Welding Machine Checklist

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 34

UPGRADE SECURITY FACILITIES PROJECT-ABQAIQ&AINDAR

WATER TANKER INSPECTION CHECKLIST Vehcile No: From: To:


S.no DESCRIPTION SAT SUN MON TUE WED THU FRI Remarks

1 Engine condition

2 Clutch / brake / Hand brake

3 Fastener lock pins / Keys.

4 Horn / Reverse horn / Lights

5 Indicators / Wiper Blades

6 Operators fitness

7 Tyre pressure / Tyre Condition

8 Condition of Battery and Lamps

9 Operating levers / steering

10 Gauges & warning devices

11 Fire extinguisher Provided

12 Rear Side Mirror

13 Cab Condition Overall

14 Seat Belt

15 AC Inside driver Cabin


Ladder/Platfroms
16

17 Steps/Grab Iron

Operator/Driver signature:
Safety Officer Signature:
UPGRADE SECURITY FACILITIES PROJECT-ABQAIQ&AINDAR

DAILY AIR COMPRESSOR INSPECTION CHECKLIST From: To:


S.no DESCRIPTION SAT SUN MON TUE WED THU FRI Remarks

1 Frame/casing is free of damage

2 Discharge air hose & coupler ok

3 Whiplash safety cable/hose restraint ok

4 Electrical wirings checked

5 Checked battery terminal/electrolyte

6 Fuel level ok

7 Engine oil leaking

8 Radiator tank coolant level/no leaking

9 engine oil Level ok

10 Compressor Oil Level ok

11 Gauges working Properly

12 Earth Cable

13 Control Panel Condition

14 Fire Extinguisher Availability

Technician Signature

Operator/Driver signature:

Safety Officer Signature:


UPGRADING SECURITY FACILITIES PROJECT-ABQAIQ

WELDING MACHINE DAILY INSPECTION CHECKLIST Date:


DESCRIPTION SAT SUN MON TUE WED THU FRI Remarks

1.WELDING MACHINE

In good working condition

Provided with earthing or grounding

Fire extinguisher is Avalible

2.TERMINALS/JOINTS

In good working condition

Secured and effectively insulated

3.CABLE

Properly insulated and no exposed cables

Hang up to prevent tripping hazard

Size of cable suitable for voltage supply

Hang on insualated hook or material

Cable and joints are proper and in good condition.

4. ElEREODE HOLDER/CLAMP

Electrode holder is free from defects

Returns cable clamp is free from defects

Detach electrodes when not in use

5.WORK AREA

No combuistable or fammable material

Fire Blanket is provided

Maintain good housekeeping

Welder Signature:
Supervisor Signature:
UPGRADE SECURITY FACILITIES PROJECT at ABQAIQ&AINDAR

ASPHALT CUTTER MACHINE DAILY CHECKLIST


Equipment No: Date:
S.no DESCRIPTION SAT SUN MON TUE WED THU FRI Remarks

1 Visual Inspection of Entire Machine

2 Check Engine Oil

3 Fuel Tank Condition

4 Depth Control Handwheel

5 Grease Bearings

6 Inspect Drive Belts

7 Inspect Blade

8 Blade Guard

9 Wheels Condition

10 Water level in Tank

11 Operators fitness

12 Personal Protective Equipment

13 Fire extinguisher Provided

14 Any other Points

Operator signature:

Supervisor Signature:

Safety Officer Signature:


UPGRADE SECURITY FACILITIES PROJECT-ABQAIQ&AINDAR

BACKHOE LOADER INSPECTION CHECKLIST Vehcile No: From: To:


S.no DESCRIPTION SAT SUN MON TUE WED THU FRI Remarks

1 Engine condition

2 Hydraulic System

3 Clutch / brake / Hand brake

4 Fastener lock pins / Keys.

5 Horn / Reverse horn / Lights

6 Indicators / Wiper Blades

7 Operators fitness

8 Tyre pressure / Tyre Condition

9 Condition of Battery and Lamps

10 Operating levers / steering

11 Gauges & warning devices

12 Fire extinguisher Provided

13 Rear Side Mirror

14 Seat Belt

14 AC Inside driver Cabin

15 Any other Points

Operator/Driver signature:
Safety Officer Signature:
UPGRADE SECURITY FACILITIES PROJECT-ABQAIQ&AINDAR

COMPRESSOR MACHINE INSPECTION CHECKLIST Location: From:


S.no SAT SUN MON TUE WED THU FRI Remarks

DESCRIPTION YES NO YES NO YES NO YES NO YES NO YES NO YES NO

Visual check of mains electrical switches, wiring and/or conduit


1 (cracks, broken controls etc.) Arrange for immediate repair of
any faults.

Verify all guards are secure and function correctly (check latches,
2 locks, fasteners and/or interlocks).

Ensure workspaces and walkways are clear and unobstructed,


and that
3 no slip-hazards are present

4 Confirm availability and condition of personal protective


equipment.

Visually check that the air receiver drain tap is closed before
5 operating.

6 Conduct any daily checks as required to the manufacture


specifications.

Conduct close inspection for damage to switch gear. Test


operation of switch gear (proper function of switch controls).
7

Check and drain the moisture from the air receiver tank.
8

Check and clean air filters if required


9

10 Check availability of spare parts e.g. air filters, air hose and
fittings, etc.
11
Check that the gauges and air receiver drain tap are functioning.
Adjust, repair or replace as needed..

12 Examine drive belts for flaws and correct tension – adjust if


necessary.

Check the security of machine mountings to the floor or base


13 block.

14 Any other Points


Safety Officer Signature:
UPGRADE SECURITY FACILITIES PROJECT-ABQAIQ&AINDAR

SCAFFOLIDING INSPECTION CHECKLIST Location: From:


S.no SAT SUN MON TUE WED THU FRI Remarks

DESCRIPTION YES NO YES NO YES NO YES NO YES NO YES NO YES NO

1 Presence of Damaged members in Use?

2 Base is firm & leveled to maintain verticality?

3 Sole plate or Wooden plank provided at bottom?

4 Adequate bracing members & ledgers in place


for the scaffolding stability.

5 Are the working platform fully planked and secured properly?

6 Joint pins are misused i.e. usage of tor rods?

7 Toe-guards and Guardrails provided and properly lashed?

8 Is ladder free from any damage and placed properly?

9 Tag system is in place?

10 Condition of Scaffolding wheels with locks system?

11 Does the height of mobile scaffold within the ratio (1:3) i.e.
1 mtr min. base = max. allowable height 3 mtr.

12 Is scaffolding is close to excavated pits?

13 Availability of Lateral support with rigid structure i.e.


Horizontal and Diagonal support?

14 Any other Points


Safety Officer Signature:
UPGRADE SECURITY FACILITIES PROJECT-ABQAIQ&AINDAR

EXCAVATOR INSPECTION CHECKLIST Vehcile No: From: To:


S.no DESCRIPTION SAT SUN MON TUE WED THU FRI Remarks

1 Engine condition

2 Hydraulic System

3 Clutch / brake / Hand brake

4 Fastener lock pins / Keys.

5 Horn / Reverse horn / Lights

6 Indicators / Wiper Blades

7 Operators fitness

8 Tyre pressure / Tyre Condition

9 Condition of Battery and Lamps

10 Operating levers / steering

11 Gauges & warning devices

12 Fire extinguisher Provided

13 Rear Side Mirror

14 Seat Belt

14 AC Inside driver Cabin

15 Any other Points

Operator/Driver signature:
Safety Officer Signature:
UPGRADE SECURITY FACILITIES PROJECT-ABQAIQ&AINDAR

ELECTRIC JACKHAMMER CHECKLIST Equipment No: From: To:


S.no DESCRIPTION Remarks

Make sure there's no physical damage or crack on


1 body, wire or push botton

Make sure that tool is properly insulated and secured


2 & no cut on wire

3 Make sure there's no hole in receptacle connection

Make sure cable is properly connect in receptacle &


4 receptacle seal is present.

There are no signs of overheating or looseness on


5 receptacle and its pins

6 All movable parts should be properly fitted

7 Handles

8 Push botton is in working condition

9 Fire extinguisher Provided

10 Avaliblity of Anti Vibration gloves&Other PPE

11 Any other Points

Inspected by :

Safety Officer Signature:


UPGRADE SECURITY FACILITIES PROJECT-ABQAIQ&AINDAR

DUMP TRUCK INSPECTION CHECKLIST Vehcile No: From: To:


S.no DESCRIPTION Remarks

1 Engine condition

2 Clutch / brake / Hand brake

3 Fastener lock pins / Keys.

4 Horn / Reverse horn / Lights

5 Indicators / Wiper Blades

6 Operators fitness

7 Tyre pressure / Tyre Condition

8 Condition of Battery and Lamps

9 Operating levers / steering

10 Gauges & warning devices

11 Fire extinguisher Provided

12 Rear Side Mirror

13 Seat Belt

14 AC Inside driver Cabin

15 Any other Points

Operator/Driver signature:

Safety Officer Signature:


UPGRADE SECURITY FACILITIES PROJECT-ABQAIQ&AINDAR

VEHICLE INSPECTION CHECKLIST Vehcile No: From: To:


S.no DESCRIPTION SAT SUN MON TUE WED THU FRI Remarks

1 Engine condition

2 Clutch / brake / Hand brake

3 Fastener lock pins / Keys.

4 Horn / Reverse horn / Lights

5 Indicators / Wiper Blades

6 Operators fitness

7 Tyre pressure / Tyre Condition

8 Condition of Battery and Lamps

9 Operating levers / steering

10 Gauges & warning devices

11 Fire extinguisher Provided

12 Rear Side Mirror

13 Seat Belt

14 AC Inside driver Cabin

15 Any other Points

Operator/Driver signature:

Safety Officer Signature:


UPGRADING SECURITY FACILITIES PROJECT-ABQAIQ

Water Filling in Tank checklist


S.no Date of Water Filling Water Filled By Checked by Engineer Remarks

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26
27
UPGRADING SECURITY FACILITIES PROJECT-ABQAIQ

Sewage cleaning checklist


S.no Date of Removal Sewage Sewage removal by Checked by Engineer Remarks

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26
27
Ashi &Bushnag Co. Abqaia Camp Inspection chcecklist

DATE:
S.no DESCRIPTION SAT SUN MON TUE WED THU FRI

Camp license posted in clearly visible location


1

Emergency contact number place on notice board


2
Medical/First Aid: A person suitably trained in
3 first aid is available for the camp

Fire warden: Available in camp


4

Hazards are NOT stored under the living units


5
Are suitable cleaning chemicals available and stored
6 correctly and are proper cleaning methods used?

Are cleaning cloths suitable for use and regularly


7 cleaned and disinfected and used properly?

Are dried goods stored correctly e.g. in suitable room,


8 off the floor, in covered containers?

Common shower and toilet facilities have been cleaned


9

Laundry tubs and machines connected to septic system


10

No ponding on septic drain field


11

Electrical outlets not overloaded w/ extension cords


12

Refrigerator properly working


13

Stairs, rails, and landing structurally sound and safe


14

Stove properly working


15

Kitchen and counter tops in acceptable condition


16

Showers and sinks properly draining


17

Hot water available and under pressure


18

Smoke alarms and detectors functioning


19

Lights/ receptacles including GFCI are properly working


20

Laundry facilities adequate and functioning


21
Daily Check COVID-19 Symptoms (Fever (+38),Cough, Shortness of
22 breath, Sore throat)
Toilet and lavatory facilities and privies are
cleaned daily and disinfected using a disinfectant
23 solution
Sleeping quarters with allocated floor space at a rate of not less
than 4.6 m2 (50 ft2) but preferably 6.5m2 (70 ft 2) are provided for
24 each resident.

Fire extingusihers Present at Kitchen &open area.


25

First Aid kit present in Camp


26

Garbage and refuse is collected daily


27

Bedrooms are clean, tidy & pest free.


28
LPG cylinders are stored outside under sunshade and not located
29 inside any building.

Checked by:Camp Supervior/Camp Boss


Remarks
UPGRADE SECURITY FACILITIES PROJECT-ABQAIQ &AINDAR

BACKHOE LOADER DAILY INSPECTION CHECKLIST Date:


S.no DESCRIPTION SAT SUN MON TUE WED THU FRI Remarks

1 Engine condition

2 Clutch / brake / Hand brake

3 Fastener lock pins / Keys.

4 Horn / Reverse horn / Lights

6 Operators fitness

7 Tyre pressure / Tyre Condition

8 Condition of Battery and Lamps

9 Operating levers / steering

10 Gauges & warning devices

11 Fire extinguisher Provided

12 Rear Side Mirror

13 Seat Belt

14 Any other Points

Operator signature:

Supervisor Signature:

Safety Officer signature


Ladder Inspection Checklist
Project: Date:

S.NO
Is the ladder looking straight?
Is the ladder painted or dirty making it difficult to look for defects?
Is there any sign of crack or bend in the stiles or rungs?
Is there any knot big enough to suspect the stability of the ladder?
Is the ladder long enough?
Is the ladder being locked to avoid displacement?
Is the ladder placed in such a way that there is about 1.5 m projection above the working platform, if it is used as approach?
Ladder inspection colour code followed?

After the inspection, the ladder is approved/ not approved for further works.
UPGRADE SECURITY FACILITIES PROJECT AT ABQAIQ&AINDAR

CONCRETE PUMP INSPECTION CHECKLIST


Equipment No: Date:
S.no DESCRIPTION SAT SUN MON TUE WED THU FRI Remarks

1 Cabin condition(seat,switches,gauges,wipers&Cab Doors)

2 Engine (oil condition,exhaust,cooling system,noises

3 Fuel Tank Condition

4 Exterior(frames,outriggers)

5 Exterior(stairs, hand rails)

6 Exterior(bumpers, sheets &Lights)

7 Hydraulics/ pneumatics(brake accumulators)

8 Hoses & lines

9 Compressor

10 Boom cylinders

11 Boom erecting

12 Pump cylinders

13 Concrete lines

14 Boom sections

15 Wheels Condition

16 Operators fitness

17 Personal Protective Equipment

18 Fire extinguisher Provided

19 Any other Points

Operator signature:

Supervisor Signature:
Safety Officer Signature:
UPGRADE SECURITY FACILITIES PROJECT at ABQAIQ&AINDAR

CONCRETE VIBRATOR INSPECTION CHECKLIST


Equipment No: Date:
S.no DESCRIPTION SAT SUN MON TUE WED THU FRI Remarks

1 Check the guards are in pully,belts and fans

2 Engine condition

3 Fuel Tank Condition

4 Fuel level

5 Vibrator neddle condition

6 Noise level

7 Vibrator visual condition

8 Operators fitness

9 Personal Protective Equipment

10 Fire extinguisher Provided

11 Any other Points

Operator signature:

Supervisor Signature:

Safety Officer Signature:


UPGRADE SECURITY FACILITIES PROJECT at ABQAIQ&AINDAR

CONCRETE MIXER INSPECTION CHECKLIST


Equipment No: Date:
S.no DESCRIPTION SAT SUN MON TUE WED THU FRI Remarks

1 cab is clean and tidy (no loose tools or equipment)

2 Lights general flashing/bars, rear beacons and LED's

3 working indicators and horn

4 Vehicle general condition - tyres/ lighting


Mixer drum roller and prop shaft guards
,,
5

water tank/ hoses stored on vehicle correctly, in clean


6 and operational condition

7 Engine condition

8 Fuel Tank Condition

9 Fuel level

10 Operators fitness

11 Personal Protective Equipment

12 Fire extinguisher Provided

13 Any other Points

Operator signature:

Supervisor Signature:
Safety Officer Signature:
UPGRADE SECURITY FACILITIES PROJECT-ABQAIQ&AINDAR

SKID STREE LOADER INSPECTION CHECKLIST Vehcile No: From: To:


S.no DESCRIPTION Remarks

1 Engine condition

2 Clutch / brake / Hand brake

3 Fastener lock pins / Keys.

4 Horn / Reverse horn / Lights

5 Indicators / Wiper Blades

6 Operators fitness

7 Tyre pressure / Tyre Condition

8 Condition of Battery and Lamps


Front horn / backup alarm - Check for proper
9 function.

10 Operating levers / steering

11 Gauges & warning devices

12 Fire extinguisher Provided

13 Rear Mirror

14 Seat Belt
General - Check for loose or broken parts,damaged
operator cab, instrument operation,loose wheel
nuts, or track spracket nuts, oil leaks,damaged or missing safety
signs (decals).
15
Seat belt, seat bar and control interlocks -
16 Check function

17 Any other Points

Operator/Driver signature:

Safety Officer Signature:

You might also like