PROTECTION SCREED (BY OTHERS)

4-1 4-2 4-3 2 COATS OF MAXBOND 1211


CEMENTITIOUS MEMBRANE
FLEXATEC 1200-A01-050-064 (BLACK)
HORIZONTAL STRIP
3000 10800
EXISTING 5 SPD BLOCK 4
BLOWUP PLAN 1
EXISTING 5 SPD LEVEL 1

63.41
B 50
0

100
A A'

500

51
50 50MM

60 50
110
(STRCUTURAL GAP) CORKJOINT 47B SWELLABLE

410
300
WATER-STOP
B' FW
HIGH STRENGTH EPOXY BONDING AGENT

BLOCK 4

200
PU LIQUID APPLIED MEMBRANE
CORKJOINT 47B SWELLABLE
WATER-STOP
KEYPLAN (SCALE 1 : 100)
HIGH STRENGTH EPOXY BONDING AGENT

B 50
0 FLEXATEC 1000-A01-050 (GREY)
VERTICAL STRIP

PU LIQUID APPLIED MEMBRANE

A 50
500 A' CORKJOINT 47B SWELLABLE
WATER-STOP
60 50
110

BASEMENT 1

200
410
300

B' FW PU LIQUID APPLIED MEMBRANE

200
CORKJOINT 47B SWELLABLE
WATER-STOP
BLOWUP PLAN 1 (SCALE 1 : 25)
HIGH STRENGTH EPOXY BONDING AGENT

PROTECTION SCREED (BY OTHERS) Referenced Drawing No.:


FLEXATEC 1000-A01-050 (GREY)
1. Architect Reference dwg:
2 COATS OF MAXBOND 1211 VERTICAL STRIP 2. Structural Reference dwg:
3. WH-M&E Reference dwg:
CEMENTITIOUS MEMBRANE 4. ---
PU LIQUID APPLIED MEMBRANE FOR APPROVAL
FLEXATEC 1200-A01-050-064 (BLACK) RFA-SP3-ARC-029 DATE: 02-03-2022
CORKJOINT 47B SWELLABLE
HORIZONTAL STRIP WATER-STOP DATE RECEIVED :
SHOP DRAWING REVIEW BY :
APPROVED
Rejected and

200
LEVEL 1 BASEMENT 2 for construction
with comments
with comments, Resubmit as per
CONSULTANTS (AP)
NO
resubmission comments(RR)

400
resubmission
FLEXATEC 1000-A01-050 (GREY) required (AC)
required (AR)
63.41

ARCHITECT (ER)
HORIZONTAL STRIP Surbana Jurong Consultants Pte
51

DESIGN CONSULTANT
WITH HIGH STRENGTH EPOXY BONDING Serie + Multiply Consultants Pte
STRUCTURAL CONSULTANT
50

AGENT Mott Macdonald S'pore Pte Ltd


MEP CONSULTANT
Squire Mech Pte Ltd
ESD CONSULTANT
Surbana Jurong Consultants

FIRE STOP (BY OTHERS) LEAN CONCRETE FACADE CONSULTANT


HCCH Consulting Pte Ltd (Building Facade Group)

BLOCK 4 (BY MAIN CON)


CONCRETE WITH PENETRON
LANDSCAPE CONSULTANT
Grant Associates (S) Pte Ltd
ACOUSTIC CONSULTANT

CRYSTALLINE ADMIX Alpha Acoustic Engineering Pte

CONCRETE WITH PENETRON LIGHTING CONSULTANT


Nipek Pte Ltd
POLYETHYLENE SHEET
CRYSTALLINE ADMIX (BY MAIN CON )
SERVICE APARTMENT ID
CONSULTANT
The Ascott Limited
Our comments and corrections made on this shop drawing do not relieve the Contractor / Sub- contractor of
his contractual responsibilities.
SECTION A-A' : EXPANSION JOINT DETAIL (50mm GAP SIZE ) SECTION B-B' : EXPANSION JOINT DETAIL FROM BASEMENT 2 TO LEVEL 1_ Work shall confirm to Employer's requirements and Employer's design drawings. The Contractor is
responsible for all correctness of dimensions and details in this drawing and for the full coordination of all

AT BLOCK 4 TO EXISTING 5SPD BET. EXISTING 5SPD AND BLK 4 aspect of the work.

SCALE: NTS SCALE: NTS


NAME/SIGNATURE : DATE:
Science Park Property Trustee Pte. Ltd. as STRUCTURAL Mott Macdonald S'pore Pte Ltd MAIN WOH HUP (PRIVATE) LIMITED
REV DATE DESCRIPTION GENERAL NOTES : CLIENT
Trustee of Science Park Property Trust 1 CONSULTANT 52 BEACH ROAD CONTRACTOR
BUILDING WITH INTEGRITY PROJECT TITLE : DRAWING TITLE :
168 ROBINSON ROAD #30-01 CAPITAL TOWER #35-00, THE GATEWAY EAST, SINGAPORE 189721 217 UPPER BUKIT TIMAH ROAD, WOH HUP BUILDING
1. SUB-CONTRACTORS MUST CHECK & VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCEMENT OF WORKS.
0 02-03-22 FOR APPROVAL 2. ANY DISCREPANCIES IN THE FIGURE OR SETTING-OUTS BETWEEN CONSULTANTS AND RELATED APPROVED
SINGAPORE 068912 TEL: (65) 6293 1900 FAX: (65) 6293 1911 E-mail: mm@momttmac.sg SINGAPORE 588185 T: 63858585 F: 62723322
PROPOSED ERECTION OF A 15-STOREY BUSINESS PARK & TYPICAL EXPANSION JOINT DETAIL TO
SHOP DRAWINGS (INTERNAL & EXTERNAL) ARE TO BE REPORTED IMMEDIATELY TO THE MAIN CONTRACTOR. Surbana Jurong Consultants Pte. Ltd. MEP Squire Mech Pte Ltd HOTEL BUILDINGS WITH 2 BASEMENTS CARPARK &
3. REFER TO THE STRUCTURAL ENGINEER FOR ALL STRUCTURAL SIZES AND DIMENSIONS.
ARCHITECT
(ER) 168 JALAN BUKIT MERAH, #01-01 CONNECTION ONE CONSULTANT 1 KALLANG JUNCTION
ANCILLARY FACILITIES ON LOT 02742N MK 03 AT No. 3 SCIENCE
SLAB AND WALL BETWEEN BLK 4 & 5SPD
SINGAPORE 150168 #03-01
4. ALL SUB-CONTRACTORS MUST PROVIDE A MOCK-UP SAMPLE (FOR EACH TRADE / TYPE OF WORKS) ON SITE PARK DRIVE (QUEENSTOWN PLANNING AREA)
TEL: (65)62481288, www.surbanajurong.com SINGAPORE 339263
FOR THE MAIN CONTRACTORS / CONSULTANTS / OWNERS REPRESENTATIVES'S COMMENTS / APPROVAL
BEFORE PROCEEDING WITH THE SITE WORKS. Serie + Multiply Consultants Pte Ltd SUB
DESIGN
CONSULTANT 59 JALAN SULTAN CONTRACTOR MAP SCALE : DATE : DRAWN : SIZE : DWG NO : REV
5. UNLESS OTHERWISE STATES, COLUMN FINISHES SHALL BE IN SKIMCOAT AND PAINT. Maxbond Singapore Pte Ltd
6. FLOOR TRAP REFER TO APPROVED M&E DRAWINGS & SANITARY DRAWINGS. SINGAPORE 198979 9 Tagore Lane #03-13 9@Tagore Singapore 787472
(65) 6457 3168 f (65) 6457 3868
NTS 02-03-2022 AIVI A3 SP3_MB_A_WPF_DET--_TYP_009 0
admin@maxbond.sg
w www. maxbond.sg