Client: Consultant: Contractor:

PROJECT: DS-197/1 Sewerage System For Interconnecting Developed Communities In Jebel Ali Area Sub-Contractor:
To DM Networks

INSTALLATION REPORT FOR 3D TARGET


Project name: DS-197/1 SEWERAGE SYSTEM
Project owner: DUBAI MUNICIPALITY
Consultant: STANTEC
Contractor: MOHAMMED ABDULMOHSIN AL-KHARAFI & SONS
Service Provider: RITE GEOSYSTEMS LLC
Site name: PSN-73 _ BRIDGE PIER 3-3
Name of instrument, model no.: ERT-10P2
Date of installation: JULY 03, 2021
Reference drawing no.: SKETCH-DS197/1-MAK-INS-848A

Instrument ID: Refer to attach table below

Weather conditions during Installation: NORMAL

Installation personnel: MR. RIZWAN


Items/services used in installation:
Sl.
Item Units Qty.
No.
ERT-10P2_3D target with convergence
1. pcs 1
Bolt

The above-mentioned instrument have been installed, te sted and commissioned satisfactorily.
Subcontractor’s MAAK’s Engineer's
Representative Representative Representative

MANINDER SINGH  
Name

Sign

Date 03-07-2021

Enclosures:
Appendix-1: Installation details
Appendix-2: Check list for 3D Target
Client: Consultant: Contractor:

PROJECT: DS-197/1 Sewerage System For Interconnecting Developed Communities In Jebel Ali Area Sub-Contractor:
To DM Networks

Sl. As-built Co-ordinates


Instrument ID Picture of Installed point Model no.
no. Northing Easting

PSN-73
1. PIER_3- N.A. N.A. ERT-10P2
3_3D-01
Client: Consultant: Contractor:

PROJECT: DS-197/1 Sewerage System For Interconnecting Developed Communities In Jebel Ali Area Sub-Contractor:
To DM Networks

Appendix-2
Check List for Installation of 3D Target

PRE - INSTALLATION
Yes No N/A Signature/Initial

1) Drawings available ü

2) Targets and convergence bolts are in good condition; no


ü
damage/ deformation

3) Epoxy expiry date checked. OK ü

4) Proper tools and consumables required for installation are in


ü
place

POST- INSTALLATION
Yes No N/A Signature/Initial

1) Fixity of the target to the specified location checked. OK ü

Comments:

Subcontractor’s MAAK’s Engineer's


Representative Representative Representative

 
Name MANINDER SINGH

Sign

Date
03-07-2021