HAIRUL ADELINDO

No. URAIAN VOLUME


m
2
m
2

I SURFACE Preparations
A Tank

1 Tank Slug Catcher 154.4 154.4 0


2 Vessel Suction Scruber 115.6 63.6 52
3 Vessel Discharge Scruber A 115.6 0 115.6
4 Vessel Discharge Scruber B 115.6 57.8 57.8
5 Condensat Drum 108.6 0 108.6
6 K - O Drum 108.6 0 108.6
A : 718.4 275.8 442.6
B Support

1 PipeRack B : 1263 821 442

C Pipe

1 Pipe & Acessories C : 2373.6 1429 949

Jumlah SURFACE Preparations A+B+C = 4355 2525.8 1833.6

II PRIMER Coating 4355 4225 130

III INTERMEDIATE Coating 4355 4225 130

IV FINISHING Coating 4355 4138 217

13065 12588 477