Cleaning Area Statement
Cleaning Area Statement
ADMIN BLOCK
6 6*18=108
FRONT YARD 2.6675
IDB BUILDING 3
1 FLOOR 700.85*3=2100 (2100+990)/800
2 2
2 IDB YARD 18*55=990 3.8625
AL SAHABI HOME
1 695.37*3=2086 (2086+300)/800
BUILDING3 FLOOR
2 1
2 AL SAHABI YARD 10*30=300 2.9825
1.9875
UMAR FAROOQUE
HOSTEL 30*40*2 (FF YARD 2000/800
1 2 0
2FLOOR+YARD+TOILE DEDUCTION 34*11)
T
2.5
JIDDAH HOSTEL 3
FLOOR+YARD. (2016+1092-392)/800
1 (28*24*3)+(42*26) 2 1
DEDUCTION CUT OUT
IN 2 FLOOR 14*14*2
3.395
MYTHRY HOME + 312/800
1 26*12=312 1 0
YARD 1 FLOOR 0.39
1 HRD 2 FLOOR 392*2=784 784/800=.98 1 0
TOTAL 16 7
PRESENT ADDITIONAL
THIS TABULATION SHOWS THAT 16 CLEANING STAFFS ARE WORKING IN THE CAMPUS (FRONT OFFICE+ADMIN OFFICE+
CCWO OFFICE+HRD +ROADS+YARDS+LADIES MASJID+DUA HALL+3 HOSTELS INSIDE THE CAMPUS+ 3 HOSTELS OUTSIDE.
ADDITIONAL 7 LABOURS REQUIRED FOR CLEANING . ON SUNDAYS AND SATURDAYS ALL STAFFS WORKING TO CLEAN
AUDITORIUM HAVING AREA OF 1937M2