BOQ Toll Plaza
BOQ Toll Plaza
BOQ Toll Plaza
PART B Toll Structure, Admin Building, Canopy, Roofing, WIM, Static Weigh Bridge, Porta Cabin & Toll Booth
I) Civil Work
Structural Designing 400,000.00
Estimate for Canopy / OverHead Admin Building - 2 Structures 6,466,465.00
Construction of Island / Bull Nose 1,581,418.00
Estimate for Static Weigh Bridge Civil Work - 02 nos 327,225.00
Estimate for Weigh in Motion Civil Work - 06 nos 218,320.00
Toll Booth (3.5 x 8 x 8) - 06 no's (Rs. 70,000/- x 6) 660,000.00
Porta Cabin (8 x 8 x 8.5) – 02 no’s for Static Weight Bridge (Rs. 95,000/- x 2) 190,000.00
Structural Steel for Toll Booth Protection - 06 nos 33,000.00
Signages for Toll Plazas 2,462,480.00
Subtotal for Civil Work 12,338,908.00
1 Lane Equipments
Industrial Grade Toll Lane Controller comprising of:
1) Industrial grade motherboard with based CPU, Intel Core i3 Processor, 4GB RAM,
500GB HDD
2) Lane controller circuits, I/O Cards, Relay Cards
3) SMPS Power supply for CPU and circuits
4) MCB's, Terminal Blocks and Electrical Fuses
1.1 6
5) 4 Port Ethernet switch
6) Mouse (Dell/Logitech)
7) IP Rated Cabinet
8) Multiport cards
9) Integrated Metal Detector
10) 18.5" Monitor
1.5 Automatic Barrier Gate ( 0.9 Sec as Opening & Closing Cycle) 6
1.7 User Fare Display with mounting pole 2-Lines,12-Character, Letter Height-60 mm 6
1.13 Violation Alarm System with foot switch syrine and Light 6
1.15 License Plate Image Capture Camera (2 MP) Night Vision with Poles 6
1.16 Incident Capture Camera System (2 MP) Night Vision with Poles 6
Toll Plaza Server with rack minimum configuration as Octa Core ,2.1GHZ,1*16GB
2.1 MEMORY, OPEN BAY,2.5 " Hot Swap 1.2 TB x 3 SAS/ SATA,Integrated RAID 0,1, 10, 1
5, (RAID 530-8i PCIe) . Administrator,19.5' monitor keyboard mouse
Network Video Recorder (NVR) - 32 CHANNEL (No DUAL LAN PORT & RAID
2.5 1
configuration) WITH 4 TB HD + 4 TB HD
IP PTZ Camera for Plaza Surviellance with 10 Meter Pole with mounting accessories,
2.7 2
Cable routing up to pole, earthing and lightning arrester
2.11 10KVA UPS for Plaza server and plaza systems with 1 Hour backup 1
3.1 RFID ETC transceiver (entry) over lane entrance (AVI) with Antena 6
Computer Operating System with License Version approved From NHAI (6 Lane + 8
4.1 16
Plaza Computer + 2 Way bridge computer)
Network rack 32U for server and plaza networking (32u-600x800 with fan-2, full tray-2,
5.3 1
power strip 10 socket-1, cable manager-2 & mounting hardware)
6.6 Desktop system for static weigh bridge (Intel Core i3, 4GB RAM, 500GB HDD) 2
7 Services
1) Civil Work
1 Exacvation in soft soil upto depth of 1.5 m including all lead and lift upto 50m. CUM 2.00 20.00 4.00 1.50 240.00 500.00 120,000.00
Murum/ Boulder filling upto depth of 600 mm and as per drawings and specifications/
2 CUM 10.00 1.80 4.00 0.60 43.20 400.00 17,280.00
as directed by site incharge.
Laying 100 mm thick Cast in situ/Ready Mix cement concrete in M15 as levelling
coarse. The Cement Mortar 1:3 plaster is considered for rendering uneven and
3 CUM 8.00 1.60 3.60 0.10 4.61 2,500.00 11,520.00
honeycombed surface, only.
(On Labour Basis, Ready Mix Cement Concrete M-15 to be supplied by Client.)
Laying 100 mm thick Cast in situ/Ready Mix cement concrete in M15 as levelling
coarse for porta cabin. The Cement Mortar 1:3 plaster is considered for rendering
4 CUM 3.00 3.00 3.00 0.10 2.70 2,500.00 6,750.00
uneven and honeycombed surface, only.
(On Labour Basis, Ready Mix Cement Concrete M-15 to be supplied by Client.)
Laying in situ /Ready Mix cement concrete M-30 of trap / granite /quartzite/ gneiss
metal for R.C.C. work in foundations of raft including bailing out water, Steel
centering formwork, laying/pumping cover blocks, compaction and curing
5 CUM 8.00 1.50 3.50 0.30 12.60 2,500.00 31,500.00
roughening the surface if special finish is to be provided (Excluding reinforcement
and structural steel) etc. complete.
(On Labour Basis, Ready Mix Cement Concrete M-30 to be supplied by Client.)
Laying in situ /Ready Mix cement concrete M-30 of trap / granite /quartzite/ gneiss
metal for R.C.C. End wall including bailing out water, Steel centering formwork,
laying/pumping cover blocks, compaction and curing roughening the surface if
6 CUM 4.00 0.40 3.50 0.50 2.80 2,500.00 7,000.00
special finish is to be provided (Excluding reinforcement and structural steel) etc.
complete.
(On Labour Basis, Ready Mix Cement Concrete M-30 to be supplied by Client.)
Fixing in position TMT - FE - 500 bar reinforcement of various diameters for raft
Foundation as per detailed designs, drawings and schedules. including cutting,
7 bending, hooking the bars, binding with wires or tack welding and supporting as MT 5.00 7,000.00 35,000.00
required complete.
(On Labour Basis, TMT - FE - 500 Bar to be supplied by Client.)
Murum/ Boulder filling upto depth of 600 mm and as per drawings and specifications/
1 CUM 4.00 6.00 3.50 0.30 25.20 400.00 10,080.00
as directed by site incharge.
Laying 100 mm thick Cast in situ/Ready Mix cement concrete in M15 below kerb
stone. The Cement Mortar 1:3 plaster is considered for rendering uneven and
2 CUM 4.00 6.00 3.50 0.10 8.40 2,500.00 21,000.00
honeycombed surface, only.
(On Labour Basis, Ready Mix Cement Concrete M-15 to be supplied by Client.)
Laying in situ /Ready Mix cement concrete M-30 of trap / granite /quartzite/ gneiss
metal for R.C.C. End wall including bailing out water, Steel centering formwork,
laying/pumping cover blocks, compaction and curing roughening the surface if
3 CUM 4.00 6.00 3.50 0.23 18.90 2,500.00 47,250.00
special finish is to be provided (Excluding reinforcement and structural steel) etc.
complete.
(On Labour Basis, Ready Mix Cement Concrete M-30 to be supplied by Client.)
Fixing in position TMT - FE - 500 bar reinforcement of various diameters for raft
Foundation as per detailed designs, drawings and schedules. including cutting,
4 bending, hooking the bars, binding with wires or tack welding and supporting as MT 2.84 7,000.00 19,845.00
required complete.
(On Labour Basis, TMT - FE - 500 Bar to be supplied by Client.)
Total 327,225.00
Estimate for Weigh In Motion Civil Work
Laying Plain cement concrete under foundation, mechanically mixed and compacted,
including centering and shuttering all complete as per drawings and Technical
3 2.083 Cu.M 2,500.00 5,207.00
specifications and as directed by the Engineer-in-charge. PCC Grade M15
(On Labour Basis, Ready Mix Cement Concrete M-15 to be supplied by Client.)
Reinforced cement concrete grade in box structure including centering & shuttering but
excluding the cost of reinforcement, all complete as per drawings and Technical
4 13.425 Cu.M 2,500.00 33,563.00
Specifications Sections 1500 & 1700. RCC Grade M20
(On Labour Basis, Ready Mix Cement Concrete M-20 to be supplied by Client.)
Fitting and placing HYSD bar Fe500 reinforcement complete as per drawings and
5 Technical specifications and as directed by the Engineer-in-charge. 0.180 MT 7,000.00 1,260.00
(On Labour Basis, TMT - FE - 500 Bar to be supplied by Client.)
218,320.00
Measurement Sheet for Constructuion of toll plaza
MEASUREMENT SHEET
4 Excavation for Installation of cables 2 Cum 70.000 0.250 0.250 8.750 550.00 4,812.50
5 Installation of HDPE pipe for passing of cables 4 Rmt 70.000 280.000 600.00 168,000.00
RCC Foundations of size 0.5X0.5mX0.5m for IT Equipments
6 18 Nos 18.000 2,300.00 41,400.00
and Boom Barriers
3 Staircase
Column 1
Straight portion SC2 ISMC150 2 2.2
2 3.7
2 5.2
Inclined portion 1 ISA 50X50X6 30 1.17
2 ISA 50X50X6 15 0.9
Trades
71.6 3007.2
63 1285.2
63 1436.4
16.4 669.12
3.8 387.6
8.2 44.116 6.25 0.9604 7.2104
8.2 8.036
2.685219
32.8 531.36 36 7.29 43.29
8.2 22.14 6.579514
16.4 541.2 21.2521 9 30.2521
16.4 212.216 5.500191
16.4 646.488 32.95908 9 41.95908
16.4 1672.964 6.477583
8.2 177.12
60
16.4 72.16
16.4 121.36 0.81 0.5625 1.3725
16.4 170.56 1.171537
3.8 133.38
3.8 51.3
11189.92
6 60.72
4766.52
total weight 15956.44
Joints 2000
total weight 17956.44
35912.88
Canopy Abstract
BILL OF QUANTITY
Sr
ITEMS OF WORK UNIT Quantity RATE IN RS AMOUNT IN RS
No
Excavation for foundation in soft soil of all types soft murum, including removing the
1
excavated material up to a distance of 50 m. (Lift upto 1.5 m.)
Laying in situ /Ready Mix cement concrete M-30 of trap / granite /quartzite/ gneiss metal
for R.C.C. work in foundations including bailing out water, Steel centering formwork,
2 laying/pumping cover blocks, compaction and curing roughening the surface if special
finish is to be provided (Excluding reinforcement and structural steel) etc. complete.
(On Labour Basis, Ready Mix Cement Concrete M-30 to be supplied by Client.)
Laying Cast in situ/Ready Mix cement concrete in M15 including steel centering,
formwork, laying/pumping, compacting, roughening them if special finish is to be provided,
finishing uneven and honeycombed surface and curing etc. complete. Newly laid concrete
3
shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be
allowed.)
(On Labour Basis, Ready Mix Cement Concrete M-15 to be supplied by Client.)
Fixing in position TMT - FE - 500 bar reinforcement of various diameters for R.C.C. pile
caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas,
lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules.
4
including cutting, bending, hooking the bars, binding with wires or tack welding and
supporting as required complete.
(On Labour Basis, TMT - FE - 500 Bar to be supplied by Client.)
Providing, fabricating and erecting at site of work the tubular steel structure (shed) as per
standard design and specifications having various spans in between trusses and in multiples
of standard length of bays as specified as per standard specifications, inclusive of cost of
steel tubular trusses, tubular columns purlins, tie runners, foundation bolts, base plates, nuts
5
and bolts, welding wherever required etc. as per detailed drawing inclusive of one coat of
anticorrosive paint and two coats of oil painting of approved quality and shade etc.
complete.
Spec. No. : As directed by Engineer-in-charge.
External Walls: Providing and fixing 75 mm thick Rapicon wall panel with GI chanel at top
7 SQFT 4800.000 17.00 81,600.00
and bottom, Jointing, Finishing Etc
Internal Walls: Providing and fixing 50 mm thick Rapicon wall panel with GI chanel at top
8 SQFT 3800.000 150.00 570,000.00
and bottom, Jointing, Finishing Etc
False celing: Providing and Fixing false ceiling by using 4 mm thick ocenic tile with 24 mm
9 SQFT 1500.000 90.00 135,000.00
thick white coated grid
Mezzine flooring: Provide and fixing 18 mm thick everest make fibre cement board with 8
10 SQFT 1500.000 125.00 187,500.00
mm thick Hilton ( 2'X2' Grid)
Canopy Abstract
BILL OF QUANTITY
Sr
ITEMS OF WORK UNIT Quantity RATE IN RS AMOUNT IN RS
No
11 Providing and fixing Two track alluminium windows with 3.5 mm plain glass 1.2MX1.2M Nos 10.000 4,850.00 48,500.00
12 Providing and fixing 30 mm flush door with GI frame 0.810X 2.03 M Nos 10.000 6,800.00 68,000.00
13 Plumbing work for Sink / Toilet in Admin Building Nos 2.000 42,500.00 85,000.00
14 Canopy for Staircase to be provided for Rain Protection Nos 2.000 85,000.00 170,000.00
15 Perforated Steel Plate to be provided to railing all along the walkway Nos 2.000 25,000.00 50,000.00
Canopy Abstract
Sr.
ITEMS OF WORK NO LENGTH BREADTH DEPTH QTY UNIT
No.
Canopies
Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and
1 spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical
Means
Providing and laying in situ /Ready Mix cement concrete M-30 of trap / granite /quartzite/ gneiss metal for R.C.C. work in foundations like raft, strip foundations, grillage and footings of R.C.C.
columns and steel stanchions etc. including bailing out water, Steel centering formwork, laying/pumping cover blocks, compaction and curing roughening the surface if special finish is to be provided
2
(Excluding reinforcement and structural steel) etc. complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer)
etc. complete. With fine aggregate (Natural Sand / Crushed sand VSI Grade finely washed etc).
Canopies-column
Footing F1 10 X 2.00 X 2.00 X 0.60 24.00 Cum
Footing F2 2 X 2.98 X 2.00 X 0.60 7.15 Cum
Footing F3 8 X 2.48 X 1.50 X 0.45 13.39 Cum
Pedstal - 1 10 X 0.65 X 0.65 X 1.75 7.39 Cum
Pedstal - 2 2 X 1.65 X 0.65 X 1.75 3.75 Cum
Pedstal - 3 8 X 1.50 X 0.55 X 1.20 7.92 Cum
TOTAL = 63.61 Cum
Providing and laying Cast in situ/Ready Mix cement concrete in M15 of trap/ granite/quartzite/gneiss metal for steps including steel centering, formwork, laying/pumping, compacting, roughening
them if special finish is to be provided, finishing uneven and honeycombed surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honeycombed
3
surface, only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be allowed.),with fully automatic micro processor based PLC with SCADA enabled
reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Natural Sand / Crushed sand VSI Grade finely washed etc)
Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters for R.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels
4
pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete.
Canopies
Footing 63.6 X 100 = 6.36 Mt
(Steel Quantity in Kg/Cum)
TOTAL = 6.36 Mt
Providing, fabricating and erecting at site of work the tubular steel structure (shed) as per standard design and specifications having various spans in between trusses and in multiples of standard
length of bays as specified as per standard specifications, inclusive of cost of steel tubular trusses, tubular columns purlins, tie runners, foundation bolts, base plates, nuts and bolts, welding wherever
5
required etc. as per detailed drawing inclusive of one coat of anticorrosive paint and two coats of oil painting of approved quality and shade etc. complete.
Spec. No. : As directed by Engineer-in-charge.
TOTAL = 40.00 MT
1 Signages board for per lane denoting the Vehicle class Category. 6.00 9.75 2.60 25.35 152.10 1,250.00 190,125.00 2.16 11935 5525.463
2 Signages Board - Toll Plaza 1 KM ahead 2.00 5.07 2.09 10.60 21.19 1,250.00 26,490.75 1.2024381 5260 4374.4456
3 Signages Board - Toll Plaza 500 Metres Ahead 2.00 5.07 2.09 10.60 21.19 1,250.00 26,490.75 0.92781 6180 6660.8465
4 Signages Board - Displaying Toll Rates 4.00 13.75 14.75 202.81 811.25 1,250.00 1,014,062.50 18.330168 91875 5012.2291
5 Signages Board - Displaying Toll Rates - Median 2.00 9.00 8.50 76.50 153.00 1,250.00 191,250.00 6.565632 34330 5228.7426
6 Signages Board - Displaying Exemption and Notification Details 4.00 13.75 14.75 202.81 811.25 1,250.00 1,014,062.50 11.163 56610 5071.2174
20.00 2,462,481.50
Say: 2,462,480.00
Sr. No. Description Code Section No.s Length
1 Ground Floor
A Column @toll plaza SC1 2 ISMC 300 7 6
B Long Beams For Floor 7 ISHB 300 2 10.2
C Short Beams for Floor 7 ISHB 300 4 5.7
D Long Rafter Ground floor 8 ISMC 150 4 10.2
E Short Rafter 9 ISMC 50X50X5 16 6
F Grid 2 & 3 Columns Bracing 6 ISA 90X90X6 2 2.69
G Grid 2 & 3 Columns Bracing 6 ISA 90X90X6 1 0.98
2 First Floor
A Column @first floor SC1 2 ISMC 300 6 2.7
B Staircase Column SC4 ISA 90X90X6 1 3.05
C Bracing long front side 10 2 ISA90X90X6 6 5.5
D Bracing long front side 10 2 ISA90X90X6 2 6.47
E Bracing Short Side 10 2 ISA90X90X6 4 6.57
F Purlin First floor 14 ISMC 150 10 10.201
G Beams First floor 11 ISA 90X90X6 3 7.2
3 Truss
A Top Chord 12 ISA 90X90X6 6 3.736
B Bottom Chord 11 ISA 90X90X6 3 7.2
C Webs 13 ISA 50X50X5 3 7.988
3 Staircase Columns
A Staircase A
Column SC2 ISMC 150 2 1.918
Bracings
Horizontal Tie Between Columns 3 2 ISA 50X50X5 1 0.98
Horizontal Tie Between Columns 2 ISA 50X50X5 1 0.98
Cross Bracings 1 ISA 50X50X5 4 1.206
B Staircase B
Column SC2 ISMC 150 2 3.418
Bracings
Horizontal Tie Between Columns 3 2 ISA 50X50X5 3 0.98
Horizontal Tie Between Columns 2 ISA 50X50X5 1 0.98
Cross Bracings 1 ISA 50X50X5 8 1.206
C Staircase C
Column SC2 ISMC 150 2 4.918
Bracings
Horizontal Tie Between Columns 3 2 ISA 50X50X5 2 0.98
Horizontal Tie Between Columns 2 ISA 50X50X5 4 0.98
Cross Bracings 1 ISA 50X50X5 12 1.206
4 Staircase
Column 1
Straight portion SC2 ISMC150 2 2.2
2 3.7
2 5.2
Inclined portion 1 ISA 50X50X6 30 1.17
2 ISA 50X50X6 15 0.9
Trades
71.6 3007.2
63 1285.2
63 1436.4 No.s 3 or 4 ?
16.4 669.12
3.8 364.8
8.2 44.116 6.25 0.9604 7.2104
8.2 8.036
2.6852188
71.6 1159.92 36 7.29 43.29
8.2 25.01 6.5795137
16.4 541.2 21.2521 9 30.2521
16.4 212.216 5.5001909
16.4 430.992 32.959081 9 41.959081
16.4 1672.964 6.477583
8.2 177.12
8.2 183.8112
8.2 177.12
3.8 91.0632
60
16.4 62.9104
7.6 7.448
3.8 3.724
3.8 18.3312
16.4 112.1104
7.6 22.344
3.8 3.724
3.8 36.6624
16.4 161.3104
7.6 14.896
3.8 14.896
3.8 54.9936
16.4 0
16.4 72.16
16.4 121.36 0.81 0.5625 1.3725
16.4 170.56 1.1715375
3.8 133.38
3.8 51.3
12548.3988
6 60.72
4766.52
total weight 17314.9188
Joints 2000
total weight 19314.9188
38629.8376
Doubts