PO Number: 7400017648 PO Date: 25-FEB-20

Vendor Address; Ultratech Cement Limited, Bill To Address; CCECC-KEC JV


New Delhi, Plot no-16 23 24,, 110034, India GST No. DMRC Project DC-01,Mundka Casting Yard, Near Mundka
07AAACL6442L1ZC Railway Station Rani Khera, West Delhi, 110041, India
Your Vendor No. with us- 1010013543 GST No. 07AAEAC4141K1ZV

Kind Attention: Purchase Group: CIV-DMRC JV


Telephone: +919911031252 Email: Approval No.: 0000061865

Quotation Ref. No.:5100077246 Project No. CV059-01

INCO Terms: DMRC-DC01 Terms of Payment : Due in 45 Days - Vendor

Our Reference: 1001078922 Dear Sir/Madam,


We are pleased to place our detailed order on you for supply of the following items as per the terms and conditions mentioned below.

Line No Item Code & HSN / UOM Quantity Unit


Description SAC Price
Tax rate
00010 READY-MIX-CONCRETE-M15 3824 /18.00% M3 3448 4220.00
%
READY-MIX-CONCRETE-M15
00020 READY-MIX-CONCRETE-M35 3824 /18.00% M3 5995 4765.00
READY-MIX-CONCRETE-M35
00030 READY-MIX-CONCRETE-M35 3824 /18.00% M3 95218 4760.00
READY-MIX-CONCRETE-M35
Item text
Pile
00040 READY-MIX-CONCRETE-M40 3824 /18.00% M3 17235 5045.00
READY-MIX-CONCRETE-M40
00050 READY-MIX-CONCRETE-M40 3824 /18.00% M3 130 5045.00
READY-MIX-CONCRETE-M40
Item text
Precast
00060 READY-MIX-CONCRETE-M45 3824 /18.00% M3 11533 5015.00
Ready Mix Concrete-RMC-M45
Item text
Precast
00070 RMC - M50 - CONCRETE 3824 /18.00% M3 21319 5695.00
RMC - M50 - CONCRETE
00080 RMC - M50 - CONCRETE 3824 /18.00% M3 29470 5695.00
RMC - M50 - CONCRETE
Item text
Precast
00090 READY-MIX-CONCRETE-M55 3824 /18.00% M3 25715 5865.00
Ready Mix Concrete-RMC-M55
00100 READY-MIX-CONCRETE-M55 3824 /18.00% M3 43847 5865.00
Ready Mix Concrete-RMC-M55
Item text
Precast
00110 READY-MIX-CONCRETE-M60 3824 /18.00% M3 405 5970.00
Ready Mix Concrete-RMC-M60
PO Number: 7400017648 PO Date: 25-FEB-20
Total Amount 1,341,441,170.00
CGST-9% 120,729,705.30
SGST-9% 120,729,705.30
Grand Total 1,58,29,00,580.60
Amount In Words:
For, CCECC – KEC JV
Authorized Signatory

Terms of Payment :
PAYMENT
Rs. 2 Cr. Paid as an advance against equivalent amount of BG valid till completion of Project. The same shall be recovered of Rs. 8,50,000 Per Month once in a
95% through 45 Days Interest Free Credit. Bill shall be submitted fortnightly.
5% retention is applicable and shall be released after 75 Days from the date of Supply Invoice.
Rs. 15 Cr. Amount shall be provided as a credit by M/s. UTCL for the supply of Concrete & Cement against Bank Guarantee Rs. 11 Crore to be provided by M/s
The Bank Guarantee shall be issued by the KEC on behalf of CCECC – KEC JV and the same shall be deemed to be issued by the CCECC – KEC JV for the pu
Order. It is hereby clarified and agreed between the Parties that KEC shall not raise any defense or objection in encashing the Bank Guarantee by UTCL in futur
the CCECC – KEC JV and that they are individually not liable for the default in making the payment and the amount should be recovered from CCECC – KEC JV
Shipping Instruction :
Type of Work: Supply of concrete through two 60 cum/hour dedicated plants (1 by M/s CCECC-KEC JV, 1 by UTCL) installed at Mundka casting yard and supp
Keshopur to North Pitampura, Delhi.
Reference LOI RPG/KEC/CIVIL/DC-01/19-20/UC-01 Dt 14.01.2020
The scope of works includes the following:
Rates are considering UltraTech OPC 53 cement. In case slag cement for pile is required, the same shall be issued free of cost by M/s CCECC-KEC (2% wasta
rate would be arrived by excluding cement price.
Rates are based are as per mix design submitted by CCECC-KEC JV Table - A
Quantity - The minimum captive quantity considered is 2,54,315 lacs cum in 24 months period. The average quantity per month is taken as 10,600 cum cum/mo
Supply Duration - 24 months from the date of first supply from the site plant. Scope of M/s UltraTech Cement Ltd -
RMC Plants at Project site which include (Refer Table B),
Batching plant and equipment (One 60 cum/Hr plants in proper working condition) as per Table B without civil works but includes inhouse Calibration as per Proj
Silos- 2nos of cement 100 MT, 2nos of Flyash 80 MT and Micro silica silo of 10 MT Commissioning of plant and equipment
Plant shall not be older than 10 years
One 250 KVA backup DG set with panel and electrical works for UTCL plant One 250 KVA backup DG set for CCECC-KEC plant
One RO plant of 10,000 lts/hr capacity
Two Chilling plant of 60ton capacity with 20,000 liters insulated tank with two 180 KVA DG backup One Weigh bridge of 80 MT capacity
Regular maintenance and upkeep of both batching Plants Quality Control of concrete
PO Number: 7400017648 PO Date: 25-FEB-20
Initial one-time mix design from 3rd party lab.
Water for making concrete and other operations related to plant. Cement Bag Cutting & Loading into Silo.
Power of batching plant and chiller plant (grid power at one point with meter to be provided by M/s CCECC-KEC on chargeable basis @ Rs 10/unit) All raw mate
cement, sand, aggregates, flyash, admixture, micro silica
Two JCB with operator & diesel Transportation of concrete
Pollution consent (M/s CCECC-KEC shall provide necessary documents) All Environmental compliance relevant to Batching Plant.
Provision for Betonwash
General Arrangement drawing of Batching Plant from OEM shall be submitted by M/s. UTCL Housekeeping, Safety, Stores management & Preservation of mate
M/s. UTCL
All kind of testing from NABL approved third party laboratory including Concrete Cube, Concrete Ingredients, mix design as per site requirement for First Time a
the sources of materials. Cement manufacturer test certificate shall be provided by M/s. UTCL.
The rates includes for all the Safety & Environmental requirement shall be followed by M/s. UTCL as per DMRC manual / requirement.. Accommodation for labo
Scope of M/s CCECC-KEC International
Leveled and barricaded land (around 2 acre) for batching plant operation and for stacking of material
Suitable road accessible both at construction site for TM and at batching plant site for raw material trucks to ensure the free and safe passage of all TMs and raw
One 60 cum plant with 3 cement 100 MT, 1 flyash 80 MT silos, conveyor, blower, dust collector etc. erected and commissioned Panel and electrical works for DG
KEC JV for CCECC-KEC JV plant
Grid power connection for M/s CCECC-KEC JV plant Grid power on chargeable basis @ Rs 10/unit
All required lab equipment
All civil work for the RMC plant works as per Table C shall be in the scope of M/s CCECC-KEC JV. Pumping of concrete
Removal of foundations / civil structures and levelling of site after project completion Suitable land fill area to dispose the concrete/ water waste
All outside lab testing – 1st time in UTCL scope, thereafter in M/s CCECC –KEC JV Adequate area lighting for plant, lab and other operations
2 stage sedimentation tanks to be made for B/p at casting yard. Wheel washing facilities is must at casting yard and stations.
Aggregate bins to be covered and sprayer should be provided.
Rainwater harvesting system to be deploy at temporary sheds at CY /Station. RATES OF CONCRETE:
The above rates are as per mix design given by M/s CCECC-KEC JV and mentioned in Table A. In case of any change in mix design due to any reason, the imp
actual as mentioned the basic price of Raw Material & Cement through Debit-Credit note including GST Impact. Any other raw material required to be added to
by M/s CCECC-KEC JV free of cost.
• Slurry required for pumping shall be in M/s CCECC-KEC JV scope
• Ice shall be in M/s CCECC-KEC JV scope including feeding.
• The above prices excludes pumping, placing, vibration, curing of concrete.
• Pumping of concrete shall be in scope of M/s CCECC-KEC JV.
CONTRACT PRICE
The contract price is a fixed rate Contract as per Price Escalation Clause mentioned below. The unit prices & amount shall be as per the attached Bill of Quantiti
loading & unloading, Transit Insurance charges are included in the unit rates FOR at Site and supply to our DMRC project Keshopura North Pitampura, Delhi.
CONCRETE TRANSPORTATION:
Total 384 TM months have been taken for the project. For additional deployment of Transit Mixers, extra shall be charged for TM rental @ Rs 1.25 lacs/TM/ mon
TM, the same shall be returned to M/s CCECC-KEC on same basis. The average lead distance of one way between the project site & RMC plant shall not be ex
Contractors Representative shall approve the deployment/demobilisation of TM.
Any permission related to TM movement shall be arranged by M/s CCECC-KEC JV. Supplies shall be made as per traffic permissions available. PRICE ESCAL
Quoted rates are including cement (supplies in bags) and the cement rates are valid till 31.12.2020.
Rate for sand, aggregates, Flyash, admixture and micro silica are Fixed for 1 year from the date of LOI. After one year, rates to be mutually decided by M/s CCE
based on prevalent rate at the end of 1st year and future possibilities and shall be fixed for 2nd year.
Underloading shall be paid extra at actual after 7 days from the date of applicable. Prices shall be finalized based on Joint negotiation by M/s. CCECC-KEC JV &
Purchase GST Invoice shall be submitted by M/s. UTCL at the time of Claiming. However, in any case it shall be not paid more than @ Rs. 200/MT for Sand & R
due to implementation of underload excluding GST. Royalty &Local body taxes are included in
PO Number: 7400017648 PO Date: 25-FEB-20
the cost.
Any statutory hike/ new taxes on raw materials and RMC shall be reimbursed extra on actual basis. In case of Banned of Source due to Government Notification
guidelines for the region then price shall be discussed & mutually agreed upon.
IDLE CHARGES:
The project payable sunk cost in the event of foreclose is Rs 16 per cum for the balance volume left out of 2,54,315 cum.
The project payable fix cost in the event of foreclose is Rs 230 per cum for volume of 10,600 cum/month. Minimum Guaranteed Quantity shall be averaged out
year. Idle charges @ Rs 230 per cum will have to be paid for deficit Quantity on account of CCECC-KEC JV (excluding TM rental which shall be as per TM mon
above). The same shall be reimbursed @ Rs 230/cum for excess quantity.
In case of any event leading to construction ban in Delhi by Govt or any statutory body like NGT, Supreme Court etc. fixed cost of Rs 44 lacs /month or part ther
shall be payable to UTCL. This clause is applicable for 24 hours working. In case of shutdown due to NGT for partial hrs, then it should be discussed & mutually
works come to a standstill for any reason whatsoever, fixed charges for each month of idle time shall be payable..
DELIVERY:
1st Batching Plant taking over within 2 Days from the date of LOI
2nd Batching Plant to be reached on or before 31.01.2020 to meet the Key dates. General Arrangement drawing of Batching Plant from OEM shall be submitted
hours from the date of receipt of LOI.
RO plant shall be commissioned by 25th March 2020. Silos shall be operational by 10th March 20.
All the Plant and Equipment shall be operational by 1oth March’20
MEASUREMENT:
The quantity will be billed as per the batch sheet generated by the computerized batching plant duly calibrated jointly by M/s. UTCL & M/s. CCECC-KEC JV. Cer
JV’s Contractors Representative.
UTCL will be paid actual quantity of work executed and approved by CCECC-KEC JV. The prices mentioned are for the delivery of finished product and complet
approved by CCECC-KEC JV. Quantity of work will be measured as per Delivery challan for the material delivered to Site
ENCL:
1) ANNEXURE –I (FOR RATES OF CONCRETE) , ANNEXURE II (FOR BASIC PRICE OF RAW MATERIAL), TABLE A (MIX DESIGN), TABLE B (BATCHING
& TABLE C (ALL CIVIL WORKS)
2) TECHNICAL SPECIFICATION OF DMRC - Addendum - Vol 4 - Technical specifications (REVISION-1 - JULY 2019)
3) SAFETY NORMS OF DMRC - Addendum – Vol 2 - EHS(May-2019 - 1, 2 and 3)
4) KEC EHS AGGREEMENT: with following changes:
Point 3.11 – Group insurance- UTCL workers shall be covered under ESI
Point 10 – Penalty – UTCL shall follow HSE standards of KEC, however penalty shall not be leviable
Point 11- UTCL shall follow Acts/Rules related to RMC production, UTCL is not covered under Building and Other Construction Workers act and any labour cess
M/s KEC scope
EHS Annexure A-1 - UTCL shall follow related to batching plant operations EHS Annexure B-1 – Not applicable to UTCL scope of works
5) P&M LIST AS UTCL AGREEMENT WITH KEC.
Pl refer the following Link for documents: https://drive.google.com/drive/folders/1iQ0IWbdIwfb8grGXaswHBRFPOtZMC6P4 LIQUIDATED DAMAGES
In the event of any shortfall in the delivery of material from the agreed schedule, the liquidated damages for such delays shall be imposed on the UTCL at the ra
order value, shall be applicable on balance undelivered portion and shall be deducted from the payments.
The cumulative penalty shall, however, be limited to 5% of the contract value. LD shall be applicable after Grace Period of 7 Days.
Terms of Delivery :
TAXES & DUTIES & ITS ESCALATION:
The prices are exclusive of GST @ 18% and the same shall be reimbursed to you on provision of tax invoices. All other taxes, duties as per your quote and agre
price.
Any variation in taxes/duties due to statutory revisions during the period of the Contract shall be reimbursed by us against documentary evidence. UTCL shall ab
comply with it.
In case of denial of tax credit to us due to non-payment of GST or non-submission of GST return or incorrect details submitted by you, the corresponding amoun
recovered from UTCL.
VARIATION IN SCOPE:
During the time of execution our site Management may vary the quantities from PO as per the situation during the tenure of the contract for which the rates will b
price mentioned in BOQ. For all the new items rates will be agreed upon by both of us before starting such works.
PO Number: 7400017648 PO Date: 25-FEB-20
LABOUR LAWS :
You shall comply Labour laws of the state and central governments and other Statutory Authorities for the operation of your scope of Works. CCECC-KEC JV wi
payment / damages that may result on account of non-compliance of the above by you. You will maintain all records that are required to be maintained under La
to time. You shall cover your workmen under PF Act and the necessary documentary proof for the same shall be submitted to CCECC-KEC JV site office. Labou
engaged at site shall have to be arranged by you..
Compliance documents shall be provided by M/s UTCL to M/s KEC promptly so that payment of M/s KEC from DMRC is not affected.
SAFETY:
The UTCL shall strictly adhere to the safety measures/procedures/rules as mentioned in the CCECC-KEC JV SHE [Safety. Health, Environment] manual and DM
agrees to deploy his manpower/labours for all the training related to Safety, Environmental, Health and others necessary for safe working in the Project without a
costs towards the training of UTCLs manpower/ labour shall be borne by CCECC-KEC JV. All the Safety & Environmental requirement shall be followed by M/s.
manual and requirement. However maximum penalty of Rs 2,000 shall be leviable per incident.
QUALITY OF WORK:
UTCL shall be responsible to execute the job with high degree of quality as per the specification and in line with the latest code of practice as per the instruction
Concrete Strength Quality & durability criteria shall comply to project specification & as per approved Inspection & Testing Plan.
RETENTION:
5% retention is applicable and the same shall be released after 75 days from the date of Invoice.
DEFECT LIABILTY PERIOD:
Concrete Strength Quality & durability criteria shall comply to project specification & as per approved Inspection & Testing Plan.
SUPPLIERS OBLIGATION:
a. Neither under this PO, nor any right or obligation hereunder may be assigned, in whole by the UTCL without the prior written permission of CCECC-KEC JV.
b. All the Confidential Information or data supplied by CCECC-KEC JV to the UTCL in connection with this PO shall remain the property of CCECC-KEC JV. If th
the CCECC-KEC JV is disclosed by the UTCL to an unauthorized third party, the UTCL agrees to indemnify CCECC-KEC JV from and against the same.
c. Indemnify CCECC-KEC JV from and against all actions, suits, all damages and proceedings by the third party for the acts/omissions of the UTCL. In case of a
equipment, the same shall be settled by UTCL including all cost / expenses pertaining to the incident.
d. In case of any break-down / strike or any other reason M/s. UTCL is guaranteed to supply Concrete through their nearest plant (Currently Gurgaon/DC02) as
the same rate. In case of failing to supply RMC by M/s. UTCL, M/s. CCECCKEC JV is authorized to procure RMC at the prevailing market rate at the cost & risk
applicable other than preventive maintenance of the plant of 48 Hours in a month with prior approval of Project Manager / P&M..
e. UTCL shall execute the work strictly as per instruction of CCECC-KEC JV authorized Engineers by JV’s Contractors Representative and as per good enginee
f. UTCL shall provide his own quality and supervision Engineers, Labour, equipment’s, tools & tackles in adequate numbers to complete the work as per the give
the schedule, you have to mobilize required manpower/ Technical person to make up the lost time at no extra cost. Plant / Equipment, tools and tackles will not b
work without the prior permission of CCECC-KEC JV..
g. UTCL shall make your own arrangement for Transportation of you Labour and Staff.
h. UTC shall abide by & maintain all quality formats and documentation as issued by CCECC-KEC JV Engineers as per project quality requirement as well as CC
Formats & Norms
i. UTCL shall arrange own Security for your men, material & plants.
j.UTCL shall be responsible for compliance of statutory requirements such as Workmen compensation, Provident Fund, ESIC, Insurance of its manpower, labou
labour laws etc. and law of land applicable. UTCL shall provide proof of such compliances to designated officer of CCECC- KEC.
FORCE MAJEURE
Any delay or impediment in the fulfillment of its obligation by either party by reason of force majeure, such as acts of nature like floods, earthquake, epidemics, a
shall constitute excusable delay and no compensation or idle time payment shall be made for such delays, but extension of time for such period shall be granted
examining the merit of the case for such each individual happenings.
RISK PURCHASE:
In case of any break-down / strike or any other reasons M/s. UTCL agrees to supply the guaranteed concrete quantity through their nearest plant (Currently Gurg
approved mix design and at the same rate.
In the event of failure to timely supply the RMC by M/s. UTCL, M/s. CCECC KEC JV reserves the right to procure RMC from other vendors at the risk and cost o
PO Number: 7400017648 PO Date: 25-FEB-20
Preventive maintenance of the plant of 48 Hours in a month shall be carried out such that the Site progress is not affected. The monthly maintainence shall be ca
of Project Manager / P&M/ Contractors Representative. The preventive maintainence does not construe breakdown under the paragraph above.
SEVERABILITY
If any of the terms and conditions of this PO shall become unenforceable for any cause or reason whatsoever, the ensuing lack of enforceability shall not affect t
and in such event the parties hereto shall endeavor to substitute forthwith such other enforceable provision as will most closely correspond to the legal and econ
terms and condition.
NOTICES
All notices, communication, statement, request or correspondence under this PO shall be in writing and in English Language. All notices be served, either by han
the same by registered post, courier addressed to either party at the address stated herein or such change and in providing the services of such notice, it shall b
same has been received by the notified person.
ARBITRATION & JURISDICTION
a) In the event of any dispute arising or difference out of the performance or the interpretation of this PO, the Parties hereby agree to make every effort to reach
b) Any dispute, controversy or claim arising out of or relating to this PO or the breach, termination or invalidity thereof shall be settled by reference of dispute to S
appointed by mutual consent of both the parties. The Arbitration shall be conducted in accordance with the Arbitration and Conciliation Act, 1996 including amen
place of arbitration shall be Mumbai, India. The language used in arbitral proceedings shall be English. The award shall be binding on both the parties.
c) This PO shall be construed in accordance with and governed by the laws of India. The parties hereby expressly submit themselves to exclusive jurisdiction of
d) Non-resolution of dispute shall not be a reason for stoppage of UTCL’s works.
SUBCONTRACTING:
UTCL shall not sub-contract or assign the whole of their obligations under this PO without the CCECC-KEC JV's prior written consent and such consent if given,
whatsoever relieve the UTCL from any liability or obligation under this PO. UTCL will engage subcontractor for labour/TM/JCB etc. complying KEC/Client require
ALTERATION(S)/AMENDMENT(S):
Any alteration(s)/amendment(s) requested by CCECC-KEC JV or by UTCL after this PO has been signed shall become effective only by mutual consent and con
the parties.
TERMINATION OF CONTRACT:
If, your progress is consistently found to be below the accepted schedule; or if the quality of work being executed by you falls below the expected standards laid
the risk purchase shall be done by CCECC-KEC JV as per above-said risk purchase clause.
In case M/s KEC winds up DMRC DC01 project, M/s KEC shall make the payment of TM rental for 1 month, plant & plant accessories depreciation for 2 months
months and erection and dismantling at actuals to be discussed and mutually agreed upon considering the notice from M/s CCECC-KEC JV for 1 month to UTC
Other statutory conditions:
UTCL should make arrangement of following documents for Gate pass of his workmen who will be coming for work at CCECC-KEC JV site. Aadhar Card and Ba
bank transfer of wages as per The Payment of Wages Act
ESIC number, if allotted earlier. It is applicable at site which is under the purview of ESIC
Screening Form (To be filled by Site CCECC-KEC), Photograph, Education certificates & Employment Certificates – if any. PF & Gratuity Nomination form to be
The UTCL shall observe all the provisions of relevant/applicable labour laws at all the time and shall also indemnify CCECC-KEC against any claim arising out o
applicable labour laws by Govt. Authority or any workmen of UTCL which may be made under statutory Act/Rules applicable to site.
The UTCL shall maintain all records, registers and file returns to the appropriate authorities as mandated under the applicable Acts and Rules and a copy of the
shall submit to Site CCECC-KEC-IR/Admin as per statutory compliances.
The UTCL shall remain present along with all the statutory records as and when required for Internal/third party audit/Govt. Inspection.
The UTCL should engage workmen so that they can able to read & understand various safety signboards, labels and instructions written in English/Hindi/ Local l
locations within site/client’s premises.
The UTCL should engage such workmen those possess minimum physical standard to carry out the assigned work.
Employment of Child labour is strictly prohibited and is a penal offence as per the Child labour (Prohibition & Regulation) Act 1986. The UTCL shall not employ a
18 years & his age should be between 19 to 50 years.
No female labour allow to work from 7PM to 6 AM
UTCL should ensure the following point and submit monthly compliance to enable timely submission to client along with RA bill
PO Number: 7400017648 PO Date: 25-FEB-20
Wage payment to workers to be made on or before 7th / 10th of every month (whichever is applicable) irrespective of the payment not made by the CCECC- KE
Salary / Wages of all manpower engaged shall be done through Bank Payment only. Labour welfare fund twice in a year
All statutory Returns to be filled and submitted in its due date. Copy to be handed over to Site CCECC-KEC-IR/Admin in time.
After clearance of Monthly Invoice from the user dept., the following documents to be submitted to Site CCECC-KEC-IR/Admin for the verification of statutory co
month for IR clearance.
Photocopy of Attendance Register, Wage Register, Advance/Penalty Register, OT register, Leave Register etc., acknowledgement copy of bank transfer. Labou
slip (June & December)
Copy of Full & Final settlement of workmen, if any
Original gate pass in case of absconding/left of labour to enable to submit it to client for cancellation
Appropriate action will be taken by Site IR/Admin/Commercial in case of any non-compliance observed
To ensure compliance of all the instructions / amendments given by Site CCECC-KEC-IR from time to time
To maintain the higher productivity, The UTCL shall ensure that his workmen will report at least 15 minutes prior to shift time at workplace.
Please return the duplicate copy of this PO duly signed and stamped by the authorized signatory as a token of your acceptance for our reference and records.
Page 1 of 7
Ship To Address; CCECC-KEC JV
DMRC Project DC-01,Mundka Casting Yard, Near Mundka
Railway Station Rani Khera, West Delhi, 110041, India
GST No. 07AAEAC4141K1ZV

Contact Person : Navnath WaghmareContact No.:Email: waghmaren@kecrpg.com

Currency: INR

ons mentioned below.

Delivery Amount
Date
15-02-20 14,550,560.00

15-02-20 28,566,175.00

15-02-20 453,237,680.00

15-02-20 86,950,575.00

15-02-20 655,850.00

15-02-20 57,837,995.00

15-02-20 121,411,705.00

15-02-20 167,831,650.00

15-02-20 150,818,475.00

15-02-20 257,162,655.00

15-02-20 2,417,850.00
Page 2 of 7

e recovered of Rs. 8,50,000 Per Month once in a month from one invoice.

k Guarantee Rs. 11 Crore to be provided by M/s. KEC


to be issued by the CCECC – KEC JV for the purpose of this Purchase
encashing the Bank Guarantee by UTCL in future if there is any default by
ount should be recovered from CCECC – KEC JV.

UTCL) installed at Mundka casting yard and supply to our DMRC project

ued free of cost by M/s CCECC-KEC (2% wastage shall be allowed), the

antity per month is taken as 10,600 cum cum/month


d -

orks but includes inhouse Calibration as per Project requirement.


equipment

CECC-KEC plant

ridge of 80 MT capacity
Page 3 of 7

on chargeable basis @ Rs 10/unit) All raw materials i.e. UltraTech OPC 53

t to Batching Plant.

fety, Stores management & Preservation of material is sole responsibility of

x design as per site requirement for First Time and in the event of change in

manual / requirement.. Accommodation for labour near to site.

ure the free and safe passage of all TMs and raw material vehicles
commissioned Panel and electrical works for DG to be done by CCECC-

concrete
pose the concrete/ water waste
lant, lab and other operations
and stations.

change in mix design due to any reason, the impact shall be adjusted on
Any other raw material required to be added to concrete shall be provided

mount shall be as per the attached Bill of Quantities. All transportation,


RC project Keshopura North Pitampura, Delhi.

e charged for TM rental @ Rs 1.25 lacs/TM/ month. For less deployment of


ween the project site & RMC plant shall not be exceeding 13 km. The JV’s

per traffic permissions available. PRICE ESCALATION

e year, rates to be mutually decided by M/s CCECC-KEC JV and UTCL

d on Joint negotiation by M/s. CCECC-KEC JV & M/s. UTCL. Copy of


e not paid more than @ Rs. 200/MT for Sand & Rs. 275/MT for Aggregate
Page 4 of 7

Banned of Source due to Government Notification / Supreme Court

315 cum.
mum Guaranteed Quantity shall be averaged out and settled at the end of one
cluding TM rental which shall be as per TM months clause mentioned

rt etc. fixed cost of Rs 44 lacs /month or part thereof (subject to 16 TMs)


artial hrs, then it should be discussed & mutually agreed upon. In case the
e..

g of Batching Plant from OEM shall be submitted by M/s. UTCL within 24

ointly by M/s. UTCL & M/s. CCECC-KEC JV. Certification shall be done by

e for the delivery of finished product and completed work as required and
red to Site

TABLE A (MIX DESIGN), TABLE B (BATCHING PLANT & EQUIPMENTS)

Y 2019)

er Construction Workers act and any labour cess shall be in

to UTCL scope of works

POtZMC6P4 LIQUIDATED DAMAGES


h delays shall be imposed on the UTCL at the rate of 0.5% per week of

e Period of 7 Days.

All other taxes, duties as per your quote and agreement are inclusive in your

us against documentary evidence. UTCL shall abide by the GST laws and

tails submitted by you, the corresponding amount incl INT and penalty will be

he tenure of the contract for which the rates will be operated strictly as per
s.
Page 5 of 7

tion of your scope of Works. CCECC-KEC JV will be indemnified against


ords that are required to be maintained under Labour laws enforce from time
e submitted to CCECC-KEC JV site office. Labour license for the workers

DMRC is not affected.

HE [Safety. Health, Environment] manual and DMRC manual. The UTCL


ecessary for safe working in the Project without any extra cost to us. All
ronmental requirement shall be followed by M/s. UTCL as per DMRC

the latest code of practice as per the instruction of the Project manager.
& Testing Plan.

& Testing Plan.

he prior written permission of CCECC-KEC JV.


hall remain the property of CCECC-KEC JV. If the confidential information of
ECC-KEC JV from and against the same.
for the acts/omissions of the UTCL. In case of accident by UTCL

heir nearest plant (Currently Gurgaon/DC02) as per approved mix design at


MC at the prevailing market rate at the cost & risk of M/s. UTCL This is
Manager / P&M..
tractors Representative and as per good engineering practice.
ate numbers to complete the work as per the given schedule. Any failure in
ost. Plant / Equipment, tools and tackles will not be removed from the site of

s as per project quality requirement as well as CCECC-KEC JV standard

nt Fund, ESIC, Insurance of its manpower, labour and equipment etc., other
of CCECC- KEC.

ts of nature like floods, earthquake, epidemics, act of God, and acts of war
xtension of time for such period shall be granted by CCECC-KEC JV after

uantity through their nearest plant (Currently Gurgaon/DC02 Plants) as per

e RMC from other vendors at the risk and cost of M/s. UTCL.
Page 6 of 7
ot affected. The monthly maintainence shall be carried out with prior approval
own under the paragraph above.

he ensuing lack of enforceability shall not affect the other provisions hereof,
ill most closely correspond to the legal and economic contents of the said

sh Language. All notices be served, either by hand delivery or by send by


n providing the services of such notice, it shall be sufficient to show that the

rties hereby agree to make every effort to reach an amicable settlement.


ereof shall be settled by reference of dispute to Sole Arbitrator to be
ration and Conciliation Act, 1996 including amendments upto date. The
rd shall be binding on both the parties.
sly submit themselves to exclusive jurisdiction of the courts in Mumbai, India.

s prior written consent and such consent if given, shall not in any way
abour/TM/JCB etc. complying KEC/Client requirement & specification.

become effective only by mutual consent and confirmation in writing by both

d by you falls below the expected standards laid down by us, in such cases,

ant & plant accessories depreciation for 2 months , manpower cost for 2
e from M/s CCECC-KEC JV for 1 month to UTCL

ork at CCECC-KEC JV site. Aadhar Card and Bank account number for the

es – if any. PF & Gratuity Nomination form to be filled up at time of joining


nify CCECC-KEC against any claim arising out of non- compliance of
es applicable to site.
the applicable Acts and Rules and a copy of the same with acknowledgment

audit/Govt. Inspection.
s and instructions written in English/Hindi/ Local language at various

work.
gulation) Act 1986. The UTCL shall not employ any person below the age of

ong with RA bill


Page 7 of 7
ve of the payment not made by the CCECC- KEC.
in a year
Admin in time.
KEC-IR/Admin for the verification of statutory compliance of the previous

acknowledgement copy of bank transfer. Labour welfare fund deposition

r to shift time at workplace.


our acceptance for our reference and records.