TAMPAK DEPAN TAMPAK BELAKANG

1 2
1 : 50 1 : 50

10/18/2019 11:27:12 PM
No. Description Date

KALASAN ELEVASI
Project number 106

Type 86/114
Date
Drawn by
September 2019
Suhendar MBAA
A101
Checked by Checker Scale 1 : 50
TAMPAK SAMPING KIRI
2
1 : 100

TAMPAK SAMPING KANAN


1
1 : 100

10/18/2019 11:28:08 PM
No. Description Date

KALASAN ELEVASI 2
Project number 106

Type 86/114
Date
Drawn by
September 2019
Author
A102
Checked by Checker Scale 1 : 100
1 1 1 1
A105 A104 A105 A104

6007
6013
3508 2499
3506 2507

6000
5600

8000
7600
TAMAN

TERAS
-0.050
2000

3000
KAMAR TIDUR
+0.000
DAPUR
1 DN 1

2000

2000

18501
1 1 KM/WC
DN
2000

A106 A106

18100
18502
KM/WC
18102

A106 A106
-0.850
UP
DN
4000

3000

3000
3000

Kamar tidur Utama KAMAR TIDUR


R TAMU GARASI
+0.000 -850
2 2
2 2 A106 A106
A106 A106

1500
1500

TERAS
BALKON
-50.
DN

5500
5500

4000
4000

CARPORT
-950

3250 3250
3250 3250
6500
6500
LANTAI DASAR LANTAI DUA
1 2 1 1
1 : 110 1 1 1 : 110 A105 A104
A105 A104

10/18/2019 11:28:19 PM
No. Description Date

KALASAN DENAH
Project number 106

Type 86/114
Date
Drawn by
September 2019
Suhendar MBAA
A103
Checked by Checker Scale 1 : 110
1 2 4 5 6 7
1 2
A106 A106
3 Genteng flat beton
TOPPING
Rangka Baja Ringan
8300

RING LT DUA
6700 Risplank GRC

6400 6400
Plafond Gypsum

KAMAR TIDUR

KM/WC
3350

LANTAI DUA
3400

3000 3000
Plaong GRC B1 15 25

B1 15 25

KAMAR TIDUR

GARASI

LANTAI DASAR CARPOrt


0

PONDASI
-850

POT 1
1
1 : 70
2425 4000 3000 1600 3825

14850

1 2 1
4 2
5 6 7
A106 A106

10/18/2019 11:28:31 PM
No. Description Date

KALASAN POT MEMANJANG 1


Project number 106

Type 86/114
Date
Drawn by
September 2019
Suhendar MBAA
A104
Checked by Checker Scale 1 : 70
7 6 5 2
4 1
2 1
A106 A106

Genteng Flat Beton


3
TOPPING
Ragka atap Baja Ringan 8300

RB 15/20

RING LT DUA
6700

6400
6400

Plafond gypsum

Rangka Atap Baja Ringan

K tidur Utama
Balkon

3300

LANTAI DUA
3400
B1 15 25

Ruang Keluarga
Teras

-100 KM /wc
0 -100
-850
LANTAI DASAR
0
Sloof 15 /25
KM LEVEL
-750
PONDASI
-850

3825 1600 3000 4000 2425

Footing 70 70 30

7 6 5 4 2 1

2 1
POT 2 A106 A106
1
1 : 70

10/18/2019 11:28:42 PM
No. Description Date

KALASAN POT MEMANJANG 2


Project number 106

Type 86/114
Date
Drawn by
September 2019
Author
A105
Checked by Checker Scale 1 : 70
1 D C B A
A105 1
A104
1 1
A104 A105
A B C D
TOPPING
8300 Genteng Flat Beton

Rangka Baja ringan


Rangka ATap Baja ringan
Dak Talang

RB 15/20
Dak Talang RING LT DUA
6700

RING LT DUA 6400


6700 Plaffond Gypsum

6400

PLafond Gypsum

Kamar tidur Kamar tidur Utama


3400
3400

LANTAI DUA B1 15/25


KM/ WC
3400 3350 3400

LANTAI DUA 3000


B1 15/25
3400
Plafond Gypsum

3000
3000
Plafond Gypsum

R tamu
KAMAR TIDUR 0
0 LANTAI DASAR Garasi
0
KM/ WC -850
SLF 15 /25
LANTAI DASAR
PONDASI
-850 0
Sloof 15/25 -850

Pondasi Batu Kali Pondasi Batu Kali


PONDASI
Footing 70 70 -850 Footing 70 70 30

500
1500
D C B A
A B C D 1 1
A104 A105

1 1

POT 3 A105 A104


POT 4
1 2
1 : 75 1 : 75

10/18/2019 11:28:53 PM
No. Description Date

KALASAN POT MELINTANG


Project number 106

Type 86/114
Date
Drawn by
September 2019
Author
A106
Checked by Checker Scale 1 : 75
6007
6007

6000
5600

8000
7600
2000

3000
DN
2000

DN

2000

2000
DN

KETERANGAN
4000
3000

Stop Kontak 5

3000

3000
Saklar Tunggal 4

Saklar Ganda 4
1500

Titik Lampu 12

1500
DN Lampu Dinding 0

MCB 1
5500

Meteran PLN 1

5500
4000

4000
6500 6500

LISTRIK LANTAI DASAR LISTRIK LANTAI DUA


2 1
1 : 110 1 : 110

10/18/2019 11:29:05 PM
No. Description Date

KALASAN INSTALASI LISTRIK


Project number 106

Type 86/114
Date
Drawn by
September 2019
Suhendar MBAA
A107
Checked by Checker Scale 1 : 110
6007 6007

6000
5600

8000
PIPA TEGAK 1/2 IN

7600
WT
P
PIPA TEGAK 1/2 IN

KR
KR
2000

DN 3000
2000

KR
DN

2000

2000
KR UP
KR
DN
4000
3000

3000

3000
1500

1500
DN

KR
5500

5500
1. P ( Pompa Air )
4000

2. WT ( Water Tank )

4000
3. KR ( Kran Air 1/2 " )
4. Pipa PVC 1/2"
* Jaringan air bersih dalam rumah melalui plafond

6500 6500

SANITASI AIR BERSIH SANITASI AIR BERSIH LT 2


1 2
1 : 110 1 : 110

10/18/2019 11:29:14 PM
No. Description Date

KALASAN SANITASI AIR BERSIH


Project number 106

Type 86/114
Date
Drawn by
September 2019
Author
A109
Checked by Checker Scale 1 : 110
6007 6007

6000
5600

PIPA TEGAK 3"

8000
7600
Pipa Tegak pvc 3 "

BK BK
2000

3000

DN DN
2000

2000

2000
KM/WC
UP
PIPA TEGAK 4"
DN PIPA TEGAK 4"
4000
3000

3000

3000
Kamar tidur Utama KAMAR TIDUR
1500

1500
PIPA TEGAK 3"

DN BK
BALKON
1. FD ( Floor Drain PVC
2. BK ( Bak Kontrol Uk 40 x 40 )
5500

5500
BK 3. SPT ( SepticTank )
SR
4. SR ( Sumur Resapan )
4000

4000
ST 5. Sanitasi Air kotor pvc 3"

6. Sanitasi Air Tinja pvc 4"

6500 6500

SANITASI AIR KOTOR


1
1 : 110

10/18/2019 11:29:18 PM
No. Description Date

KALASAN SANITASI AIR KOTOR


SANITASI AIR KOTOR LT 2 Project number 106
2
Type 86/114
1 : 110 Date
Drawn by
September 2019
Author
A110
Checked by Checker Scale 1 : 110
6007

18501
18100
9500

JL Candi Kalasan 1

SITEPLAN
1
1 : 150

10/18/2019 11:29:21 PM
No. Description Date

KALASAN SITE PLAN


Project number 106

Type 86/114
Date
Drawn by
September 2019
Author
A111
Checked by Checker Scale 1 : 150