Item B Building Work Location

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

N

JALAN TSB 5 JALAN TSB 5

A-A

A-A
18120.00 12000.00
370.00 7100.00 4900.00
17600.00
6500.00
6000.00 6000.00 5600.00
B.14, B.15 6000.00
18

B.16
28

B.16
8.0
0

92
Ex. Guard

07
House Roof

0
T3
To remove existing Tapak

6.0

1
79
19
perimeter wall
New Cold Room

LO
44
Cadangan

5900.00

30

90
Compressor

T
Ex. Car Porch To remove existing To remove existing

07
LO
car porch roof car porch roof

T3
Area

9
structure and install structure and install

78
new steel platform for new steel platform for

LO

30
cold room compressor cold room compressor
To remove existing To remove existing Ja

T
la

LO
guard house guard house nT

11700.00
SB
5

Entrance

Ex. Drain

0
0.0
00
16
Roof
SITE PLAN
5800.00

Ex. Office 1
SCALE 1:1000
B.8

2350.00
Ex. Pantry To remove existing

dp
car porch roof
structure and install
new steel platform for
cold room compressor
To remove existing guard house

Ex. Bath
and perimeter wall

Ex.Access Void
5900.00

dp

Ex. Lobby

5160.00
13610.00
To remove existing
partition wall
dp
12000.00

B.5 B.13
New New New
Cold
Room
Cold
Room
Cold
Room
To add
1.8m width , 6m length
Ex. Office 18120.00
1 2 3 concrete ramp
6100.00

6100.00
(min. gradient 1:8)

FRONT ELEVATION A-A


43750.00

3300.00
To add RC raise floor

Ex. Office 2 150mm slab with SCALE 1:150


crusher run filling
underneath
450 dp

B.1, B.2, B.4


Jadual Pengiraan Penambahan Keluasan Lantai
B.7
Ex. Drain
To install new cold room To install new cold room To install new cold room
Nama Ruang Luas Lantai Asal Luas Lantai Baru
(Meter Persegi) (Meter Persegi)
Tingkat Bawah
New Cold Room To remove existing wall and
collapsible gate
Void Ex. Car Porch 35.40 -
4 Entrance + Ex. Guard House 170.52 -
To add raise kerb 150mm
Ex. Office 1 + Staircase 70.20 -
Ex. Lobby 35.40 -
12300.00

Ex. Storage 1 Ex. Office 2/ New Cold Room 1,2,3 73.20 -


Ex. Access 136.08 -
To remove existing wall Ex. Storage 1/ New Cold Room 4,5 147.60 -
Ex. Storage 2 29.34 -
6150.00

New Cold Room Ex. Office 3 61.78 -


5 Ex. Pathway + Staircase 34.32 -
B.3
To add new cut off drain 150mm width Ex. Bath 9.80 -
To install 3 nos. partition room Tingkat Atas
Void Ex. Pantry 18.61 -
B.6 B.9, B.10, B.11, B.12
Ex. Bath 2.88 -
dp

dp

Ex. Storage Ex. Office + Staircase 102.60 -


Ex. Drain

To install new cold room To change existing sliding door to


new 2.1m width sliding door
Ex. Storage/ New Workers Accomodation 56.28 -
4890.00

4890.00

New Cold Room Compressor Area - 35.40

Ex. Storage 2 Ex. Office 3 Jumlah Keluasan Lantai 984.01 35.40


7750.00

Peratus Tambahan Keluasan Lantai 35.40


New Workers Accomodation 984.01
x 100 = 3.6%

dp
Ex. Bath
dp

Void
2860.00

Ex. Pathway

3100.00 2650.00 11510.00


12000.00 5750.00

GROUND FLOOR PLAN FIRST FLOOR PLAN


SCALE 1:100 SCALE 1:100

You might also like