MoRTH File No - DNT 215840 - Amendment To SCH-H - 19!12!2022 (SCH H Relaxation For Precast Girders)
MoRTH File No - DNT 215840 - Amendment To SCH-H - 19!12!2022 (SCH H Relaxation For Precast Girders)
(A~a)-
l SE,S&R(R)
For DG (RD)& SS
Page1 of 10
Copy to:
1. l
All RO ELOs of MoRTH and all Technical Officers at MoRTH Headquarter.
2. PPSto 6ecretary (RTH), PPSto DG (RD) ass, PSto ASaFA, PSto all ADGs
Page 2 of 10
Annexure -I
Amendments to Standard EPCAgreement for National Highways and Centrally Sponsored
Road works proposed to be implemented on Engineering procurement and Construction
(EPC) mode of Contract vide Ministry's letter no. RW/NH-37010/4/2010-EAP(Printing)
VoL-IV dated 05.03.2019.
B.2-New
Underpasses/Overpasses
(ii) Super-structure: On [**] (ii) Super-structure: (ii) Super-structure:
completion of the
superstructure In all Payment shall be Payment shall be made on pro-rata
respects including wearing made on pro-rata basis on completion of a stage i.e.
coat, bearings, expansion basis on completion completion of super-structure of at
joints, hand rails, crash least one span in all respects as
Page 3 of 10
barriers, road signs of a stage i.e, specified in the column of "Stage
&markings, test on completion of of Payment" in this sub-clause
completion etc. cc mplete super-structure of at excluding any payment made in
in all respect. least one span in all pursuance to here in under:
Wearing Coat (a) i case respects as specified If precast girders/segments are
In the column of used, on casting of all such girders
of Overpass- wearin~ coat
including expansion points "Stage of Payment" and segments for at least one span
complete in all respe cts as in this and on submission of Indemnity
specified and (b) in ase of sub-clause. Bond by the Contractor, 40% of
underpass- rigid pavement the actual cost of such precast
including drainage f cility girders/segments determined
complete in all respe cts as based on SoR prevalent on the
specified as specifie . Base date within 30 days of
submission of the bill therefor. In
case the Contract Price is lower/
higher than the Estimated Project
Cost as per RFP, then the SOR
rates shall be reduced/ increased in
the same proportion accordingly.
Balance payment shall be after
erection of / launching of these
elements as per stage payment
stipulations
Page 4 of 10
1.3.3 Major Bridge works, ROB/RUBand Structures.
Procedure for estimating the value of Major Bridge works, ROB/RUB and
Structures shall be as stated in table 1.3.3:
Table 1.3.3
Stage of Payment Weightage Payment Procedure Amended Payment Procedure
A.l- Widening and
repairs of Major Bridges
(iii) Superstructure [* *] (iii) Super-structure: (iii) Super-structure:
(including bearings) Payment shall be Payment shall be made on pro-
made rata basis on completion of a
on pro-rata basis on stage i.e. completion of super-
completion of a stage structure including bearings of
i.e. completion of at least one span in all respects
super-structure as specified excluding any
including bearings of payment made in pursuance to
at least one span in all here in under:
respects as specified. If precast girders/ segments are
used, on casting of all such
girders and segments for at least
one span and on submission of
Indemnity Bond by the
Contractor, 40% of the actual
cost of such precast
girders/segments determined
based on SoR prevalent on the
Base date within 30 days of
submission of the bill therefor.
In case the Contract Price is
lower/ higher than the
Estimated Project Cost as per
RFP, then the SOR rates shall
be reduced/ increased in the
same proportion accordingly.
Balance payment shall be after
erection of / launching of these
elements as per stage payment
stipulations
Page 5 of 10
girders and segments for at least
one span and on submission of
Indemnity Bond by the
Contractor, 40% of the actual
cost of such precast
girders/segments determined
based on SoR prevalent on the
Base date within 30 days of
submission of the bill therefor.
In case the Contract Price is
lower! higher than the
Estimated Project Cost as per
RFP, then the SOR rates shall
be reduced/ increased in the
same proportion accordingly.
Balance payment shall be after
erection of / launching of these
elements as per stage payment
stipulations.
B.1 -Widening and
repairs of
(a) ROB II
(b) RUB
(iii) Super-structure [**] (iii) Super-structure: (iii) Super-structure:
(including bearings)
Payment shall be Payment shall be made on pro-
made rata basis on completion of a
on pro-rata basis on stage i.e. completion of super-
completion of a stage structure including bearings of
i.e. completion of at least one span in all respects
super-structure as specified excluding any
including bearings of payment made in pursuance to
at least one span in all here in under:
respects as specified. If precast girders/segments are
used, on casting of all such
girders and segments for at least
one span and on submission of
Indemnity Bond by the
Contractor, 40% of the actual
cost of such precast
Ii girders/segments determined
based on SoR prevalent on the
Base date within 30 days of
submission of the bill therefor.
In case the Contract Price is
Iower/ higher than the
Estimated Project Cost as per
RFP, then the SOR rates shall
be reduced/ increased in the
same proportion accordingly.
Balance payment shall be after
erection of / launching of these
elements as per stage payment
stipulations
Page 6 of 10
Ii;
B.2 -New
(a) ROB
(b) RUB
(iii) Super-structure [**] (iii) Super-structure: (iii) Super-structure:
(including bearings)
Payment shall be Payment shall be made on pro-
made rata basis on completion of a
on pro-rata basis on stage i.e. completion of super-
completion of a stage structure including bearings of
i.e. completion of at least one span in all respects
super-structure as specified excluding any
including bearings of payment made in pursuance to
at least one span in all here in under:
respects as specified. If precast girders/segments are
used, on casting of all such
girders and segments for at least
one span and on submission of
Indemnity Bond by the
Contractor, 40% of the actual
cost of such precast
girders/segments determined
based on SoR prevalent on the
Base date within 30 days of
submission of the bill therefor.
In case the Contract Price is
lower/ higher than the
Estimated Project Cost as per
RFP, then the SOR rates shall
be reduced/ increased in the
same proportion accordingly.
Balance payment shall be after
erection of / launching of these
elements as per stage payment
stipulations
• "4
Page7 of 10
girders/segments determined
based on SoR prevalent on the
~I
Base date within 30 days of
submission of the bill therefor.
In case the Contract Price is
lower/ higher than the
Estimated Project Cost as per
RFP,then the SORrates shall be
reduced/ increased in the same
proportion accordingly.
Balance payment shall be after
erection of / launching of these
elements as per stage payment
stipulations
Page 8 of 10
(vii) Approaches [**] (vii) Approaches: (vii) Approaches:
(including Retaining
walls/Reinforced Earth Payments shall be Payments shall be made on
wall, stone pitching and made on completion of completion of both approaches
both approaches including stone pitching,
protection works)
including stone protection works, etc. complete
pitching, protection In all respects as specified
works, etc. complete in excluding any payment made in
all respects as pursuance to here in under:
specified. If Reinforced Earth Wall IS
used with Facia Panels/Blocks,
on casting of all the Facia
Panels/Blocks of all approaches
and on submission oflndemnity
Bond by the Contractor, 40% of
the actual cost of such precast
girders/segments determined
based on SoR prevalent on the
Base date within 30 days of
submission of the bill therefor.
In case the Contract Price is
lower! higher than the
Estimated Project Cost as per
RFP, then the SOR rates shall
be reduced/ increased in the
same proportion accordingly.
Balance payment shall be after
erection of / launching of these
elements as per stage payment
stipulations
Page 9 of 10
based on SoR prevalent on the
Base date within 30 days of
submission of the bill therefor.
In case the Contract Price is
lower/ higher than the
Estimated Project Cost as per
RFP, then the SOR rates shall
be reduced/ increased in the
same proportion accordingly.
Balance payment shall be after
erection of / launching of these
elements as per stage payment
stipulations
(vii) Approaches [**J (vii) Approaches: (vii) Approaches:
(including Retainir g
walls/Reinforced :E arth Payments shall be Payments shall be made on
wall, stone pitchir ~ and made on completion of completion of both approaches
both approaches including stone pitching,
protection works)
including stone protection works, etc. complete
pitching, protection In all respects as specified
works, etc. complete in excluding any payment made in
all respects as pursuance to here in under:
:)1
specified. If Reinforced Earth Wall is
Ii
used with Facia Panels/Blocks,
on casting of all the Facia
Panels/Blocks of all approaches
and on submission ofIndemnity
Bond by the Contractor, 40% of
the actual cost of such precast
girders/segments determined
based on SoR prevalent on the
Base date within 30 days of
submission of the bill therefor.
In case the Contract Price is
lower/ higher than the
Estimated Project Cost as per
RFP, then the SOR rates shall
be reduced/ increased in the
same proportion accordingly.
Balance payment shall be after
erection of / launching of these
elements as per stage payment
stipulations
*****
Page 10 of 10