Professional Documents
Culture Documents
IMB Revisi Struktur
IMB Revisi Struktur
1 2
1 : 50 1 : 50
10/18/2019 11:27:12 PM
No. Description Date
KALASAN ELEVASI
Project number 106
Type 86/114
Date
Drawn by
September 2019
Suhendar MBAA
A101
Checked by Checker Scale 1 : 50
TAMPAK SAMPING KIRI
2
1 : 100
10/18/2019 11:28:08 PM
No. Description Date
KALASAN ELEVASI 2
Project number 106
Type 86/114
Date
Drawn by
September 2019
Author
A102
Checked by Checker Scale 1 : 100
1 1 1 1
A105 A104 A105 A104
6007
6013
3508 2499
3506 2507
6000
5600
8000
7600
TAMAN
TERAS
-0.050
2000
3000
KAMAR TIDUR
+0.000
DAPUR
1 DN 1
2000
2000
18501
1 1 KM/WC
DN
2000
A106 A106
18100
18502
KM/WC
18102
A106 A106
-0.850
UP
DN
4000
3000
3000
3000
1500
1500
TERAS
BALKON
-50.
DN
5500
5500
4000
4000
CARPORT
-950
3250 3250
3250 3250
6500
6500
LANTAI DASAR LANTAI DUA
1 2 1 1
1 : 110 1 1 1 : 110 A105 A104
A105 A104
10/18/2019 11:28:19 PM
No. Description Date
KALASAN DENAH
Project number 106
Type 86/114
Date
Drawn by
September 2019
Suhendar MBAA
A103
Checked by Checker Scale 1 : 110
1 2 4 5 6 7
1 2
A106 A106
3 Genteng flat beton
TOPPING
Rangka Baja Ringan
8300
RING LT DUA
6700 Risplank GRC
6400 6400
Plafond Gypsum
KAMAR TIDUR
KM/WC
3350
LANTAI DUA
3400
3000 3000
Plaong GRC B1 15 25
B1 15 25
KAMAR TIDUR
GARASI
PONDASI
-850
POT 1
1
1 : 70
2425 4000 3000 1600 3825
14850
1 2 1
4 2
5 6 7
A106 A106
10/18/2019 11:28:31 PM
No. Description Date
Type 86/114
Date
Drawn by
September 2019
Suhendar MBAA
A104
Checked by Checker Scale 1 : 70
7 6 5 2
4 1
2 1
A106 A106
RB 15/20
RING LT DUA
6700
6400
6400
Plafond gypsum
K tidur Utama
Balkon
3300
LANTAI DUA
3400
B1 15 25
Ruang Keluarga
Teras
-100 KM /wc
0 -100
-850
LANTAI DASAR
0
Sloof 15 /25
KM LEVEL
-750
PONDASI
-850
Footing 70 70 30
7 6 5 4 2 1
2 1
POT 2 A106 A106
1
1 : 70
10/18/2019 11:28:42 PM
No. Description Date
Type 86/114
Date
Drawn by
September 2019
Author
A105
Checked by Checker Scale 1 : 70
1 D C B A
A105 1
A104
1 1
A104 A105
A B C D
TOPPING
8300 Genteng Flat Beton
RB 15/20
Dak Talang RING LT DUA
6700
6400
PLafond Gypsum
3000
3000
Plafond Gypsum
R tamu
KAMAR TIDUR 0
0 LANTAI DASAR Garasi
0
KM/ WC -850
SLF 15 /25
LANTAI DASAR
PONDASI
-850 0
Sloof 15/25 -850
500
1500
D C B A
A B C D 1 1
A104 A105
1 1
10/18/2019 11:28:53 PM
No. Description Date
Type 86/114
Date
Drawn by
September 2019
Author
A106
Checked by Checker Scale 1 : 75
6007
6007
6000
5600
8000
7600
2000
3000
DN
2000
DN
2000
2000
DN
KETERANGAN
4000
3000
Stop Kontak 5
3000
3000
Saklar Tunggal 4
Saklar Ganda 4
1500
Titik Lampu 12
1500
DN Lampu Dinding 0
MCB 1
5500
Meteran PLN 1
5500
4000
4000
6500 6500
10/18/2019 11:29:05 PM
No. Description Date
Type 86/114
Date
Drawn by
September 2019
Suhendar MBAA
A107
Checked by Checker Scale 1 : 110
6007 6007
6000
5600
8000
PIPA TEGAK 1/2 IN
7600
WT
P
PIPA TEGAK 1/2 IN
KR
KR
2000
DN 3000
2000
KR
DN
2000
2000
KR UP
KR
DN
4000
3000
3000
3000
1500
1500
DN
KR
5500
5500
1. P ( Pompa Air )
4000
2. WT ( Water Tank )
4000
3. KR ( Kran Air 1/2 " )
4. Pipa PVC 1/2"
* Jaringan air bersih dalam rumah melalui plafond
6500 6500
10/18/2019 11:29:14 PM
No. Description Date
Type 86/114
Date
Drawn by
September 2019
Author
A109
Checked by Checker Scale 1 : 110
6007 6007
6000
5600
8000
7600
Pipa Tegak pvc 3 "
BK BK
2000
3000
DN DN
2000
2000
2000
KM/WC
UP
PIPA TEGAK 4"
DN PIPA TEGAK 4"
4000
3000
3000
3000
Kamar tidur Utama KAMAR TIDUR
1500
1500
PIPA TEGAK 3"
DN BK
BALKON
1. FD ( Floor Drain PVC
2. BK ( Bak Kontrol Uk 40 x 40 )
5500
5500
BK 3. SPT ( SepticTank )
SR
4. SR ( Sumur Resapan )
4000
4000
ST 5. Sanitasi Air kotor pvc 3"
6500 6500
10/18/2019 11:29:18 PM
No. Description Date
18501
18100
9500
JL Candi Kalasan 1
SITEPLAN
1
1 : 150
10/18/2019 11:29:21 PM
No. Description Date
Type 86/114
Date
Drawn by
September 2019
Author
A111
Checked by Checker Scale 1 : 150