27 /6 /22 2 / 7 / 22

Site visit and introduction of on going


renovation work.

Took Measurement of all rooms of on going construction


Work.

Took measurement of all openings , windows, staircase


etc .

Draw Plan on sheet.

Draw Plan on Auto-Cad.

Prepared submission sheet .


4 / 7 / 22 9 / 7 / 22

Observed the work of pointing of electrical


switches and sockets.

Studied the types of tiles,different type of sizes of


different brands.

Observed the cutting and placing work of tiles

Learned the calculation of number of tiles required


per room.

Observed the construction work of compound wall.

Observed the installation work of doors and windows.


11 / 7 / 22 16 / 7 / 22

Site visit of proposed residential building.

Observed all equipments and tools available at site.

Observed the work of construction as per plan.

Observed te work of column casting.

Observed the work of shuttering of column and reinforcement of column.

Observation of work.
18 /7 / 22 23 / 7 /22

Observed the work of casting of beam.

Observed the formwork of slab.

Observed the reinforcement and compaction of slab.

Observation of construction of work.

Learned the procedure of concrete mixture.

Holiday.
25 / 7 / 22 30 / 7 / 22

Draw a plan on Auto-CAD provided by supervisors.

Prepared submission drawings .

Learned estimating and costing.

Learned different method of approximate estimate.

Prepared measurement sheet .

Prepared approximate estimate of residential building.


1 / 8 / 22 6 / 8 / 22

Observed excavation work for foundation.

Collected data from DSR.

Observed Deshuttering work of columns.

Observed footing work.

Observed painting work .collected local rates of materials.

Collected the rates of rents of equipment ,tools and machineries.