Arun Valley Hydropower Company Ltd

● Project details
1. Kabeli B-1 Cascade HEP
● Capacity: 9.94 MW
● Issue date: 2070-3-28
● Agreement : 2075-08-09
● COD: 2078-10-16
● The project is also an R-O-R project developed at 40% probability of exceedance
● Capacity utilization :90% of contract energy since its commissioning.
● The project was completed at a cost of NPR 2,199 million (NPR 221
million/MW) at a D: E mix of 63:37.
2. Budhum Khola HEP
● Capacity:14.5 MW
● Issue date:2017-10-01
● Phase: Survey license approved

3. Kabeli B-1 HEP Site (Taplejung, Panchthar)


● Capacity: 25 MW
● Issue date: 2070-03-21
● COD: 2076-6-23
● Power delayed by 1 years due to the transmission line

4. Piluwa Khola HEP Site (shankhuwashaba)


● Installed capacity: 3 MW
● Status: under operation
● COD: 2060-06-01

5. Pilowa Solar PV Project(solar)

● COMPANY'S INVESTMENT
1. Api Power Company Ltd ( Thapathali, kathmandu)
● Establishment date: 5 Asadh 2060
● Ownership: transferred into public limited company in 6 shrawan 2020
● Investments : 20 millions

Hydro projects

Naugarh gad hydroelectric project


● Installed capacity: 8.5 MW
● Agreement date: 2010-05-02
● COD: 6 Bhadra 2078
● Financed by BOK
● Located in Darchula district.
● PPA rate: rainy 4 , winter 7
● Escalation period:8 years
● PBP: 12 years
● Overall cost : Rs 1435 millions (30% Equity and 70% bank loan)
● FIRR: 17.56%
● Benefit cost ratios: 1.58 at a discount rate of 11%
Upper Naugarh gad small hydroelectric project
● Installed capacity: 8MW
● Trap efficiency : 98%
● Cost: 1272.404 millions( without IDC)
● Cost after financing: 1738 millions
● Loan and equity ratio: 70:30
● IRR : 16.72%
● Interest rate:11%
● PBP: 5.15 years
● Return of Equity : 26.17%
● Cost per megawatt: 17.38/MW after financing
● COD: 13 kartik 2076

Upper chameliya hydro projects


● Installed capacity: 40 MW
● Survey licensed: 18 Falgun 2072
● PPA agreement: 15 Falgun 2075
● Generation license: 12 ashwin 2076
● Project started: 1 kartik 2077
● Revised COD: 2023-03-15
● Stage: under construction

Solar projects
Dhalkebar 1 MW solar project
● Installed capacity : 1 MW(AC side)
● Survey license: 14 mangsir 2073
● COD: 2 Magh 2078
● Revised COD: 2019-6-17

Parwanipur 8 MW solar PV projects


● Project capacity: 1MW(AC side)
● Revised COD : 2019-6-9
● Survey license for 8 MW: 14 mangsir 2073
● PPA agreement : 27 shrawan 2075

Simara 1 MW solar PV project


● Project capacity: 1 MW (AC side)
● Survey license for 8 MW: 14 mangsir 2073
● PPA agreement : 3 Bhadra, 2075
● COD : 8 shrawan, 2079
● Revised COD: 2019-6-17
● Financed by BOK

Chandranigahapur 4 MW solar PV projects


● Project capacity (AC side): 1 MW
● Survey license for 4 MW: 14 mangsir 2073
● PPA agreement: 27 mangsir 2075

2. Rairang Hydropower Development Company LTD


● Operational capacity: 57.30 MW(all projects)
● Under construction: 49.94 MW
● Solar project under initial stage: 22 MW
● Final stage of construction: 8.5 MW
● Installed capacity: 0.50 MW
● COD: 2011-11-17

Hydropower projects
1. Iwa khola hydropower project
● Installed capacity: 9.9 MW
● Commissioned date : 2072-03-28
● Status: operational
● Generating electricity since 2076-06-20

3. Janata bank
● Investment: 60 million

4. Ridi Hydropower development co LTD


● Installed capacity: 2.4 MW
● COD: 2009-9-27
● D:E :75:25
● Stage: constructed

Hydropower projects
1. Ridi khola hydropower station (palpa district)
● Installed capacity: 1.8 MW
● Commission date : 2070-04-24
● Generating electricity : 2070-04-24
● Status: operational

Solar projects
1. Butwal solar hydropower projects(Rupandehi)
● Power station capacity: 8.5 MW
● Solar panels: 32,640(each generating 330 Watt peak power)
● Construction began : 2019
● Construction ended: 2020 (constructed in 10 Months)
● Cost: 65.5 crores
● Agreement with NEA : 7.3/units for 25 years( after 25 years ownership will
be transferred to Nepal Government
● Status: commissioned

5. Api Hydro Mechanical limited


● Investment : 10 millions
6. Himalayan Urja Bikash company limited (Tinkune, Kathmandu)
● Investments: 43.46 millions
● Converted to public ltd company : 2071 B.S
● Issue date : 2015-05-27
● Installed capacity: 7 MW
● Phase: Under construction

Hydroprojects
1. Uppalo Khimti HEV
● Installed capacity: 12 MW
● Energy: 72.57 GWH
● Investments: 75:25
● PLF: 69.04%
● Cost: 1392 million
● Agreement date: 2067-10-09
● RCOD : 2018-7-16
● PPA agreement: Rainy 4 and winter 7
● Escalation period: 9 yrs

2. Upper Khimti- II( Ramechap, Dolakha)


● Installed capacity : 7MW
● Type: Cascade R-O-R
● Energy: 41.72 GWH
● Investments: 75:25
● PLF: 68.04%
● Cost: 1162 millions
● Agreement date : 2069-12-09
● RCOD: 2019-03-15
● PPA Details: Rainy 4.8 and winter 8.4
● Escalation period: 5 yrs

7. Arun Kabeli Power Limited


● Investment : 24.53 millions
● Year of incorporation: 2067-09-23
● Grid connection agreement: 2068-12-22
● Survey license : 2070-03.-28
● RCOD: 2073-06-01
● Transmission line completion: 2076-04-20
● Electricity generation: 2076-06-16
● COD: 2076-7-23
● PPA Details: Rainy 4.80 and dry 8.40

Hydroprojects

1. Arun Kabeli 1
● Type : R-O-R
● Energy : 151.65 GWH
● Investments : 1500 millions
● PLF: 80%
● Cost: 5000 millions
● Agreement : 2012-7-13
● COD: 2019-11-09
● PPA details: Rainy 4.8 and winter 8.4