Professional Documents
Culture Documents
2015 05.options (A)
2015 05.options (A)
2015 05.options (A)
16 16 May'15
EXAMINATION NO.16
CONTENTS :
1. Option <30points>
TIME SCHEDULE :
15:30 to 17:30
NOTE :
1. Check this Examination question sheets and confirm the category and grade
are proper for those which you are going to take.
3. Write your examinee's NO. onto this cover and all the answer sheets
at first. If missing, it will be considered no answer written
4. Optional question
<Option -1> to <Option -5> are optional questions.
Select and answer Three (3) questions in five questions.
If more than three (3) questions are answered, the lowest score questions
will be counted.
4 All the question sheets should be given back to the Observer after finish.
EXAMINEE'S NO.
1/18
L1 No.16 16/May/2015
Level - 1 Mechanical (HVAC )
No.
Option Option 1
Control
Panel
To Distribution
System 100mm dia. x 15m L
80mm dia. x 2m L
P P
P P
Max Water
100mm dia x 5m L
Level
Underground
Water Tank
Min Water
Level
Q1 Prepare the Bill of Quantity of valves and gauges as shown on the above < 2.5 points >
schematic diagram.
Page 頁碼 of 18
L1 No.16 16/May/2015
Level - 1 Mechanical (HVAC )
No.
Option Option 1
Q2 What is the cost pipe and fittings around the booster pump system if the < 2.5 points >
unit rate of the pipe material is USD 2.00 / kg. Fitting cost is 35% of the
pipe material cost. Refer to the attached fot pipe technical data.
Pipe Material is GALVANIZED STEEL, MEDIUM CLASS
Page 頁碼 of 18
L1 No.16 16/May/2015
Level - 1 Mechanical (HVAC)
No.
Option Option 1
Page 4 of 18
L1 No. 16 16/May/2015
Given :
Centrifugal pump,
2,100 L/min
35 m Head
PUMP CL
500 mm
v MIN WATER
LEVEL
500 mm
Q-01) What is the pump suction lift in meter ( worst condition ) ? (1.5 points)
Page 5 of 18
L1 No. 16 16/May/2015
Q-02) What is the total equivalent length (Le) of pipe, valves and fittings at the
suction side of the pump ? (2.0 points)
Q-03) Determine the friction loss at the suction side of the pump. The friction
rate for 150mm dia. pipe at a flowrate of 2,100 L/m is 250 Pa / m. (1.5 points)
hf = hf / m x Le
= 250 x 57
= 14,250 Pa
Page 6 of 18
Level - 1 Mechanical (HVAC) L1 No. 16 / 16 May 2015
No.
Option Option 2
Question 1
NC(Noise Criterion) -diagram is as below 7 point
3.What is the value of Recommended Noise Criterion for open-plan area of office?
Answer
NC 35 ~ 40
Page 7 of 18
Level - 1 Mechanical (HVAC) L1 No. 16 / 16 May 2015
No.
Option Option 2
2 or 3 2
4 to 9 1
10 or more 0
Page 8 of 18
L1 No. 16 / 16May 2015
From the Axial fan curve , make a selection of fan capacity as follows:
Please find
Answer : 13 degree
Answer : 6.0~6.5 KW
Page 9 of 18
<Option 2 - Q 2 Attached sheet>
L1 No.16 / 16 May 2015
Page 頁碼 of 18
L1 No. 16 / 16 May 2015
1. 25mm Stucco
2. 200mm lightweight concrete
3. 19mm Acoustic tile
1
2
3
given:
Formula:
1 1
U= =
1/αo + Σ L/k +1/αi Ro + Σ R +Ri
Page 12 of 18
L1 No. 16 / 16 May 2015
q= U*A*Δt
= 0.594*15*4*(36-24)
= 428 【W】
[ Attached sheet ]
Page 13 of 18
L-1 No. 16/16 May 2015
The figure below shows a typical sprinkler control valve and accessories. < 5 point >
5
2
SPRINKLER CONTROL
VALVE
To match the correct part number designation shown in the above figure.
(5) e
Page 14 of 18
L-1 No.16 /16 May 2015
a) Wet Pipe Installation :- Installation where the pipework is filled with water and
ready to discharge once the sprinkler bulb breaks
b) Dry Pipe Installation :- Installation where the pipe is always filled with air under
pressure. Air is released when the sprinkler buld breaks
and the water fills the pipe and is discharged at the
sprinkler heds
d) Deluge Installation :- Installation where the sprinkler heads has no bulb and
water is discharged simultaneously from all heads when
fire is detected and the valve is opened.
Q-3 List down the 6 cheking points for the Fire Alarm Cabling during procurement
(3 points)
Answer
1) Type of cable
2) Size of cable
3) Country of Manufacture
5) Testing Standard
Page 15 of 18
L-1 No. 16 /16 May 2015
2 List 4 items for Electrical Check included motor starter panel before fan operation.
Page 16 of 18
L-1 No.16 / 16 May 2015
① ⑨
⑧
②
③
⑦
④
⑤
[Word formation]
g.. Yoke vent pipe h. Loop vent pipe i. Stack vent pipe
① f (example) ⑥ g
② h ⑦ b
③ a ⑧ i
Page 17 of 18
L-1 No.16 / 16 May 2015
④ d ⑨ e
⑤ c
Page 18 of 18