CHECKS BEFORE WATER SHUT OFF JOB:

1) CEMENT EVALUATION ( BEHIND PIPE)


(Ensure good hydraulic Isolation behind Casing between zones)
a. Across perforated interval
b. Zones of DPZ’s up hole
c. Casing shoe
d. Behind proposed depth of Mechanical well bore isolation between zones (CIBP, CEMENT PLUG).
e. Training on Cement log interpretation ?.
2) CASING CORROSION LOG
a. Across DPZ’s up hole (Internal & External casing condition)
b. Across CIBP setting depth .Internal & External of Casing.
c. Identify Collars ,Pipe Ovality, Casing ID (Casing wt)
3) PLT , PRODUCTION WELL TEST, MOBILE TEST UNIT
a. Prior to well entry identify Source of Water
1. Production History Water cut trends.
2. Sudden Water Development v’s Progressive Development
3. In house training for Production logging Techniques ( Temp Spinner Survey).
4) Pre WSO Well Test Water Cut trends to base line well performance.
5) Current Interpretation of So from Saturation log
6) Corrosion Log (internal external, across known up hole DPZ’s)
7) PLT’s Need to be run before wells Die surveillance “triggers”
8) Well test on wells with high water cuts.
9)Summary of Expected Source of Water, Secondary Potential Sources of water.
10) Expected Performance After WSO.
11) QA of Logs.
12) Offset Production and Injection wells production and injections rate.
13) Saturation Panel off offset wells.