Item B Building Work Location
Item B Building Work Location
Item B Building Work Location
A-A
A-A
18120.00 12000.00
370.00 7100.00 4900.00
17600.00
6500.00
6000.00 6000.00 5600.00
B.14, B.15 6000.00
18
B.16
28
B.16
8.0
0
92
Ex. Guard
07
House Roof
0
T3
To remove existing Tapak
6.0
1
79
19
perimeter wall
New Cold Room
LO
44
Cadangan
5900.00
30
90
Compressor
T
Ex. Car Porch To remove existing To remove existing
07
LO
car porch roof car porch roof
T3
Area
9
structure and install structure and install
78
new steel platform for new steel platform for
LO
30
cold room compressor cold room compressor
To remove existing To remove existing Ja
T
la
LO
guard house guard house nT
11700.00
SB
5
Entrance
Ex. Drain
0
0.0
00
16
Roof
SITE PLAN
5800.00
Ex. Office 1
SCALE 1:1000
B.8
2350.00
Ex. Pantry To remove existing
dp
car porch roof
structure and install
new steel platform for
cold room compressor
To remove existing guard house
Ex. Bath
and perimeter wall
Ex.Access Void
5900.00
dp
Ex. Lobby
5160.00
13610.00
To remove existing
partition wall
dp
12000.00
B.5 B.13
New New New
Cold
Room
Cold
Room
Cold
Room
To add
1.8m width , 6m length
Ex. Office 18120.00
1 2 3 concrete ramp
6100.00
6100.00
(min. gradient 1:8)
3300.00
To add RC raise floor
dp
4890.00
dp
Ex. Bath
dp
Void
2860.00
Ex. Pathway