Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12

PLOT PLAN

33.93
2
A

B
CHAIR BAR 1 CHAIR BAR 2
N=0.00
(UTM N=1588857.2976)

(UTM E=542959.9463)
CHAIR BAR DETAILS

E=0.00
SYMBOLOGY

C C

12/16/2022
D D

NOTES

E E

PLAN PLAN
2

SHOP DRAWING
F REFERENCE DRAWINGS F

ENGINEER-OF-RECORD:

(SIGNATURE & SEAL)

2 2

G G

REV. DESCRIPTION DATE DRAWN CHECKED APPROVED

SECTION SECTION REVISIONS

FOUNDATION DETAIL @ PERMEATE & CIP TANK PROJECT :


EASTBAY WATER TREATMENT PLANT.
50 MLD (PHASE 1).
SCALE 1:50 M Scale :
As indicated
TITLE DRAWING :

H GENERAL CIVIL WORKS H


REFERENCE :
MNL FOUNDATION DETAIL @ PERMEATE & CIP TANK
SIZE
ORIGINAL DRAWING No JV. MNL-WTP- -06-SDR-00001 SHEET 1

A3 DRAWING No MWC. WTP-2020-0389-5000- S560 OF 1


0 100 200 300 mm © FIRST AGUA JOINT VENTURE
THIS DOCUMENT IS PROPERTY OF FA-JV AND CAN NOT BE DUPLICATED, PROCESSED OR DISCLOSED TO THIRD PARTIES FOR ANY USE OTHER THAN THIS PROJECT AND THE PURPOSE FOR WHICH IT
IS ISSUED FOR WITHOUT THE WRITTEN CONSENT OF FIRST AGUA-JV.

DIN A3 ( 420 x 297 )


1 2 3 4 5 6 7 8 9 10 11 12

You might also like