.m 778.13 0.00
Specification and the directions of the Engineer Specification and the directions of the Engineer

sub structures 1 371.21 371.21 sub structures 1 371.21 371.21


Super structures 1 406.92 406.92 Super structures 1 406.92 406.92

6
UPGRADATION OF GADCHIROLI-ASTHI ROAD TO TWO LANE WITH PAVED SHOULDERS/FOUR LANE
Project: IN THE STATE OF MAHARASTRA ON ENGINEERING, PROCURMENT & CONSTRUCTION (EPC) BASIS C
Client: CH. 151+020
National Highway ( P.W.D. ) Maharastra
Independent Consultant:LNM Infra Projects Pvt. Ltd. Bhopal
EPC Contractor: A.G. Construction Pvt. Ltd.
Structure Name: Major Bridge 144+875 (Proposed)
Detailed Estimate

SOR
Component Item Particular
No.
Clearing and grubbing road land by mechanical meansincluding uprooting rank vegetation, grass, b
6.01 removal of stumpsof trees cut earlier, disposal of unusable materials andstacking of usable materia
as per Technical
Gadchiroli side Specifications Clause201 From 127+120
Clearing and Grubbing Asthi side
Earthwork in excavation for foundation of structures inall types of soil, including setting out, constr
6.02 stumps, and otherdeleterious matter, dressing of sides and bottom andbackfilling with approved m
i) drawings and
All types of TechnicalSpecifications
soils including marshy soilClause 304 rock
and ordinary
Abutment (A1) RL (188.794-186.644)
Pier (P1) RL(187.126-184.976)
Abutment (A2) RL (189.941-187.791)
Excavation
RetainingWall A1 side
RetainingWall A2 side

Back filling behind abutments, wing walls, retainingwalls, return walls and filling in foundation Tre
6.03
SpecificationsClause 305, 309 and Clause 710.1.4 of IRC: 78
Behind return wall (A1)
Behind return wall (A2)
Behind abutment A1
Backfilling
Behind abutment A2
A1 side corner slope
A1 side corner slope
Providing and laying filter media behind abutments, boxstructures, wing walls & return walls with
6.04 with smaller sizetowards the soil and bigger size towards the wallcomplete with all leads and lifts a
Clauses
A1 end 305,
(both309, 2504, Section2200 and Clause 710.1.4 of IRC:78
corner)
A2 end (both corner) (Below boulder)
RetainingWall A1 side
Filter Media
RetainingWall A2 side
Behind Abutment A1
Behind Abutment A2

6.05 Providing and laying Plain Cement Concrete /Reinforced Cement Concrete in base slabs, levelling c
excluding reinforcement complete as per drawings and Technical Specifications Sections1500, 1700
Pile Cap: Levelling Course
PCC
A1 Grade Pile cap levelling course RL (188.294-186.794)
M15
PCC
P1 Grade Pile cap levelling course RL (186.626-185.126)
M15
PCC
A2 Grade Pile cap levelling course RL (189.441-187.791)
A2 Grade Pile cap levelling course RL (189.441-187.791)
M15
PCC
Approach slab Grade A1 Side levelling course
M15
PCC
Approach slab Grade A2 Side levelling course
M15
PCC
Retaining Wall Grade A1 Side
M15
PCC
Retaining Wall Grade A2 Side
M15

complete as perdrawings and Technical Specifications Sections 1500,1700 and 2200.


6.06
a) M-35 grade - pile & substructure
Pile : concrete
RCC
A1 Grade A1 pile group RL (171.844-186.844)
M-35
RCC
P1 Grade P1 Pile group RL (170.176-185.176)
M-35
RCC
A2 Grade A2 pile group RL (172.991-187.991)
M-35

Pile Cap : concrete


RCC
A1 Grade A1 pile cap 0.000
M-35
RCC
P1 Grade P1 Pile cap 0.000
M-35
RCC
A2 Grade A2 pile cap 0.000
M-35

Shaft : concrete
RCC A1 shaft
A1 Grade Hunch RL (196.999-188.294)
M-35 Return Wall
RCC
P1 Grade P1 shaft RL (196.199-186.626)
M-35
RCC A2 shaft
A2 Grade Hunch RL (196.999-189.441)
M-35 Return Wall
Cap & Return Wall : concrete
RCC A1 cap
A1 Grade RL (189.851-190.651)
M-35 A1 Return Wall
RCC
P1 Grade P1 cap RL (189.186-190.586)
M-35
RCC A2 cap
A2 Grade RL (189.735-190.535)
M-35 A2 Return Wall

Pedestal : concrete
RCC
A1 Grade A1 Pedestal RL (190.651-191.014)
M-35
RCC
P1 Grade P1 pedestal RL (190.586-190.949)
M-35
RCC
A2 Grade A2 pedestal RL (190.535-190.898)
M-35

Dirt Wall & Return Wall : concrete

Dirt Wall
RCC RL (190.651-193.022)
A1 Grade
M-35
Return Wall

Dirt Wall
RCC RL (190.535-192.906)
A2 Grade
M-35
Return Wall

Providing and laying Reinforced Cement Concrete insuperstructure excluding reinforcement comple
6.07 Sections1500,1700 and 2300
RCC Grade M30

RCC Raft
Retaining Wall Grade A1 side (Gadchiroli side)
M30
Wall
RCC Raft
Retaining Wall Grade A1 side (Gadchiroli side)
M30
Wall

RCC
Pedestrian Kerb Grade Whole
M30

Providing and laying Reinforced Cement Concrete M40in superstructure excluding reinforcement co
6.08
Specifications Sections1500,1700 and 2300a)
a) in RC Slab, Cross Girdre & Crash Bareer M40
RC Girder : concrete
Support Section

Mid section

G1 or G2 or G3
RCC
or G4 or G5 Grade
(for one M-40
girder)
Variable section

Cross Girder : concrete


RCC
Cross Girder Grade All
M-40

Deck slab : concrete


RCC
Deck slab Grade All slab
M-40

6.10 Supplying, fitting and placing T.M.T. bar reinforcementcomplete as per drawings and Technical Spe
Steel Whole (As per BBS - attached)

6.12 Providing 25mm thick mastic asphalt complete as perTechnical Specification 2700
Wearing Coat Bituminious wearing coat (Mastic Asphalt) Top lab

6.13 Providing and fixing 150mm dia GI pipe in drainage spouts as per drawings and Technical Specifica
Drainage spout All Slab
6.15 Supplying and fixing of bearings complete as perdrawings, Technical Specifications clause 2000 and
a) Fixed Pot Bearing - 200 MT
Bearing Whole bridge

6.16 Exoansion joint


b) Strip seal jt. in PSC Girder catering to maximumhorizontal movement upto 70 mm
Expansion Joint Whole Bridge

Providing and constructing Reinforced Cement Concrete Crash Barrier in M-40 grade Excluding rein
16.17
Technical SpecificationsSections 1500, 1600, 1700, 2200 and Clause809
Concrete crash bareer : Length
RCC
Crash Bareer Grade Whole
M-40

6.18 Reinforced Cement Concrete M - 30 grade in approachslabs including reinforcement and form work
Specifications Sections1500, 1600, 1700 and 2100 and Clause 2704.
Approach slab A1 end
Approach slab A2 end

6.19 Providing and laying stone boulder pitching on slopesand for floor aprons complete as per drawing
Boulder Packing A1 end (both corner)
Boulder Packing A2 end (both corner) (Below boulder)

Providing weep holes with 100 mm dia A. C. pipes inabutments, wing walls, retaining walls, return
6.20 TechnicalSpecifications Clause 2706
A1 end
Retaining Wall
A2 end

6.21 Painting with synthetic enamel of Bridge no. and spanarrangement as per drawing, IRC:7-1971 and
Whole Bridge

6.22 Providing and painting of flood gauge on substructure infull height and 500 mm width as per IRC: 6
Flood Gauge All

6.23 Providing, laying, fixing PVC pipe of approved quality infootpath kerb & crash barrier as per drawin
b) 150mm dia
Crash Bareer

6.24 Painting of concrete hand rails/ parapets/ crash barrierswith two coats of enamel paint as per Tech
Engineer
Whole Bridge Hand rail

6.26 Providing and fixing Tar Paper Bearing complete as perdrawing and IRC:SP:13-2004.

6.27 Providing and filling joint sealing compound inapproach slab complete as per Technical Specificatio
Both Side

Provide and maintain Temporary diversion at sites of Bridge reconstruction locations including stru
6.42
completion as perTechnical Specifications Clause 112

1 Providing steel liner10mm thick for curbs and 6mm thick for steining of wells including fabr
drawing as per section 1200 & 1900.
Steel Liner All Pile

2 Pile load test on single vertical pile in accordance with IS:2911 (Part-V)
Abutment
Pier

Taking exploratory boring 100 mm dia at the location of pier and abutments or for all high
3 strata as per IRC-78-1983 and section 2400 of specification.
a) Upto 1m below bed level
b) Beyond 1m depth to 5m
c) Beyond 5m depth

4 Testing of span of bridge for deflection due to live load with platforms for loading arrangm
unloading etc. complete as per approved drawing.
ED SHOULDERS/FOUR LANE CONFIGRATION ( PACKAGED NO- NH/IAHE/02)
ONSTRUCTION (EPC) BASIS CONTRACT DESIGN CHAINAGE - CH. 123+100 TO

Volume/
Area/
Amount
No Length Breath Height Nos/ Unit Remarks Rate
(Rs.)
tonne/
metre
ting rank vegetation, grass, bushes,shrubs and trees girth upto 300mm,
ndstacking of usable material to be used or auctioned, withall leads and lifts FRL
1 75.000 28.684 1.000 0.215 L & B are 193.022
hac
1 75.000 24.895 1.000 0.187 in metre 192.957
including setting out, construction of Total 0.402
shoring and hac
bracing, removal of 68194.070 27403.276 192.906
dbackfilling with approved material with all leads andlifts complete as per
188.294
1 17.100 8.300 2.150 305.150 Cum 186.626
1 8.300 5.300 2.150 94.579 Cum 189.441
1 17.100 8.300 2.150 305.150 Cum
1 15.000 5.800 1.650 143.550 Cum
1 15.000 4.600 1.650 113.850 Cum
Total 962.278 Cum
and filling in foundation Trenches complete as per drawing and Technical
0.000
1 13.800 1.050 4.728 68.509 cum 0.000
1 13.800 1.050 3.465 50.208 cum
1 16.000 3.189 6.378 325.431 cum
1 16.000 2.558 5.115 209.306 cum
(3.142x5.667x5.
2
667)/4=25.226 1.889 95.304
cum 0.000
2 (3.142x3.7725x3 1.258 63.443 cum 0.000
.7725)/4=11.18
Total 812.201 cum
ng walls & return walls with well packed material to the specified thickness 678.220 550850.732
plete with all leads and lifts as per drawings andTechnical Specifications 0.000
(3.142x5.892x7.
081)/4=32.772 0.150 9.832 Cum
2 0.000
(3.142x3.9975x4
.804)/4=15.085 0.150 4.526 Cum
2 0.000
2 15.000 0.6 6.500 117.000 Cum
2 15.000 0.6 5.100 91.800 Cum
1 19.300 0.6 4.728 54.750 Cum
1 19.300 0.6 3.465 40.125 Cum
Total 318.032 Cum 0.000
ete in base slabs, levelling course, filling annular space around footing
0.000
fications Sections1500, 1700 and 2100
0.000
1 16.400 7.600 0.150 18.696 0.000 188.294
Cum
-153.142x0.5x0.5=0.78550.150 -1.767 0.000 186.626
1 7.600 4.600 0.150 5.244 0.000 189.441
Cum
-6 3.142x0.5x0.5=0.78550.150 -0.707 0.000
1 16.400 7.600 0.150 18.696 0.000 186.794
Cum
Cum
-153.142x0.5x0.5=0.78550.150 -1.767 0.000 185.126

1 16.000 5.000 0.150 12.000 Cum 0.000 187.941

1 16.000 5.000 0.150 12.000 Cum 0.000

Taking
2 15.000 5.100 0.150 22.950 Cum 5.5m 0.000
height
Taking
2 15.000 3.900 0.150 17.550 Cum 4m 0.000
height
Total 102.894 Cum 5218.200 536923.036
700 and 2200.
0.000
0.000
0.000 186.794

15 3.142x0.5x0.5=0.7855
15.000 176.738 Cum 0.000

6 3.142x0.5x0.5=0.7855
15.000 70.695 Cum 0.000

15 3.142x0.5x0.5=0.7855
15.000 176.738 Cum 0.000

Total 424.170 Cum 7542.000 3199090.140


0.000

1 16.100 7.300 1.500 176.295 Cum 0.000

1 7.300 4.300 1.500 47.085 Cum 0.000

1 16.100 7.300 1.500 176.295 Cum 0.000

Total 399.675 Cum 7542.000 3014348.850


0.000
1 16.000 1.400 8.705 194.992 0.000 188.294
1/2x0.45x0.45=0
2 8.705 1.763 Cum 0.000 186.626
.10125
2 2.950 0.750 11.676 51.666
1 4.9 1.1 9.573 51.598 0.000
Cum
13.142x0.55x0.55=.9504
9.573 9.098 0.000 190.651
1 16.000 1.400 7.56 169.299 0.000 190.586
1/2x0.45x0.45=0
2
.10125 7.56 1.530 Cum 0.000 190.535
2 2.950 0.750 10.529 46.591 0.000
Total 526.538 Cum 7542.000 3971151.343
0.000
1 16.000 1.400 0.800 17.920 0.000 189.851
Cum
2 1.350 0.500 0.800 1.080 0.000 189.186
1 13.700 2.100 0.700 20.139 0.000 189.735
1/2x(3.15+0.55)x
2 2.100 5.439 Cum
0.7=1.295
1 6.300 2.100 0.700 9.261 0.000
1 16.000 1.400 0.800 17.920 0.000
Cum
2 1.350 0.500 0.800 1.080 0.000
Total 72.839 Cum 7542.000 549351.738
0.000

5 0.800 0.800 0.363 1.162 Cum 0.000 190.651

Taking
10 0.800 0.800 0.363 2.323 Cum avg. 0.000 190.586
height

5 0.800 0.800 0.363 1.162 Cum 0.000 190.535

Total 4.646 Cum 7542.000 35043.149


0.000
1 16.000 0.300 2.071 9.941 Cum 0.000
1 16.000 0.600 0.300 2.880 Cum 0.000
1 16.000 0.300 0.300 1.440 Cum 0.000
1 16.000 1/2x0.3x0.3=0. 0.720 Cum 0.000
045
2 1.350 0.500 1.771 2.391 Cum 0.000
2 0.750 0.500 0.300 0.225 Cum 0.000
2 1.050 0.500 0.300 0.315 Cum 0.000
Total 17.912 Cum 0.000
1 16.000 0.300 2.071 9.941 Cum 0.000
1 16.000 0.600 0.300 2.880 Cum 0.000
1 16.000 0.300 0.300 1.440 Cum 0.000
1/2x0.3x0.3=0.
1 16.000 0.720 Cum 0.000
045
2 1.350 0.500 1.771 2.391 Cum 0.000
2 0.750 0.500 0.300 0.225 Cum 0.000
2 1.050 0.500 0.300 0.315 Cum 0.000
Total 17.912 Cum 0.000
Total 35.823 Cum 7542.000 270179.329
luding reinforcement complete as perdrawings and Technical Specifications 0.000

1 15.000 4.800 0.300 21.600


1/2x0.2x1.6=0.
1 15.000 2.400
16
1 15.000 0.800 0.200 2.400
1 15.000 1/2x2.4x0.2=0. 3.600 Cum 0.765
24
1 15.000 1/2x6.5x0.5=1. 24.375 0.7975
625
1 15.000 0.300 6.500 29.250
Cum

Total 83.625
1 15.000 3.600 0.300 16.200
1/2x0.1x1.1=0.
1 15.000 0.825 0.095
0.055
1 15.000 0.600 0.100 0.900
1/2x1.9x0.1=0.
1 15.000 1.425 Cum
095
1/2x5.1x0.3=0.
1 15.000 11.475 0.765
765
1 15.000 0.300 5.100 22.950
Total 53.775

2 53.300 0.500 0.300 15.990 Cum 0.825

Total (30 153.390 Cum 0.8250


Girder)
e excluding reinforcement complete asper drawings and Technical
0.000

0.000
2 2.48 0.625 1.400 4.340 Cum 0.000
1 11.440 0.625 0.25
1/2x(0.29+0.62 1.788 Cum 0.000
1 11.440 5)x0.15=0.0686 0.785 Cum 0.000
1 11.440 1 25 0.29 3.318 Cum 0.000

Taking
avg. area
2 1.800 0.695 2.502 Cum of section 0.000
at mid &
support
Total (single
12.732 Cum 0.000
girder)
Total (10
127.322 Cum 11336.000 1443318.791
Girder)
0.000

2 12.900 0.300 1.520 11.765 cum 0.000

Total 11.765 Cum 11336.000 133365.773


0.000

2 20.000 16.000 0.285 182.400 cum 0.000

Total 182.400 Cum 11336.000 2067686.400


drawings and Technical SpecificationsSection 1600 0.000
290.785 MT 0.000
Total 290.785 MT 76010.440 22102715.920
ation 2700 0.000
1 53.300 11.000 1.000 586.300 Sqm 0.000
Total 586.300 Sqm 650.100 381153.630
wings and Technical SpecificationsClause 2705 0.000
16 1.000 1.000 1.000 16.000 Nos 0.000
Total 16.000 Nos 1167.380 18678.080
pecifications clause 2000 andIRC:83 (Part III) - 2002 0.000
0.000
20 1.000 1.000 1.000 20.000 Nos 0.000
Total 20.000 Nos 60580.000 1211600.000
0.000
pto 70 mm 0.000
3 16.000 1.000 1.000 48.000 Rmtr 0.000
Total 48.000 Rmtr 18573.020 891504.960
n M-40 grade Excluding reinforcementcomplete as per drawings and
0.000
0.000

2 80.000 1.000 1.000 160.000 m 0.000

Total 160.000 m 4674.160 747865.600


einforcement and form work completeas per drawings and Technical 0.000
1 5.000 16.000 0.350 28.000 cum 0.000
1 5.000 16.000 0.350 28.000 cum 0.000
Total 56.000 Cum 11165.700 625279.200
ons complete as per drawings andTechnical Specifications Section 2500 0.000
(3.142x6.342x7.
622)/4=37.97 0.300 22.782 Cum
2 0.000
(3.142x4.447x5.
2
345)/4=18.671 0.300 11.203 Cum 0.000
Total 33.985 Cum 2364.770 80365.763
walls, retaining walls, return wallsetc. complete as per drawings and
0.000
2 90.000 1.000 1.000 180.000 Nos 0.000
2 60.000 1.000 1.000 120.000 Nos 0.000
Total 300.000 Nos 285.480 85644.000
per drawing, IRC:7-1971 and directionsof the Engineer 0.000
2 1.000 1.000 1.000 2.000 Nos 0.000
Total 2.000 Nos 33.480 66.960
d 500 mm width as per IRC: 67-2001 andthe directions of the Engineer. 0.000
0.000 m 0.000
Total 0.000 m 260.720 0.000
& crash barrier as per drawing anddirection of the Engineer all complete 0.000
0.000
17.000 0.500 1.000 1.000 8.500 0.000
Total 8.500 m 131.120 1114.520
s of enamel paint as per TechnicalSpecification and the directions of the
0.000
Taking
2 160.000 1.000 0.785 251.200 Sqm Lumsum 0.000
Total 251.200 Sqm 77.350 19430.320
C:SP:13-2004. 0.000
20 0.500 0.500 1.000 5.000 Sqm 0.000
Total 5.000 Sqm 69.280 346.400
as per Technical Specificationsand drawing. 0.000
1.000 1.000
Running
2 16.000 32.000 0.000
metre
Total 32.000 Running 106.310 3401.920
metre
ction locations including structures, if needed and dismantling after
0.000
1 150.000 0.250 1.000 600.000 metre 0.000
Total 600.000 metre 17090.240 10254144.000
Rs.= 52222026.276
ning of wells including fabricating and setting out as per detailed
36 16.000 3.142 0.006 85.241 tonne
Total 85.241 tonne
art-V) 625.000
4 250x2.5=625 2500.000 tonne
2 280x2.5=700 1400.000 tonne
Total 3900.000 tonne 700.000
abutments or for all high embankment in approaches in all types of
3 1 1 1 3 m
3 4 1 1 12 m
3 10 1 1 30 m
Total 45.000 m
orms for loading arrangments apparatus for measurement including
77.000 tonne
Total 77.000 tonne
Pier Cap Top Ground Level Pile Cap Top
190.651 188.794 188.294
190.586 187.126 186.626
190.535 189.941 189.441

186.644 2.150 1.650


184.976 2.150
187.791 2.150

186.794
185.126
187.941

186.644
184.976

187.791

186.794

185.126

0.000

189.851 1.557
189.186 2.560

189.851
189.186
189.735
190.651
190.586
190.535

191.014

190.949

190.898

2.371

0.095
0.055
UPGRADATION OF GADCHIROLI-ASTHI ROAD TO TWO LANE WITH PAVED SHOULDERS/FOUR LANE CONFIGRATION ( PAC
MAHARASTRA ON ENGINEERING, PROCURMENT & CONSTRUCTION (EPC) BASIS CONTRACT DESIGN CHAINAG

Change of Scope Abstruct


Minor Bridge 127+120

Quantity
Quantity as SSR rate
Sl. No. Description Unit as per Excess Qty.
per DPR 2020-21
Revision

Clearing and grubbing at site which


includes cleaning and removal of
vegetation growth from structures,
1.01 Sq.m 1560.00 4018.43 2458.43 2.09
channel and protective works as per
direction of Engineer as per
Tech.Spec. Cl. 201

Dismantle existing cross drainage


structure Including disposal of
1.02 resulting material and salvage Cu.m.
reusable materials complete as per
Tech.Spec.Cl. 202

a) Brick / Stone/RCC structure 413.73 413.73 0.00


b) PCC in Substructure 83.49 83.49 0.00
c) RCC in Superstructure 209.21 209.21 0.00
g) Wearing coat 517.75 517.75 0.00

Earthwork in excavation of
foundation for structures in all types
1.03 Cu.m.
of soil including lead and lifts
complete as per Tech. Spec. Cl. 304

a) ordinary soil 2493.02 962.28 (1530.74) 12.03


b) in soft/weathered rock 0.00 12.08
c) in Hard Rock

Back filling behind abutments, wing


walls, return walls and foundation
trenches with selected granular
1.04 material of approved quality complete Cu.m. 1565.02 812.20 -752.82 12.70
with all leads as per Tech. Spec.
Cl.710.1.4 of IRC:78and lifts
complete
Cement Concrete/Reinforced Cement
Concrete in open foundation /
leveling course including centering
1.05 Cu.m. 0.00
and shuttering but excluding
reinforcement all complete as per
Tech. Spec.Cl. 1500, 1700 & 2100

a) M15 Grade - Levelling Course 105.72 78.89 (26.83) 17.38


Below Approach slab 17.52 24.00 6.48 17.38
0.00
Cement concrete grade M20 in sub-
1.06 structures and Foundation as per 59.51 59.51 0.00 17.39
Tech. Spec. Cl. 1700.
Cement concrete grade M30 in sub-
1.07 structures and Foundation as per Cu.m. 33.60 202.83 169.23 17.45
Tech. Spec. Cl. 1700.
Approach Slab 0.00 17.45
Cement concrete grade M35 in
1.08 Foundations as per Tech. Spec. Cl. Cu.m. 595.81 282.78 -313.03 17.46
1700.
Cement concrete grade M35 in sub-
1.09 structures as per Tech. Spec. Cl. Cu.m. 538.38 1039.52 501.14 17.46
1700. Hight upto 5 Mtr
Hight above 5 mtr Cu.m. 0.00 17.46
Cement concrete grade M40 in super
1.10 structures as per Tech. Spec. Cl. Cu.m. 406.92 321.49 (85.44) 14.90
1700.

Providing, cutting, bending and fixing


in position of TMT bar reinforcement
1.11 in reinforced cement concrete T 171.98 282.33 110.35 17.65
structures complete as per Tech. Spec.
Cl 1600

Filter media with stone crushed


aggregates abutments/return walls as
1.12 Cu.m. 188.23 318.03 129.80 12.72
per clause 2504.2.2 and Tech. Spec.
Cl.710.1.4 of IRC:78

Providing weep holes in abutments,


returnwalls, with 100mm dia AC
1.13 no's 288.00 288.00 0.00 17.37
pipes complete as per drawing and
Tech. Spec. Cl. 2706

1.14 Providing and fixing Expansion joint


Bitumin Plug joint Rmtr 32.00 32.00 0.00 14.33
strip expansion joint Rmtr 48.00 48.00 0.00 14.32
Providing and fixing Tar paper
1.15 bearing complete as per drawing and 9.60 9.60 0.00 13.02
IRC:SP:13-1973.
in RC Slab Sq.m
Supply, fitting and fixing in position
true to line and level POT-PTFE
1.16 28.00 20.00 (8.00)
Bearings complete as per Tech. Spec.
Cl. 2000

Proving and fixing Drainage spouts


1.17 Each 18.00 16.00 (2.00) 19.41
complete as per Tech. Spec. Cl. 2705

Providing and filling joint sealing


compound as per drawings with
coarse sand and 6 percent bitumen by
weight (0.083 kg/m bitumen)
1.18 Rmtr 48.00 48.00 0.00 14.64
including cost and conveyance of all
materials, labour, fixing in position,
etc., complete as per drawing and
Tech. Spec. Cl

0.00

Providing and laying wearing course


on top of deck complete as per
1.19 Sq.m 517.00 517.00 0.00 14.84
Tech.Spec.Cl.515 & 2702 65mm
Thick (40BC+ 25 Asphaltic)

0.00
Construction of Crash Barrier M40
grade incl. cost of all materials,
1.20 Rmtr 98.00 204.60 106.60
labour, lead, lifts, loading, unloading
etc., complete
1.21 PVC Utility pipes (150 dia) Rmtr 98.00 98.00 0.00 17.37
0.00

Providing and applying 2 coats of


Enamel paint to plastered concrete
1.22 Sq.m 28.32 28.32 0.00 35.07
surface complete as per Tech.Spec Cl.
800 for RC Crash barrier

Painting details of Structure and span


1.23 No's 4.00 4.00 0.00
arrangements as Tech.Spec.Cl. 800

Provide and lay stone pitching as per


1.24 Cu.m. 66.55 66.55 0.00
Tech. Spec. Cl. 2504.
for quandrantal pitching

1.25 metallic crash barrier m15 garde Cum 40.00 40.00 0.00 17.38
6.56 RC Railings rmtr 0.00

1.26 Railing Rmtr 98.00 98.00 0.00


0.00
0.00

Painting of concrete hand rails/


parapets/ crash barriers with two
1.27 coats of enamel paint as per Sq.m 274.40 274.40 0.00 35.07
Technical Specification and the
directions of the Engineer

Paininting of sub structures &


super structures with two coats of
1.28 enamel paint as per Technical Sq.m 778.13 778.13 0.00 35.07
Specification and the directions of
the Engineer
Total Excess amou
R LANE CONFIGRATION ( PACKAGED NO- NH/IAHE/02) IN THE STATE OF
ONTRACT DESIGN CHAINAGE - CH. 123+100 TO CH. 151+020

truct
0

Derived Rate,
with
Rate Area Amount Remarks
Weightage of
30% (Rs)

11 14.30 35156

86.00 111.80 -171137


515.00 669.50 0
0

744.00 967.20 -728126


0

6751.00 8776.30 -235439


6751.00 8776.30 56871
0

7443.00 9675.90 0

8111.00 10544.30 1784412

8111.00 10544.30 0

8604.00 11185.20 -3501333

8604.00 11185.20 5605399

9249.30 12024.09 0

10779.00 14012.70 -1197211

68640.00 89232.00 9847116

1126.00 1463.80 190001

439.00 570.70 0

0.00 0
863.00 1121.90 0
3846.00 4999.80 0

86.00 111.80 0
0.00 0

60580.00 78754.00 (630032.00)

3118.00 4053.40 -8107

41.00 53.30 0

Rs.385 rate
802.00 1042.60 0 on 12 mm
thick

0.00 0

4674.16 6076.41 647746

439.00 570.70 0
0.00 0

80.00 104.00 0

0.00 0

33.48 43.52 0

0.00 0
2364.77 3074.20 0
0.00 0
0.00 0
6751.00 8776.30 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0

80.00 104.00 0

80.00 104.00 0

Total Excess amount 11695316.00


Measurment as per DPR Estimate Measurment as per COS Estimate
Excess/
Breadth Breadth Ref. Drawing No.
Sl. No. Description Unit No. Length (m) Depth (m) Quantity Description RL Unit No. Length (m) Depth (m) Quantity Saving
(m) (m)
Qty.

Clearing and grubbing at site which includes Clearing and grubbing at site which includes
cleaning and removal of vegetation growth from cleaning and removal of vegetation growth from
1.01 ha. 1 60.00 26.00 1560.00 ha. 3750.53 2190.53 PKE/15/MNBR/01
structures, channel and protective works as per structures, channel and protective works as per
direction of Engineer as per Tech.Spec. Cl. 201 direction of Engineer as per Tech.Spec. Cl. 201

Sqm P1 to A1 side 1 70.000 28.684 2007.880


Sqm P1 to A2 side 1 70.000 24.895 1742.650
Dismantle existing cross drainage structure Dismantle existing cross drainage structure
Including disposal of resulting material and salvage Including disposal of resulting material and salvage
1.02 Cu.m. Cu.m.
reusable materials complete as per Tech.Spec.Cl. reusable materials complete as per Tech.Spec.Cl.
202 202
a) Brick / Stone/RCC structure 413.73 a) Brick / Stone/RCC structure 413.73 0.00
RCC Abutment 2 9.20 4.10 1.20 90.53 RCC Abutment 2 9.20 4.10 1.20 90.53
RCC Pier 5 9.20 4.10 1.20 226.32 RCC Pier 5 9.20 4.10 1.20 226.32
Returnwall 4 7.67 4.10 0.60 75.42 Returnwall 4 7.67 4.10 0.60 75.42
Returnwall (in between spans) 0 7.00 1.70 4.00 0.00 Returnwall (in between spans) 0 7.00 1.70 4.00 0.00
Parapet 2 29.80 0.60 0.60 21.46 Parapet 2 29.80 0.60 0.60 21.46

b) PCC in Substructure Cu.m. 83.49 b) PCC in Substructure Cu.m. 83.49 0.00


Abutment 2 9.50 4.40 0.15 12.54 Abutment 2 9.50 4.40 0.15 12.54
Pier 5 9.50 4.40 0.15 31.35 Pier 5 9.50 4.40 0.15 31.35
Returnwall 4 7.97 4.40 0.15 21.03 Returnwall 4 7.97 4.40 0.15 21.03
Arch 0 7.50 12.00 0.70 0.00 Arch 0 7.50 12.00 0.70 0.00
Parapet 2 25.80 0.60 0.60 18.58 Parapet 2 25.80 0.60 0.60 18.58

c) RCC in Superstructure Cu.m. 209.21 c) RCC in Superstructure Cu.m. 209.21 0.00


Girders 0 8.20 7.70 1.10 0.00 Girders 0 8.20 7.70 1.10 0.00
Slab 6 9.20 4.30 0.80 189.89 Slab 6 9.20 4.30 0.80 189.89
Approach slab 2 9.20 3.50 0.30 19.32 Approach slab 2 9.20 3.50 0.30 19.32
Railings 0 63.14 0.50 1.20 0.00 Railings 0 63.14 0.50 1.20 0.00

d) Stone Slabs in super structure Sq.m 0 7.50 2.00 0.00 d) Stone Slabs in super structure Sq.m 0 7.50 2.00 0.00
e) Steel I beams MT 0 7.00 0.04 0.50 0.00 e) Steel I beams MT 0 7.00 0.04 0.50 0.00
f) HP ( > 300 dia) m 0 10.00 0.00 f) HP ( > 300 dia) m 0 10.00 0.00
g) Wearing coat sqm 1 63.14 8.20 517.75 g) Wearing coat sqm 1 63.14 8.20 517.75

Earthwork in excavation of foundation for structures Earthwork in excavation of foundation for structures
1.03 in all types of soil including lead and lifts complete Cu.m. 2493.02 in all types of soil including lead and lifts complete Cu.m. 966.82 -1526.19 PKE/15/MNBR/02
as per Tech. Spec. Cl. 304 as per Tech. Spec. Cl. 304
a) ordinary soil a) ordinary soil
Abutment AL 1 16.60 9.20 3.15 481.07 Abutment (A1) RL (188.794-10=178.794) 1 17.100 8.300 1.500 212.895
Abutment AR 1 16.60 9.20 4.65 710.15 Pier (P1) RL (187.126-10=177.296) 1 8.300 5.300 1.500 65.985
Pier - 1 1 13.10 6.30 3.15 259.97 Abutment (A2) RL (189.941-10-179.941) 1 17.100 8.300 1.500 212.895
Pier - 2 0 13.10 6.30 0.00 0.00 RetainingWall A1 side 1 15.000 5.800 1.650 143.550
Pier - 3 0 13.10 6.30 0.00 0.00 RetainingWall A2 side 1 15.000 4.600 1.650 113.850
Independent Returnwall on AL side 2 10.60 5.47 2.65 307.08 Toe wall A1 side 2 17.75 1.70 1.90 114.64
Independent Returnwall on AR side 2 10.60 5.65 4.15 497.32 Toe wall A2 side 2 15.95 1.70 1.90 103.01
Toe wall on side slopes AL 2 16.82 2.10 1.65 116.56
AR Side 2 17.44 2.10 1.65 120.87

b) in soft/weathered rock 0.00 b) in soft/weathered rock 120.17 120.17


AL 1 16.60 9.20 0.00 0.00 15 3.142x0.5x0.5x4.25=3.338 50.070
AR 1 16.60 9.20 0.00 0.00 6 3.142x0.5x0.5x4.25=3.338 20.028
Pier - 1 1 13.10 6.30 0.00 0.00 15 3.142x0.5x0.5x4.25=3.338 50.070
Pier - 2 0 13.10 6.30 0.00 0.00
Pier - 3 0 13.10 6.30 0.00 0.00
Independent Returnwall on AL side 2 10.60 5.47 0.00 0.00
Independent Returnwall on AR side 2 10.60 5.65 0.00 0.00

31
Excess/
Breadth Breadth Ref. Drawing No.
Sl. No. Description Unit No. Length (m) Depth (m) Quantity Description RL Unit No. Length (m) Depth (m) Quantity Saving
(m) (m)
Qty.

c) in Hard Rock 0.00 c) in Hard Rock 120.17 120.17


Abutment - A1 1 16.60 9.20 0.00 0.00 15 3.142x0.5x0.5x4.25=3.338 50.070
Abutment - A2 1 16.60 9.20 0.00 0.00 6 3.142x0.5x0.5x4.25=3.338 20.028
Pier - 1 1 13.10 6.30 0.00 0.00 15 3.142x0.5x0.5x4.25=3.338 50.070
Pier - 2 0 13.10 6.30 0.00 0.00
Pier - 3 0 13.10 6.30 0.00 0.00

1.03A

Back filling behind abutments, wing walls, return Back filling behind abutments, wing walls, return
walls and foundation trenches with selected granular walls and foundation trenches with selected granular
1.04 material of approved quality complete with all leads Cu.m. 1565.02 material of approved quality complete with all leads Cu.m. 170.97 -1394.05 PKE/15/MNBR/01
as per Tech. Spec. Cl.710.1.4 of IRC:78and lifts as per Tech. Spec. Cl.710.1.4 of IRC:78and lifts
complete complete
Abutment - AL 1 16.60 0.60 1.20 11.95 Behind return wall (A1) 2 2.350 1.824 3.648 31.274
Abutment - AR 1 16.60 0.60 1.20 11.95 Behind return wall (A2) 2 2.350 1.193 2.385 13.367
Pier - 1 1 13.10 0.60 1.50 11.79 Behind abutment A1 1 13.300 1.824 3.648 88.498
Pier - 2 0 13.10 0.60 1.50 0.00 Behind abutment A2 1 13.300 1.193 2.385 37.827
Pier - 3 0 13.10 0.60 1.50 0.00
Independent Returnwall on AL side 2 10.60 0.60 0.80 10.18
Independent Returnwall on AR side 2 10.60 0.60 0.80 10.18
Abutment - AL 1 16.60 7.70 1.95 249.25
Abutment - AR 1 16.60 7.70 3.45 440.98
Pier - 1 1 13.10 5.30 1.65 114.56
Pier - 2 0 13.10 5.30 -1.50 0.00
Pier - 3 0 13.10 5.30 -1.50 0.00
Pier - 1 1 2.00 1.00 1.65 3.30
Pier - 2 0 2.00 5.30 -1.50 0.00
Pier - 3 0 2.00 5.30 -1.50 0.00
Independent Returnwall on AL side 2 10.60 4.87 1.85 190.84
Independent Returnwall on AR side 2 10.60 4.87 3.35 345.58
Toe wall AL side 2 16.82 0.60 0.30 6.06
2 16.82 1.85 1.20 74.68
AR side 2 17.44 0.60 0.30 6.28
2 17.44 1.85 1.20 77.44

1.04A Earthwork filling in Quadrant at bridge Earthwork filling in Quadrant at bridge 1323.80 1323.80
A1 side corner slope(Quadreant) 1 510.927 3.648 931.930
A2 side corner slope(Quadreant) 1 328.610 2.385 391.868
Cement Concrete/Reinforced Cement Concrete in Cement Concrete/Reinforced Cement Concrete in
open foundation / leveling course including open foundation / leveling course including
1.05 centering and shuttering but excluding Cu.m. centering and shuttering but excluding Cu.m.
reinforcement all complete as per Tech. Spec.Cl. reinforcement all complete as per Tech. Spec.Cl.
1500, 1700 & 2100 1500, 1700 & 2100
a) M15 Grade - Levelling Course 105.72 a) M15 Grade - Levelling Course 118.83 13.11 PKE/15/MNBR/01
Abutment - AL 1 16.30 8.90 0.15 21.76 1 16.400 7.600 0.150 18.696
A1 Pile cap levelling course
Abutment - AR 1 16.30 8.90 0.15 21.76 -15 3.142x0.5x0.5=0.7855 0.150 -1.767
Pier - 1 1 12.80 6.00 0.15 11.52 1 7.600 4.600 0.150 5.244
P1 Pile cap levelling course
Pier - 2 0 12.80 6.00 0.15 0.00 -6 3.142x0.5x0.5=0.7855 0.150 -0.707
Pier - 3 0 12.80 6.00 0.15 0.00 1 16.400 7.600 0.150 18.696
A2 Pile cap levelling course
Independent Returnwall on A1 side 2 10.30 5.17 0.15 15.96 -15 3.142x0.5x0.5=0.7855 0.150 -1.767
Independent Returnwall on A2 side 2 10.30 5.35 0.15 16.54
Toe wall 2 16.52 1.80 0.15 8.92 Toe wall A1 side 2 17.55 0.60 0.50 10.53
Toe wall A2 side 2 15.75 1.85 1.20 69.91

32
Excess/
Breadth Breadth Ref. Drawing No.
Sl. No. Description Unit No. Length (m) Depth (m) Quantity Description RL Unit No. Length (m) Depth (m) Quantity Saving
(m) (m)
Qty.

2 17.14 1.80 0.15 9.26

c) M15 Grade - Below Approach Slab c) M15 Grade - Below Approach Slab
Below Approach slab 2 16.00 3.65 0.15 17.52 Below Approach slab 2 16.000 3.650 0.150 17.52 0.00

Cement concrete grade M20 in sub-structures and Cement concrete grade M20 in sub-structures and
1.06 59.51 59.93 0.41
Foundation as per Tech. Spec. Cl. 1700. Foundation as per Tech. Spec. Cl. 1700.
Toe wall Toe wall
AL A1
Base Slab 2 16.22 1.50 0.30 14.60 Base Slab 2 17.55 1.50 0.30 15.79 Length as per COS
Stem wall 2 16.22 0.25 1.80 14.60 Stem wall 2 17.55 0.25 1.80 15.79 Length as per COS
AR A2
Base Slab 2 16.84 1.50 0.30 15.16 Base Slab 2 15.75 1.50 0.30 14.17 Length as per COS
Stem wall 2 16.84 0.25 1.80 15.16 Stem wall 2 15.75 0.25 1.80 14.17 Length as per COS

Cement concrete grade M30 in sub-structures and Cement concrete grade M30 in sub-structures and
1.07 Cu.m. 33.60 Cu.m. 33.60 0.00
Foundation as per Tech. Spec. Cl. 1700. Foundation as per Tech. Spec. Cl. 1700.
Approach Slab 2 16.00 3.50 0.30 33.60 Approach Slab 2 16.00 3.50 0.30 33.60

Cu.m. 107.38 107.38 PKE/15/MNBR/ 01


Return Wall (A1 Side) 0.00 Return Wall (A1 Side) 2 2.950 0.750 11.68 51.67
Wall
Return Wall (A2 Side) 0.00 Return Wall (A2 Side) 2 2.950 0.750 11.53 51.02
Haunch in Return Walls A1 1 0.450 0.450 11.68 2.36
Haunch in Return Walls A2 1 0.450 0.450 11.53 2.33
53.30 53.30
Pedestrian Kerb M-20 grade 0.00 Pedestrian Kerb M-20 grade Rmt 2 53.300 53.300

Cement concrete grade M35 in Foundations as per Cement concrete grade M35 in Foundations as per PKE/15/MNBR/ 01
1.08 Cu.m. 595.81 Cu.m. 682.46 86.64
Tech. Spec. Cl. 1700. Tech. Spec. Cl. 1700. & 04

Independent Returnwall on AL side (Foundation) 2 10.00 4.87 0.80 77.86 A1 pile group 15 0.786 10.000 117.825

Independent Returnwall on AR side (Foundation) 2 10.00 5.05 0.80 80.84 P1 Pile group 6 0.786 10.000 47.130
Abutment base - AL 1 16.00 8.60 1.20 165.12 A2 pile group 15 0.786 10.000 117.825
Abutment base - AR 1 16.00 8.6 1.20 165.12
Foundation 1 12.50 5.70 1.50 106.88 Pile Cap Concrete
Foundation 0 12.50 5.70 1.50 0.00 A1 pile cap 1 16.100 7.300 1.500 176.30
Foundation 0 12.50 5.70 1.50 0.00 P1 Pile cap 1 7.300 4.300 1.500 47.09 PKE/15/MNBR/ 02
A2 pile cap 1 16.100 7.300 1.500 176.30

Cement concrete grade M35 in sub-structures as per Cement concrete grade M35 in sub-structures as per
1.09 Cu.m. 538.38 Cu.m. 577.60 39.22
Tech. Spec. Cl. 1700. Tech. Spec. Cl. 1700.
Return wall
Independent Returnwall on AL side wall 2 10.00 0.50 6.81 68.10 A1 shaft 1 16.000 1.400 9.076 203.30 PKE/15/MNBR/ 02
2 10.00 0.20 6.81 13.62 A1 Dirt Wall 1 16.000 0.300 2.071 9.94
Independent Returnwall on AR side 2 10.00 0.50 7.12 71.21 1 16.000 0.600 0.300 2.88
2 10.00 0.20 7.12 14.24 0.5 16.000 0.600 0.300 1.44
Abutments P1 shaft 1 4.900 1.100 11.944 64.38
Abutment - AL (Shaft) 1 16.00 0.80 3.05 38.98 0.25 3.140 1.210 11.944 11.35 PKE/15/MNBR/ 01
1 16.00 0.70 3.05 17.05 A2 shaft 1 16.000 1.400 8.929 200.01
2 4.80 0.80 3.05 23.39 A2 Dirt Wall 1 16.000 0.300 2.071 9.94
Abutment Cap AL 1 16.00 0.80 0.60 7.68 1 16.000 0.600 0.300 2.88
Triangle portion 2 16.00 0.45 0.60 4.32 0.5 16.000 0.600 0.300 1.44
1 16.00 1.70 0.90 24.48 A1 Pedestal 2 0.800 0.800 0.300 0.38
Dirt wall 1 16.00 0.30 2.30 11.04 2 0.800 0.800 0.363 0.46
Projection 1 16.00 0.30 0.30 1.44 1 0.800 0.800 0.426 0.27
Triangle portion 1 16.00 0.30 0.30 0.72 P1 pedestal 4 0.800 0.800 0.300 0.77
Abutment - AR (Shaft) 1 16.00 0.80 3.36 42.96 4 0.800 0.800 0.363 0.93
1 16.00 0.70 3.36 37.59 2 0.800 0.800 0.426 0.55
2 4.80 0.80 3.36 25.77 A1 Pedestal 2 0.800 0.800 0.300 0.38 PKE/15/MNBR/ 02

33
Excess/
Breadth Breadth Ref. Drawing No.
Sl. No. Description Unit No. Length (m) Depth (m) Quantity Description RL Unit No. Length (m) Depth (m) Quantity Saving
(m) (m)
Qty. PKE/15/MNBR/ 02
Abutment Cap AR 1 16.00 0.80 0.60 7.68 2 0.800 0.800 0.363 0.46
Triangle portion 2 16.00 0.45 0.60 4.32 1 0.800 0.800 0.426 0.27
1 16.00 1.70 0.90 24.48 A1 Abutment Cap 1 16.000 1.600 0.600 15.36
Dirt wall 1 16.00 0.30 2.30 11.04 A2 Abutment Cap 1 16.000 1.600 0.600 15.36
Projection 1 16.00 0.30 0.30 1.44 P1 Pier Cap 1 6.300 2.100 1.400 18.52
Triangle portion 1 16.00 0.30 0.30 0.72 2 3.700 2.100 1.050 16.32
Piers
Pier-1
1 10.50 1.00 3.83 40.19
Top cap 1 10.50 2.80 0.50 14.70
1 14.50 2.80 0.70 28.42
1 4.00 2.80 0.50 2.80
Pier-2
0 10.50 1.00 -3.57 0.00
Top cap 0 14.50 2.80 0.50 0.00
0 14.50 2.80 0.70 0.00
Pier-3
0 10.50 1.00 -3.57 0.00
Top cap 0 14.50 2.80 0.50 0.00
0 14.50 2.80 0.70 0.00
Cement concrete grade M40 in super structures as Cement concrete grade M40 in super structures as
1.10 Cu.m. 406.92 Cu.m. 509.46 102.54
per Tech. Spec. Cl. 1700. per Tech. Spec. Cl. 1700.
For 15 girder
Pedestrals 15 15.000 0.625 0.250 35.156
28 0.80 0.80 0.25 4.48 15 15.000 0.458 0.150 15.441
G1 or G2 or G3 or G4 or G5 (for one 15 15.000 0.445 0.150 15.019
Diaphgram 4 16.00 0.40 1.30 33.28 girder) 30 1.200 0.458 0.650 10.706
RC Deck slab 2 16.00 20.00 0.20 128.00 15 7.040 2.900 0.650 199.056
30 2.280 0.625 1.200 51.300
b) in RC Girder Cross Girder 2 12.900 0.300 1.300 10.062
End Block 14 4.00 Area = 1.05 58.80 Diaphragm 4 16.000 0.400 1.300 33.280
Tapering 14 2.40 Area = 0.92 31.00 Deck slab 2 20.000 12.600 0.220 110.880
Mid Section 14 13.60 Area = 0.80 151.37 4 20.000 1.700 0.21 28.560

Providing, cutting, bending and fixing in position of Providing, cutting, bending and fixing in position of
TMT bar reinforcement in reinforced cement TMT bar reinforcement in reinforced cement
1.11 T 171.98 T 280.40 108.42
concrete structures complete as per Tech. Spec. Cl concrete structures complete as per Tech. Spec. Cl
1600 1600
Toe wall 1 wt = 4.17 4.17 Toe wall 1 wt = 4.17 4.17
Abutment & Dirt wall 1 wt = 28.51 28.51 ABUTMENT 1 & 2 PILE 1 62.33
Piers 1 wt = 8.61 8.61 ABUTMENT 1 & 2 PILE CAP WITH PIER 71.80
Return Wall 1 wt = 15.05 15.05 ABUTMENT CAP 1 & 2 5.33
RC Girder 1 wt = 36.17 36.17 ABUTMENT 1 & 2 RETURN WALL 35.44
RC slab 1 wt = 15.36 15.36 PIER PILE 4.77
pedestals 1 wt = 0.54 0.54 PILE CAP WITH PIER 11.01
Diapharam 1 wt = 3.99 3.99 PIER CAP 4.53
Foundations 1 wt = 59.58 59.58 GIRDER 1 TO 2 SPAN-2 42.02

34
Excess/
Breadth Breadth Ref. Drawing No.
Sl. No. Description Unit No. Length (m) Depth (m) Quantity Description RL Unit No. Length (m) Depth (m) Quantity Saving
(m) (m)
Qty.
DECK SLAB SPAN 1 TO 2 25.38
MISCELLANEOS ITEM 11.40
DIPHARM 2.22

Filter media with stone crushed aggregates Filter media with stone crushed aggregates
1.12 abutments/return walls as per clause 2504.2.2 and Cu.m. 188.23 abutments/return walls as per clause 2504.2.2 and Cu.m. 410.52 222.28 PKE/15/MNBR/01
Tech. Spec. Cl.710.1.4 of IRC:78 Tech. Spec. Cl.710.1.4 of IRC:78
(3.142x5.892x7.081)/
Behind Abutment - AL 1 16.00 0.60 4.60 44.11 A1 end (both corner) (Below boulder) 2 4=32.772 0.150 9.832
(3.142x3.9975x4.804)/
Behind Abutment - AR 1 16.00 0.60 3.41 32.70 A2 end (both corner) (Below boulder) 2 4=15.085 0.150 4.526
Independent Returnwall on AL side 2 10.00 0.60 4.60 55.14 A1 Return Wall Cu.m. 2 2.35 0.60 10.23 28.835
Independent Returnwall on AR side 2 9.70 0.60 3.41 39.65 A2 Return Wall Cu.m. 2 2.35 0.60 9.08 25.600
Below pitching 4 55.46 0.15 16.64 A1 Abutment Cu.m. 1 14.50 0.60 10.23 88.957
A2 Abutment Cu.m. 1 14.50 0.60 9.08 78.979
A1 Approach Cu.m. 1 30.00 0.15 20.46 92.070
A2 Approach Cu.m. 1 30.00 0.15 18.16 81.720
Providing weep holes in abutments, returnwalls, Providing weep holes in abutments, returnwalls,
1.13 with 100mm dia AC pipes complete as per drawing no's 288.00 with 100mm dia AC pipes complete as per drawing No's 418.00 130.00 PKE/15/MNBR/02
and Tech. Spec. Cl. 2706 and Tech. Spec. Cl. 2706
Abutment - AL 1 16.00 4.60 1.00 74.00 Abutment - A1 1 16.00 10.00 160.00
Abutment - AR 1 16.00 3.41 1.00 55.00 Abutment - A2 1 16.00 9.00 144.00
Independent Returnwall on AL side 2 10.00 4.60 1.00 92.00 A1 Return Wall 2 3.00 10.00 60.00
Independent Returnwall on AR side 2 9.70 3.41 1.00 67.00 A2 Return Wall 2 3.00 9.00 54.00

1.14 Providing and fixing Expansion joint


Bitumin Plug joint Rmtr 2 16.00 0.30 9.60 Bitumin Plug joint Rmtr 2 16.00 0.30 9.60
strip seal expansion joint Rmtr 3 16.00 48.00 Providing and fixing Strip Seal Expansion joint Rmtr 3 16.00 48.00 0.00

Providing and fixing Tar paper bearing complete as Providing and fixing Tar paper bearing complete as
1.15 9.60 9.60 0.00
per drawing and IRC:SP:13-1973. per drawing and IRC:SP:13-1973.
in Approach slab Sq.m 2 16.00 0.30 9.60 in Approach slab Sq.m 2 16.00 0.30 9.60

Supply, fitting and fixing in position true to line and Supply, fitting and fixing in position true to line and
1.16 level POT-PTFE Bearings complete as per Tech. 28 level POT-PTFE Bearings complete as per Tech. 20.000 -8.00
Spec. Cl. 2000 Spec. Cl. 2000
Pot-PTFE Bearing - 200 MT No's 2 2 Free bearing No's 6 6.000
Guided Pot-PTFE Bearing - 200 MT No's 24 24 Long guide bearing 4 4.000
Free Pot-PTFE Bearing - 200 MT No's 2 2 Transverse bearing 6 6.000
Fix bearing 4 4.000
Fixed Pot Bearing - 250 MT No's 0 0
Guided Pot-PTFE Bearing - 250 MT No's 0 0
Free Pot-PTFE Bearing - 250 MT No's 0 0

Fixed Pot Bearing - 300 MT No's 0 0


Guided Pot-PTFE Bearing - 300 MT No's 0 0
Free Pot-PTFE Bearing - 300 MT No's 0 0

Fixed Pot Bearing - 350 MT No's 0 0


Guided Pot-PTFE Bearing - 350 MT No's 0 0
Free Pot-PTFE Bearing - 350 MT No's 0 0

Proving and fixing Drainage spouts complete as per Proving and fixing Drainage spouts complete as per 27 27
1.17 Each 18 18.00 Each 9.00 PKE/15/MNBR/01
Tech. Spec. Cl. 2705 Tech. Spec. Cl. 2705

35
Excess/
Breadth Breadth Ref. Drawing No.
Sl. No. Description Unit No. Length (m) Depth (m) Quantity Description RL Unit No. Length (m) Depth (m) Quantity Saving
(m) (m)
Qty.
Providing and filling joint sealing compound as per Providing and filling joint sealing compound as per
drawings with coarse sand and 6 percent bitumen by drawings with coarse sand and 6 percent bitumen by
weight (0.083 kg/m bitumen) including cost and weight (0.083 kg/m bitumen) including cost and
1.18 Rmtr 3 16.00 48.00 Rmtr 3 16.00 48.00 0.00
conveyance of all materials, labour, fixing in conveyance of all materials, labour, fixing in
position, etc., complete as per drawing and Tech. position, etc., complete as per drawing and Tech.
Spec. Cl Spec. Cl

Providing and laying wearing course on top of deck Providing and laying wearing course on top of deck
1.19 complete as per Tech.Spec.Cl.515 & 2702 65mm Sq.m 1 47.00 11.00 0.07 33.61 complete as per Tech.Spec.Cl.515 & 2702 65mm Sq.m 1 47.00 11.00 0.065 33.61 0.00 PKE/15/MNBR/01
Thick (40BC+ 25 Asphaltic) Thick (40BC+ 25 Asphaltic)

Construction of Crash Barrier M40 grade incl. cost Construction of Crash Barrier M40 grade incl. cost
1.20 of all materials, labour, lead, lifts, loading, Rmtr 98.00 of all materials, labour, lead, lifts, loading, Rmtr 98.000 0.00
unloading etc., complete unloading etc., complete
Inner 0 49.00 0.00 Both Hand Side 2 49.00 98.00
Outer 2 49.00 98.00 0.00

1.21 PVC Utility pipes (150 dia) Rmtr 2 49.00 98.00 PVC Utility pipes (110 dia) Rmtr 2 49.00 98.00 0.00

Providing and applying 2 coats of Enamel paint to Providing and applying 2 coats of Enamel paint to
1.22 plastered concrete surface complete as per Sq.m 1 98.00 0.29 28.32 plastered concrete surface complete as per Sq.m 2 49.00 2.00 196.00 167.68
Tech.Spec Cl. 800 for RC Crash barrier Tech.Spec Cl. 800 for RC Crash barrier

Painting details of Structure and span arrangements Painting details of Structure and span arrangements
1.23 No's 4 4.00 No's 4 4.00 0.00
as Tech.Spec.Cl. 800 as Tech.Spec.Cl. 800

Provide and lay stone pitching as per Tech. Spec. Provide and lay stone pitching as per Tech. Spec. A1 end
1.24 Cu.m. 66.55 Cu.m. 410.40 343.85
Cl. 2504. Cl. 2504. (both (3.142x5.89
corner)
A2 end
for quandrantal pitching 4 Area= 55.46 0.30 66.55 for quandrantal pitching (Below 2 2x7.081)/ 0.300 19.663
(both 4=32.772
boulder (3.142x3.99
corner)
)(Below 2 75x4.804)/ 0.300 9.051
4=15.085
Sides A1 Approach boulder 2 30.00 11.18 0.30 201.17
)
Sides A2 Approach 2 30.00 10.03 0.30 180.52
1.25 Metallic crash barrier m15 garde Cum 40.00 Metallic crash barrier m15 garde Cum 40.00 0.00

2 10.00 20.00 2 10.00 20.00


2 10.00 20.00 2 10.00 20.00

1.26 RCC Railing Rmtr RC Railing Rmtr 98.00 0.00


2 49.00 98.00 2 49.00 98.00

Painting of concrete hand rails/ parapets/ crash Painting of concrete hand rails/ parapets/ crash
barriers with two coats of enamel paint as per barriers with two coats of enamel paint as per
1.27 Sq.m 274.40 Sq.m 470.46 196.06
Technical Specification and the directions of the Technical Specification and the directions of the
Engineer Engineer

1 98.00 2.80 274.40 Crash Barrier 2 49.00 2.43 238.14


RC Railing 2 48.40 2.40 232.32

Paintinting of sub structures & super structures Paintinting of sub structures & super structures
1.28 with two coats of enamel paint as per Technical Sq.m 778.13 with two coats of enamel paint as per Technical Sq.m 2616.23 1838.10
Specification and the directions of the Engineer Specification and the directions of the Engineer

sub structures 1 371.21 371.21 Super structures 1 41.40 32.20 1333.08


Super structures 1 406.92 406.92 Sub structures :
Abutment A1 1 34.80 11.08 385.44
Abutment A2 1 34.80 9.93 345.53
Pier 1 25.82 11.94 308.35
Pier Cap 2 6.00 1.40 16.80
4 3.70 1.05 15.54
1 13.70 2.10 28.77

36
Excess/
Breadth Breadth Ref. Drawing No.
Sl. No. Description Unit No. Length (m) Depth (m) Quantity Description RL Unit No. Length (m) Depth (m) Quantity Saving
(m) (m)
Qty.
Abutment Cap 4 16.00 0.60 38.40
4 1.60 0.60 3.84
Dirt Wall 4 16.00 2.20 140.48

ChippinganddressingoftheR.C.C.pilesupto0.60meter
includingcleaningreinforcementandremovalofdisman
tledmaterialsuptoadistanceof50meterbeyondthebuild Nos 36.00 36.00
ingareaetc.for providing pile caps.Spec :(As directed
by Engineer in Charge
Pile in A1 15 15.00
Pile in A2 15 15.00
Pile in P1 6 6.00

Emptyboringfor725to1050mmdia.boredR.C.C.castin
situpilesincludingwithdrawalofshell, removal of earth
360.00 360.00
to a distance of 50 metres etc. complete.Spec :(As
directed by Engineer in Charge)
Pile in A1 15 10 150.00
Pile in A2 15 10 150.00
Pile in P1 6 10 60.00

3.00 3.00
Pile load test Nos 3 3.00

Mt 55.79 55.79
6mm thick MS Liner Mt 36 9.50 3.14 Wt.=0.0472mt 50.47
12mm thick MS Cutting edge Mt 36 0.50 3.14 Wt.=0.094mt 5.31

37
TOE WALL 59.93
RETURN WALL 107.38
APPROACH SLAB 33.60
FOUNDATION 682.46
SUBSTRUCTURE 577.60
SUPER STRUCTURE 509.46
1970.42
SUMMARY OF SUB-STRUCTURE: COS DPR EXCESS
Upto 5m Height 301.97 Cum 491.21 -189.23
5m to 7.5m Height 150.99 47.16 103.83
7.5m to 10m Height 158.66 158.66
Above 10m Height 69.45 69.45

AS PER COS:
Length
Description RL Unit No.
(m)

Cement concrete grade M35 in sub-structures as per


Cu.m.
Tech. Spec. Cl. 1700.

A1 shaft 1 16.000

A1 shaft Upto 5m height 1 16.000


A1 shaft 5m to 7.5m height 1 16.000
A1 shaft 7.5m to 10m height 1 16.000
A1 Dirt Wall (7.5 to 10m height)
1 16.000
1 16.000
0.5 16.000
P1 shaft 1 4.900
P1 shaft Upto 5m height 1 4.900
0.25 3.140
P1 shaft 5m to 7.5m height 1 4.900
0.25 3.140
P1 shaft 7.5m to 10m height 1 4.900
0.25 3.140
P1 shaft Over 10m Height 1 4.900
0.25 3.140
A2 shaft 1 16.000
A2 shaft Upto 5m height 1 16.000
A2 shaft 5m to 7.5m height 1 16.000
A2 shaft 7.5m to 10m height 1 16.000

A2 Dirt Wall(7.5 to 10m height) 1 16.000


Over 10m Height 1 16.000
1 16.000
0.5 16.000
A1 Pedestal (7.5m to 10m height) 2 0.800
2 0.800
1 0.800
P1 Pedestal (above 10m height) 4 0.800
4 0.800
2 0.800
A2 Pedestal (7.5m to 10m height) 2 0.800
2 0.800
1 0.800
A1 Abutment Cap(7.5m to 10m height) 1 16.000
A2 Abutment Cap(7.5m to 10m height) 1 16.000
P1 Pier Cap(Above 10m height) 1 6.300
2 3.700

Return Wall (A1 Side) 2 2.950


Upto 5m height 2 2.950
5m to 7.5m height 2 2.950
Wall
7.5 to 10m height 2 2.950
Above 10m height 2 2.950
Return Wall (A2 Side) 2 2.950
Upto 5m height 2 2.950
5m to 7.5m height 2 2.950
7.5 to 10m height 2 2.950
Above 10m height 2 2.950
Haunch in Return Walls A1 1 0.450
Upto 5m height 1 0.450
5m to 7.5m height 1 0.450
7.5 to 10m height 1 0.450
Above 10m height 1 0.450
Haunch in Return Walls A2 1 0.450
Upto 5m height 1 0.450
5m to 7.5m height 1 0.450
7.5 to 10m height 1 0.450
Above 10m height 1 0.450
Excess/ Ref.
Breadth Drawing
Depth (m) Quantity Saving
(m) No.
Qty.

1010.45

PKE/15/
1.400 9.076 203.30 MNBR/
02
1.400 5.000 112.00
1.400 2.500 56.00
1.400 1.576 35.30

0.300 2.071 9.94


0.600 0.300 2.88
0.600 0.300 1.44
1.100 11.944 64.38
1.100 5.000 26.95
1.210 5.000 4.75
1.100 2.500 13.48
1.210 2.500 2.37
1.100 2.500 13.48
1.210 2.500 2.37 PKE/15/
1.100 1.944 10.48 MNBR/
1.210 1.944 1.85 01
1.400 8.929 200.01
1.400 5.000 112.00
1.400 2.500 56.00
1.400 1.429 32.01

0.300 1.071 5.14


0.300 1.000 4.80
0.600 0.300 2.88
0.600 0.300 1.44
0.800 0.300 0.38
0.800 0.363 0.46

PKE/15/
0.800 0.426 0.27
0.800 0.300 0.77
0.800 0.363 0.93
0.800 0.426 0.55 PKE/15/
0.800 0.300 0.38 MNBR/
0.800 0.363 0.46 02
0.800 0.426 0.27
1.600 0.600 15.36
1.600 0.600 15.36
2.100 1.400 18.52
2.100 1.050 16.32

0.750 11.68 51.67


0.750 5.00 22.13
0.750 2.50 11.06
0.750 2.50 11.06
0.750 1.17 5.17
0.750 11.53 51.02
0.750 5.00 22.13
0.750 2.50 11.06
0.750 2.50 11.06
0.750 1.15 5.10
0.450 11.68 2.36
0.450 5.00 1.01
0.450 2.50 0.51
0.450 2.50 0.51
0.450 1.68 0.34
0.450 11.53 2.33
0.450 5.00 1.01
0.450 2.50 0.51
0.450 2.50 0.51
0.450 1.53 0.31
Length Breadth
Description Unit No. Depth (m) Quantity
(m) (m)

Cement concrete grade M35 in sub-structures as


Cu.m. 705.54
per Tech. Spec. Cl. 1700.

Return wall

Independent Returnwall on AL side wall 2 10.00 0.50 6.81 68.10

Upto 5m Height 2 10.00 0.50 5.00 50.00


5m to 7.5m Height 2 10.00 0.50 1.81 18.10
2 10.00 0.20 6.81 13.62
Upto 5m Height 2 10.00 0.20 5.00 10.00
5m to 7.5m Height 2 10.00 0.20 1.81 3.62
Independent Returnwall on AR side 2 10.00 0.50 7.12 71.21
Upto 5m Height 2 10.00 0.50 5.00 50.00
5m to 7.5m Height 2 10.00 0.50 2.12 21.20
2 10.00 0.20 7.12 14.24
Upto 5m Height 2 10.00 0.20 5.00 10.00
5m to 7.5m Height 2 10.00 0.20 2.12 4.24
Abutments
Abutment - AL (Shaft) 1 16.00 0.80 3.05 38.98
1 16.00 0.70 3.05 17.05
2 4.80 0.80 3.05 23.39
Abutment Cap AL 1 16.00 0.80 0.60 7.68
Triangle portion 2 16.00 0.45 0.60 4.32
1 16.00 1.70 0.90 24.48
Dirt wall 1 16.00 0.30 2.30 11.04
Projection 1 16.00 0.30 0.30 1.44
Triangle portion 1 16.00 0.30 0.30 0.72
Abutment - AR (Shaft) 1 16.00 0.80 3.36 42.96
1 16.00 0.70 3.36 37.59
2 4.80 0.80 3.36 25.77
Abutment Cap AR 1 16.00 0.80 0.60 7.68
Triangle portion 2 16.00 0.45 0.60 4.32
1 16.00 1.70 0.90 24.48
Dirt wall 1 16.00 0.30 2.30 11.04
Projection 1 16.00 0.30 0.30 1.44
Triangle portion 1 16.00 0.30 0.30 0.72
Piers
Pier-1
1 10.50 1.00 3.83 40.19
Top cap 1 10.50 2.80 0.50 14.70
1 14.50 2.80 0.70 28.42
1 4.00 2.80 0.50 2.80
Pier-2
0 10.50 1.00 -3.57 0.00
Top cap 0 14.50 2.80 0.50 0.00
0 14.50 2.80 0.70 0.00
Pier-3
0 10.50 1.00 -3.57 0.00
Top cap 0 14.50 2.80 0.50 0.00
0 14.50 2.80 0.70 0.00
UPGRADATION OF GADCHIROLI-ASTHI ROAD TO TWO LANE WITH PAVED SHOULDERS/FOUR LANE CONFIGRATION ( PACKAGED NO- NH/IAHE/02) IN THE STATE OF MAHARASTRA ON ENGINEERING, PROCURMENT & CONSTRUCTION (EPC) BASIS CONTRACT DESIGN CHAINAGE - CH. 123+100 TO CH. 151+020

Change of Scope Abstruct


Minor Bridge 127+120

ANNEXURE-III

Derived Rate, with ADD


Quantity as Quantity as Excess Qty. due to SSR 2019-20 Item
Sl. No. Description Unit SSR Rate Area Weightage of GST(IGST+SGST) @ Amount Remarks
per DPR per Revision COS No.
30% (Rs) 12%

Clearing and grubbing at site which includes cleaning and removal


1.01 of vegetation growth from structures, channel and protective works Sq.m 1560 3751 2190.53 2.09 9.00 11.70 13.10 28704.71
as per direction of Engineer as per Tech.Spec. Cl. 201

Dismantle existing cross drainage structure Including disposal of


1.02 resulting material and salvage reusable materials complete as per
Tech.Spec.Cl. 202
a) Brick / Stone/RCC structure Cu.m. 414 414 -
b) PCC in Substructure Cu.m. 83 83 -
c) RCC in Superstructure Cu.m. 209 209 -
g) Wearing coat Cu.m. 518 518 -
Earthwork in excavation of foundation for structures in all types of
1.03
soil including lead and lifts complete as per Tech. Spec. Cl. 304
a) ordinary soil Cu.m. 2493 967 -1526.19 12.02 181.00 235.30 263.54 -402206.65
b) in soft/weathered rock Cu.m. - 120 120.17 12.08 463.00 601.90 674.13 81008.61
c) in Hard Rock Cu.m. - 120 120.17 12.09 918.00 1193.40 1336.61 160617.51
Backfilling behind abutment, wing wall and returnwall as per
1.04 drawings and technical specifications etc. complete. (by granular Cu.m. 1565 171 -1394.05 12.70 728.00 946.40 1059.97 -1477652.40
material)
Providing earthwork in embankment with approved materials
obtained from other sources upto lead of 50m. including all
lifts,laying in layers of 20cm.to 30cm.thickness breaking
1.05 clods,dressing to the required lines,curves,grades & section,watering Cu.m. - 1324 1323.80 424.00 551.20 617.34 817238.75
and compaction with vibratory roller withV-Sat attachment to
achieve not lessthan 97% of standard proctordensity etc. complete
( Material obtained from Other sources)
Cement Concrete/Reinforced Cement Concrete in open foundation /
leveling course including centering and shuttering but excluding
1.06
reinforcement all complete as per Tech. Spec.Cl. 1500, 1700 &
2100
a) M15 Grade - Levelling Course Cu.m. 106 119 13.11 17.38 5916.00 7690.80 8613.70 112936.68
Below Approach slab Cu.m. 18 18 - 14.58 4729.00 6147.70 6885.42 -
Providing and casting in situ or precast tapering R.C.C.M-20
Barrier type Kerb with gutter (asperIRC861983) embedded 125mm
below ground level over M10 PCC finished neatly
1.07 withC.M.1:2,setting the same in C.M.1:2,including the required Rmtr - 53 53.30 7.04 750.00 975.00 1092.00 58203.60
excavation in any strata and removing the excavated stuff anywhere
in city and redoing the surface as specified and directed by
Engineering In-charge. Using Concrete Batching and Mixing Plant
Empty boring for 725 to1050 mm dia.bored R.C.C.cast in situ piles
including withdrawal of shell, removal of earth to a distance of 50
metres etc. complete.Spec :(As directed by Engineer in Charge)
1.08 Rmtr - 360 360.00 22.54 1219.00 1584.70 1774.86 638951.04

Providing,placing and driving in position 6mm thick permanent MS


liner upto required depth with 12mm thick MS cutting edge of 0.50
meter length of bottom including fabricating,cutting the MS sheet to
1.09 required diameter and shape,welding the joints and driving with the Mt - 56 55.79 15.13 75547.00 98211.10 109996.43 6136177.36
help of required machineries, all materials, labour and lift etc.
complete.

634544964.xlsx 46 of 48
Derived Rate, with ADD
Quantity as Quantity as Excess Qty. due to SSR 2019-20 Item
Sl. No. Description Unit SSR Rate Area Weightage of GST(IGST+SGST) @ Amount Remarks
per DPR per Revision COS No.
30% (Rs) 12%

Carrying out load test for1.5 times the proposed safe working load
on the pile in driven position above 900mm diameter including
construction of test cap,use of accessories and instruments including
1.10 providing graphs as per I.S.code or Std.Specifications and Nos - 3 3.00 22.49 316432.00 411361.60 460724.99 1382174.98
dismantling the test cap after testing and cleaning the site complete

Chipping and dressing of the R.C.C.piles upto 0.60 meter including


cleaning reinforcement and removal of dismantled materials upto a
1.11 Nos - 36 36.00 22.55 597.00 776.10 869.23 31292.35
distance of 50 meter beyond the building area etc.for providing pile
caps.Spec :(As directed by Engineer in Charge

Cement concrete grade M20 in sub-structures and Foundation as


1.12 Cu.m. 59.51 59.93 0.41 17.39 6200.00 8060.00 9027.20 3734.82
per Tech. Spec. Cl. 1700.

Cement concrete grade M30 in sub-structures and Foundation as


1.13 Cu.m. - 107 107.38 17.45 6942.00 9024.60 10107.55 1085360.43
per Tech. Spec. Cl. 1700.

1.14 Approach Slab Cu.m. 34 34 0.00 14.59 8427.00 10955.10 12269.71 0.00
Cement concrete grade M35 in Foundations and Sub-structure as
1.15 Cu.m. 1134 1260 125.87 17.46 7615.30 9899.89 11087.88 1395582.36
per Tech. Spec. Cl. 1700.
Cement concrete grade M40 in super structures as per Tech. Spec.
1.16 Cu.m. 407 509 102.54 14.90 8138.00 10579.40 11848.93 1214931.31
Cl. 1700.
Providing,cutting,bending,hooking,tying and laying in position
1.17 TMT FE500 steel bars for reinforcement for all RCC works as per Mt 172 280 108.42 14.01 62581.00 81355.30 91117.94 9879452.37
detailed drawings etc. complete.

Providing and laying filter material underneath pitching in slopes as


1.18 Cu.m. 188 411 222.28 14.74 1946.00 2529.80 2833.38 629816.43
per drawings and technical specifications etc. complete.

Providing weep holes in abutments, returnwalls, with 100mm dia


1.19 no's 288 418 130.00 17.37 424.00 551.20 617.34 80254.72
AC pipes complete as per drawing and Tech. Spec. Cl. 2706
1.20 Providing and fixing Expansion joint
Providing expansion joints with 25mm thick bituminous pad as per
Sq.m 10 10 - 14.33 845.00 1098.50 1230.32 -
detailed drawings etc.complete.
Providing copper plate expansion joints as per detailed drawing
Rmtr 48 48 - 14.32 3816.00 4960.80 5556.10 -
No.4/D-1 of 1972 D type etc. complete.
Providing and fixing Tar paper bearing complete as per drawing and
1.21 -
IRC:SP:13-1973.
in RC Slab Sq.m 10 10 - 13.02 81.00 105.30 117.94 -

Supply, fitting and fixing in position true to line and level POT-
1.22 Each 28 -28.00 DPR Rate 46600.00 60580.00 -1696240.00 DPR Qty
PTFE Bearings complete as per Tech. Spec. Cl. 2000

Free bearing 6 6.00 New rate 29618.00 38503.40 43123.81 258742.85 COS Qty
Long guide bearing 4 4.00 New rate 34309.00 44601.70 49953.90 199815.62
Transverse bearing 6 6.00 New rate 33259.00 43236.70 48425.10 290550.62
Fix bearing 4 4.00 New rate 49029.00 63737.70 71386.22 285544.90
Proving and fixing Drainage spouts complete as per Tech. Spec. Cl.
1.23 Each 18 27 9.00 897.99 1167.39 1307.47 11767.26 DPR Rate
2705

Providing and filling joint sealing compound as per drawings with


coarse sand and 6 percent bitumen by weight (0.083 kg/m bitumen)
1.24 Rmtr 48 48 - 14.64 36.00 46.80 52.42 -
including cost and conveyance of all materials, labour, fixing in
position, etc., complete as per drawing and Tech. Spec. Cl

634544964.xlsx 47 of 48
Derived Rate, with ADD
Quantity as Quantity as Excess Qty. due to SSR 2019-20 Item
Sl. No. Description Unit SSR Rate Area Weightage of GST(IGST+SGST) @ Amount Remarks
per DPR per Revision COS No.
30% (Rs) 12%

Providing and laying cement concrete wearing coat M30grade with


batch mix type/concrete mixer with SCADA including
1.25 reinforcement as per drawings and technical specifications Cum 34 34 - 14.86 9785.00 12720.50 14246.96 -
etc.complete with fine agreegates of required specifications ( VSI
sand finely washed etc )
- -
Providing Reinforced cement concrete crash barrier at the edges of
the road,approaches to bridge structures and medians,constructed
with R.C.C.M30 Grade concrete with HYSD reinforcement
conforming to IRC:21 and dowel bars 25mmdia, 450mm long at
expansion joints filled with pre-moulded asphalt filler board,keyed
to the structure on which it is built and installed as per design given
1.26 in the enclosure to MOST circular Number RW/NH-33022/1/94- Rmtr 98 98 - 7.37 3086.00 4011.80 4493.22 -
DOIII dated 24 June1994 as per dimensions in the approved
drawing and at locations directed by the Engineer,all as specified
etc. complete. Spec:MORTH 2013 Cl 811 Page No 360

1.27 PVC Utility pipes (110 dia) Rmtr 98 98 17.36 460.00 598.00 669.76 -

Providing and applying 2 coats of Enamel paint to plastered


concrete surface complete as per Tech.Spec Cl. 800 for RC Crash New Rate as per
1.28 Sq.m 28.32 196 167.68 101.00 131.30 147.06 24658.06
barrier Morth S/Data-803

Providing and laying pitching on slopes laid over prepared filter


media including boulder apron laid dry infront of toe of
1.29 embankment complete as per drawing and technical specifications Cu.m. 66.55 410 343.85 14.72 1407.00 1829.10 2048.59 704417.65
etc. complete. (by stone/boulder)

1.30 Metallic crash barrier m15 garde Cum 40 40 - 17.38 5916.00 7690.80 8613.70 -

Providing RCC railing of castinsitu/ready mix RCC posts with


M20CC of trap/granite/quartzite/gneiss metal for horizontal and
vertical members as per detailed drawings including
reinforcement,scaffolding,centering,formwork,compaction,finishing
1.31 Rmtr 98 98 - 14.49 1646.00 2139.80 2396.58 -
and curing with watering chemical compound etc.complete.(fully
automatic microprocessor based PLC with SCADA enabled with
reversible drum type mixer/concrete batch mix plant(panmixer)fine
agreegates of required specifications ( VSI sand finely washed etc )

Painting of concrete hand rails/ parapets/ crash barriers with two


1.32 coats of enamel paint as per Technical Specification and the Sq.m 274 470 196.06 DPR Rate -59.50 -77.35 -86.63 -16985.07 Qty as per DPR
directions of the Engineer
New Rate 101.00 131.30 147.06 0.00 Qty as per COS
Paininting of sub structures & super structures with two coats of
1.33 enamel paint as per Technical Specification and the directions of the Sq.m 778 2616 1838.10 New Rate 101.00 131.30 147.06 270303.73
Engineer

Providing and applying epoxy paint primer with middle coat and top
1.34 Sq.m 778 2616 1838.10 19.04 606.00 787.80 882.34 1621822.35
coat to superstructure including scaffolding etc complete.

Total Excess amount 23,810,976.95