Extra Quantity

Chainage
S.No Layer Length Unit Quantity SSR Rates
From To
1 Emb - Cutting 147+480 148+570 1090 CUM 2,099.08 85
2 Emb - Filling 147+480 148+570 1090 CUM - 13.61 442
3 Sub-Grade 147+480 148+570 1090 CUM 1,630.60 712
4 GSB 147+480 148+570 1090 CUM 1,212.52 1542
5 DLC 147+480 148+570 1090 CUM 686.70 3240
6 PQC 147+480 148+570 1090 CUM 1,425.28 6421
7 Median Kerb 147+480 148+570 1090 Rmt 2180.00 481
Median Earth
8 147+480 148+570 1090 CUM 814.67
Quantity
9 Paver Block 147+480 148+570 1090 Sq.Mtr 4360.00 1000
WMM 147+480 148+570 1090 CUM 1090.00
Sand Filling 147+480 148+570 1090 CUM 109.00
10 Hand Railing 147+480 148+570 1090 Sq.Mtr 2180.00 694/Kg
11 Earthen 147+480 148+570 1090 CUM -2114.60 45
Shoulder
S.No in
Amount
SSR book
178,421.74 87
- 6,014.00 101
1,160,987.20 110
1,869,699.67 116
2,224,908.00 181
9,151,748.56 171
1,048,580.00 311

4,360,000.00 1597

1884
- 95,157.00 45
UPGRADATION OF GADCHIROLI-ASTHI ROAD TO TWO LANE WITH PAVED SHOULDERS/FOUR LANE CONFIGRATION ( PACKAGED NO- NH/IAHE/02) IN THE STATE OF MAHARASTRA ON
Project: ENGINEERING, PROCURMENT & CONSTRUCTION (EPC) BASIS CONTRACT DESIGN CHAINAGE - CH. 123+100 TO CH. 151+020

Client: National Highway ( P.W.D. ) Maharastra

Independent Consultant: LNM Infra Projects Pvt. Ltd. Bhopal

EPC Contractor: A.G. Construction Pvt. Ltd.

Structure 135+695 Box culvert


Change of Scope Abstruct
ANNEXURE-V

Add
SSR 2019-20 ADD GST(IGST+SGST)
S.No Description SSR item No As per DPR As per COS Excess Qty. Unit Area Weightage of Amount Remarks
Rate @ 12%
30% (Rs)

Excavation for foundation in earth,soils of all types, sand, gravel, soft


1 murum including shoring and strutting, dewatering as necessary and 12.02 349.595 619.458 269.863 Cum 181.000 235.30 263.54 71,118.59
disposing off excavated stuff as directed etc. complete upto 1.5m lift.

Cement Concrete/ Reinforced Cement Concrete in open foundation /


2 leveling course including centering and shuttering but excluding
reinforcement all complete as per Tech. Spec.Cl. 1500, 1700 & 2100

M-15 17.38 108.748 127.270 18.522 Cum 5916.000 7,690.80 8,613.70 159,544.60

Providingandlayinginsitu/readymixM-35plaincementconcreteoftrap/
3 granite/quartzite/
gneissmetalforcastincitupiers,abutment,returns,wingsetc.

M-35 17.42 138.103 219.332 81.229 Cum 6655.000 8,651.50 9,689.68 787,086.89

Providing, cutting, bending, hooking, tying and laying in position TMT


4 FE500 steel bars for reinforcement for all RCC works as per detailed
drawings etc. complete.

Steel 14.01 12.606 22.067 9.461 Mt 62581.000 81,355.30 91,117.94 862,066.79

Total 1,879,816.88

634544968.xlsx 3 of 6
UPGRADATION OF GADCHIROLI-ASTHI ROAD TO TWO LANE WITH PAVED SHOULDERS/FOUR
Project: LANE CONFIGRATION ( PACKAGED NO- NH/IAHE/02) IN THE STATE OF MAHARASTRA ON
ENGINEERING, PROCURMENT & CONSTRUCTION (EPC) BASIS CONTRACT DESIGN CHAINAGE -
CH. 123+100 TO CH. 151+020
Client: National Highway ( P.W.D. ) Maharastra
Independent LNM Infra Projects Pvt. Ltd. Bhopal
Consultant:
EPC A.G. Construction Pvt. Ltd.
Contractor:
Structure 135+695 Box culvert
CH- 135+695 ( 2x4x3 ) ( 18.36 Mtr )

Side Type of Structure Nos Length Width Depth Grade Total


Box Excavation 1 19.36 10.1 3.168 619.458
PCC PCC 1 18.360 9.900 0.150 M15 27.265 27.265
Parapet Wall 2 16.700 0.400 0.500 M15 6.680 6.680
PCC Toe Wall 4 8.490 0.800 0.150 M15 4.075
1st Lift 4 8.290 0.600 0.200 M15 3.979 18.002
2nd Lift 4 8.290 0.300 1.000 M15 9.948
PCC Courtain Wall 1 19.650 1.850 0.150 M15 5.453
1st Lift 1 19.450 1.650 0.550 M15 17.651
2nd Lift 1 19.450 0.750 0.750 M15 10.941 42.359
Down Stream
3rd Lift 1 19.450 0.750 0.450 M15 6.564
4th Lift 1 19.450 0.450 0.200 M15 1.751
PCC Courtain Wall 1 19.650 1.500 0.150 M15 4.421
1st Lift 1 19.450 1.300 0.800 M15 20.228
32.964
2nd Lift Down Stream 1 19.450 0.450 0.750 M15 6.564
3rd Lift 1 19.450 0.200 0.450 M15 1.751
127.270
Raft 1 18.360 9.700 0.350 M35 62.332
Raft Sheir Key 1 9.700 0.850 0.850 M35 7.008 71.814
1 9.700 0.300 0.850 M35 2.474
Side Bottom Haunch 1 18.360 0.150 0.150 M35 0.207
0.413
Wall 1 18.360 0.150 0.150 M35 0.207
Outer Wall 2 18.360 0.350 3.000 M35 38.556
60.588
Inner Wall 1 18.360 0.400 3.000 M35 22.032
Side Top Haunch 1 18.360 0.150 0.150 M35 0.207
0.413
Wall 1 18.360 0.150 0.150 M35 0.207
Slab 1 18.360 9.100 0.450 M35 75.184 75.184
Fly Wall 4 3.500 0.400 1.500 M35 8.400
10.920
Fly Wall 4 3.500 0.400 0.450 M35 2.520
219.332

M-15 127.270
Concrete
M-35 219.332

8mm 0.000
10mm 6.708
12mm 8.269
16mm 7.090
Steel
20mm 0.000
25mm 0.000
32mm 0.000
40mm 0.000
22.067
UPGRADATION OF GADCHIROLI-ASTHI ROAD TO TWO LANE WITH PAVED
Project: SHOULDERS/FOUR LANE CONFIGRATION ( PACKAGED NO- NH/IAHE/02) IN THE STATE OF
MAHARASTRA ON ENGINEERING, PROCURMENT & CONSTRUCTION (EPC) BASIS
CONTRACT DESIGN CHAINAGE - CH. 123+100 TO CH. 151+020
Client: National Highway ( P.W.D. ) Maharastra
Independent
Consultant: LNM Infra Projects Pvt. Ltd. Bhopal

EPC
Contractor: A.G. Construction Pvt. Ltd.
Structure 135+695 Box culvert
CH- 135+695 ( 1x4x3 ) ( 18.36 Mtr )
Side Type of Structure Nos Length Width Depth Grade Total
Box Excavation 1 19.36 5.7 3.168 349.595
PCC PCC 1 18.360 5.600 0.150 M15 15.422 15.422
PCC 4 8.490 0.800 0.150 M15 4.075
1st Lift Toe Wall 4 8.290 0.600 0.200 M15 3.979 18.002
2nd Lift 4 8.290 0.300 1.000 M15 9.948
PCC Courtain Wall 1 19.650 1.850 0.150 M15 5.453
1st Lift 1 19.450 1.650 0.550 M15 17.651
2nd Lift 1 19.450 0.750 0.750 M15 10.941 42.359
Down Stream
3rd Lift 1 19.450 0.750 0.450 M15 6.564
4th Lift 1 19.450 0.450 0.200 M15 1.751
PCC Courtain Wall 1 19.650 1.500 0.150 M15 4.421
1st Lift 1 19.450 1.300 0.800 M15 20.228
32.964
2nd Lift UP Stream 1 19.450 0.450 0.750 M15 6.564
3rd Lift 1 19.450 0.200 0.450 M15 1.751
108.748
Raft 1 18.360 5.300 0.450 M35 43.789
Raft 1 5.300 0.850 0.850 M35 3.829 48.969
Sheir Key
1 5.300 0.300 0.850 M35 1.352
Side 1 18.360 0.150 0.150 M35 0.207
Bottom Haunch 0.413
Wall 1 18.360 0.150 0.150 M35 0.207
Outer Wall 2 18.360 0.350 3.000 M35 38.556 38.556
Side 1 18.360 0.150 0.150 M35 0.207
Top Haunch 0.413
Wall 1 18.360 0.150 0.150 M35 0.207
Slab 1 18.360 4.700 0.450 M35 38.831 38.831
Fly Wall 4 3.500 0.400 1.500 M35 8.400
10.920
Fly Wall 4 3.500 0.400 0.450 M35 2.520
138.103

M-15 108.748
Concrete
M-35 138.103

8mm 0.000
10mm 3.818
12mm 5.808
16mm 2.980
Steel
20mm 0.000
25mm 0.000
32mm 0.000
40mm 0.000
Total 12.606