Approved Working
Esimate
S.No Description of Work Cost in Estimate Cost in Excess
Lakhs
Lakhs
Sunkidi sump
Construction of compoundwall
1 (350m) at Sunkidi Sump in Adilabad 20.00 20.00 0.00
Sub division in Adilabad Distirct
Construction of Pump House
2 (17mX7m) at Sunkidi Sump in 37.00 37.00 0.00
Adilabad Sub division in Adilabad
Distirct
Construction of 2500KL Clear water
3 Sump at Sunkidi in Adilabad Sub 176.00 310.00 134.00
division in Adilabad Distirct
Pumpsets - 150HP Capacity (2+1) for
4 Sunkidi Sump in Adilabad Sub 120.00 120.00 0.00
division in Adilabad Distirct
Construction of Watchmen Quarter
5 at Sunkidi Sump in Adilabad Sub 17.00 25.00 8.00
division in Adilabad Distirct
Provision for Construction of
Pipeline for inlet & outlet
6 connections for sunkidi pump house 50.00 50.00 0.00
in Adilabad Sub division in Adilabad
Distirct
Construction of Retaining wall at
7 Sunkidi Sump in Adilabad Sub 0.00 90.00 90.00
division in Adilabad Distirct
Construction of Development
8 Works at Sunkidi Sump in Adilabad 0.00 15.00 15.00
Sub division in Adilabad Distirct
420.00 667.00 247.00
PMC Adilabad
Construction of 75 12.5Kg/cm2
2 pipeline at Anderbandh and 2 BHK, 0.00 75.00 75.00
Hostels and Institutions 15000 mtr
under Adilabad sub diviision
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Less
100
245
400
745
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Less
253
0.00
998.00