About BIM

BIM is an acronym for Building Information Modeling or Building Information Management. It is a highly collaborative process that allows
architects, engineers, real estate developers, contractors, manufacturers, and other construction professionals to plan, design, and
construct a structure or building within one 3D model
BIM Softwares
• Autodesk Revit • Mircostation

• Autodesk BIM 360 • ArchiCAD

• Vectorworks Architect

• Tekla Structures

• Graphisoft ARCHICAD
benefits of BIM
Improve Onsite Collaboration Model-Based Cost Estimation Visualize Projects in
and Communication Preconstruction

Digital BIM models allow for sharing, Many AEC firms are realizing that By using BIM, you can plan and
collaborating, and versioning that including estimators earlier in the visualize the entire project during
paper drawing sets don’t. With cloud- planning stage allows for more preconstruction, before the shovel hits
based tools such as Autodesk’s BIM effective construction cost estimation, the ground. Space-use simulations and
360, BIM collaboration can seamlessly which has led to the growth of model- 3D visualizations allow clients to
occur across all disciplines within the based cost estimating (also known as experience what the space will look
project. The BIM 360 ecosystem allows 5D BIM). like offering the ability to make
teams to share project models and changes before construction start.
coordinate planning, ensuring all Having a greater overview from the
design stakeholders have insight into beginning minimizes expensive and
the project. time-consuming changes later.
Better Coordination and Mitigate Risk and Reduce Cost Improved
Clash Detection Scheduling/Sequencing

Reduce the amount of rework needed Better overview of the project before In the same way that many of these
on any given job by avoiding clashes. starting allows for more prefabrication benefits save money, they save time by
With BIM, you have the opportunity to and reduces waste on unused reducing the time of project cycles and
plan it right before you build onsite. materials. Prefabricated elements can eliminating construction schedule
You can avoid last-minute changes and be easily bolted in place rather than setbacks. BIM allows design and
unforeseen issues by enabling easy created on-site. Labor costs spent on documentation to be done at the same
reviewing and commenting across documentation work and time, and for documentation to be
multiple disciplines. miscommunications are reduced. easily changed to adapt to new
Many companies are using BIM and information such as site conditions.
construction technology to reduce
costs and mitigate risk.
example of BIM
Museum Of The Future, Dubai
Once complete, Dubai’s Museum of the Future will take shape in a form so futuristic that its designers had to ensure it was
actually possible to implement. Working with Bur Happold engineering services and BAM International construction,
Architecture firm Killa Design designed a dazzling combination of art, engineering, and construction.

The firm created immersive visualizations


using BIM software that allowed
collaborators to “walk through” the entire
museum and check each element. This
collaborative process helped the team
achieve LEED
a presentation by

Rajkaran Singh (29/20) Samarth Rana (29/20)