Webinar PAMERINDO #8

EFISIENSI
DAN
PENINGKATAN PRODUKTIVITAS
PADA OPERATIONAL SITE
( Maintenance )

Handy.S PPA GROUP


Sept. 21
Information Classification: General
SHARING OUTLINE

Overwiew PPA Objective of


Group Maintenance

Equipment Cost Element Control

IPO Information
Maintenance System

Our Response
Information Classification: General
MODERN CORPORATION 1

PPA GROUP

PPA AMM

PPA
80% SHAREHOLDER 20% LEADER-UP
Information Classification: General
1

Information Classification: General


1

Information Classification: General


2

The Primary Objective of maintenance is to


keep production equipment in a safe ,
effective, as-designed operating condition
so that production and quality target can
be met on time and the least cost

Paul D Thomlingson

Information Classification: General


2

PROJECT
COST

Information Classification: General


2
STRUCTURAL ORGANIZATION

Information Classification: General


2

Integrated Reliability :
Condition Monitoring and
Maintenance of Equipment
Information Classification: General
2

Information Classification: General


2

t < 8% x MOHH

Information Classification: General


Equipment condition parameters with technique can definitely help
3
maksimize component, process performance, and service lifetime and
minimize failure and maintenance costs.

Information Classification: General


EQUIPMENT COSTS 3

Information Classification: General


3

Information Classification: General


ELEMENT CONTROL
4

Information Classification: General


STRATEGY EFFECTIVE 4

MANAGEMENT EQUIPMENT
+
RCM

RCM
( Reliability Centered Maintenance )
proactive strategy for achieving
maximum equipment reliability and extended life at the least cost.
(Moubray 1996)
Information Classification: General
Steps in the 4
RCM
implementation
process

RISK
MANAGEMENT
Information Classification: General
5

PROSES
• SUPPLY CHAIN
• MANPOWER
COMPETENCE • MAINTENANCE
• PERFORMANCE
• MANAGEMENT POLICY

INPUT OUTPUT

Information Classification: General


5
• readiness and lead time of parts
SUPPLY CHAIN • standarisation of price < main price
persentage

MANPOWER • Focus maint. Training


COMPETENCE • Increase budget training.

• Maint. priority
• Big machine 1x OVH ( external OVH )
• Small machine aren’t OVH
MANAGEMENT POLICY • Free Budged mak. 50 million for site
operations
• Performance Priority

Information Classification: General


INFORMATION SYSTEM ( SS6 ) 6

BREAKDOWN REPOT By OPERATOR

Information Classification: General


INFORMATION SYSTEM ( SS6 ) 6

ACTION BY BASE CONTROL

Information Classification: General


6

Information Classification: General


7

RESPONSE GOAL

Q • Quality

U • Utilize
SAFE AND STRONG
I • Innovation OPERATIONAL PERFORMANCE

C • Customer Focus

K • Key Performance Indicator

Information Classification: General


THANK
YOU

PPA SS6 AMM

Information Classification: General