Installation Report - 3D Target-PSN-73 - Pier-3-3
Installation Report - 3D Target-PSN-73 - Pier-3-3
Installation Report - 3D Target-PSN-73 - Pier-3-3
PROJECT: DS-197/1 Sewerage System For Interconnecting Developed Communities In Jebel Ali Area Sub-Contractor:
To DM Networks
The above-mentioned instrument have been installed, te sted and commissioned satisfactorily.
Subcontractor’s MAAK’s Engineer's
Representative Representative Representative
MANINDER SINGH
Name
Sign
Date 03-07-2021
Enclosures:
Appendix-1: Installation details
Appendix-2: Check list for 3D Target
Client: Consultant: Contractor:
PROJECT: DS-197/1 Sewerage System For Interconnecting Developed Communities In Jebel Ali Area Sub-Contractor:
To DM Networks
PSN-73
1. PIER_3- N.A. N.A. ERT-10P2
3_3D-01
Client: Consultant: Contractor:
PROJECT: DS-197/1 Sewerage System For Interconnecting Developed Communities In Jebel Ali Area Sub-Contractor:
To DM Networks
Appendix-2
Check List for Installation of 3D Target
PRE - INSTALLATION
Yes No N/A Signature/Initial
1) Drawings available ü
POST- INSTALLATION
Yes No N/A Signature/Initial
Comments:
Name MANINDER SINGH
Sign
Date
03-07-2021