Onshore Small Scale Solutions

ADAPTED to PORT INFRASTRUCTURES

Saint-Rémy-lès-Chevreuse
Disclaimer

This document contains information resulting from testing, experience and know-how of
GTT, which are protected under the legal regime of undisclosed information and trade
secret (notably TRIPS Art. 39) and under Copyright law. This document is strictly
confidential and the exclusive property of GTT. It cannot be copied, used, modified,
adapted, disseminated, published or communicated, in whole or in part, by any means,
for any purpose, without express prior written authorization of GTT. Any violation of this

Entreprise XX & GTT for xx event


clause may give rise to civil or criminal liability - © GTT 2010 - 2015

1/22/2016
CONFIDENTIAL
2
Above‐ground
A panel of solutions
In pit
GBS

CONFIDENTIAL 1/22/2016 Entreprise XX & GTT for xx event


All solutions, with membrane Above‐ground 
Solutions

In Pit solutions

GTT Membrane

Entreprise XX & GTT for xx event


1/22/2016
Gravity Base Structure 
Multi‐functions storage
(GBS)

CONFIDENTIAL
4
All capacities covered by the GTT solutions
Onshore Small Scale Solutions

Prefabricated concrete tank

Storage capacity (cbm)

1K 5K 10 K 30 K 300 K+

Entreprise XX & GTT for xx event


GBS Metallic or concrete envelope

Cylindrical flat bottom


Metallic or concrete envelope,

1/22/2016
(Full or Single integrity)

CONFIDENTIAL
GST ®
Exoskeleton
Concrete with polygonal inner face
Metallic envelope,
(mainly Full integrity)
(Full or Single integrity)

5 5
Bunker GBS

CONFIDENTIAL 1/22/2016 Entreprise XX & GTT for xx event


Membrane Bunker GBS (1/2)

Target capacity : from 2k to 30k

Steel or concrete caisson

Adapted for each situation

Entreprise XX & GTT for xx event


In quayside with transfer arms
In pit quayside, water removed
Near shore onto sea floor

1/22/2016
CONFIDENTIAL
7
Membrane Bunker GBS (2/2)

Strong resistance to external


hazards

Construction in dry-docks or floating


dock

Entreprise XX & GTT for xx event


Structure, containment system and
process completed in construction
site

Transportation by towing

1/22/2016
No building impact in ports activities

CONFIDENTIAL
Adapted to standardized conception
8
Onshore solutions – Parallelepipedic steel tank

CONFIDENTIAL 1/22/2016 Entreprise XX & GTT for xx event


Membrane Exoskeleton Steel Tank (1/2)

Target capacity : from 1k to 10k

Metallic exosqueleton with membrane


Various concepts depending on requirements
Cryogenic Steel + CS without Secondary Barrier

Entreprise XX & GTT for xx event


None cryogenic steel + CS with Secondary Barrier
Membrane Single containment

Adapted to standardized conception

1/22/2016
CONFIDENTIAL
10
Membrane Exoskeleton Steel Tank (2/2)

Integrated sump to reduce dead


stock

Easy to manage as pit solution

Entreprise XX & GTT for xx event


Structure which enables air
circulation
No need of heating system

Sump drainage system to remove


water

1/22/2016
Secondary barrier of CS could be

CONFIDENTIAL
removed

11
Onshore solutions – Precasted concrete tank

12

CONFIDENTIAL 1/22/2016 Entreprise XX & GTT for xx event


Membrane Concrete Precasted Tank (1/2)

Target capacity : from 1k to 15k

Strong resistance to external hazards

High level of prefabrication

Entreprise XX & GTT for xx event


Precasted concrete elements
Fabricated in factory
Connected in factory or construction site

1/22/2016
Containment system predominantly pre-installed on concrete

CONFIDENTIAL
After connection of concrete elements completion of CS

13
Membrane Concrete Precasted Tank (2/2)

Overall sequence description


Concrete pouring
CS can be used as formwork

Loading and transporting elements

Entreprise XX & GTT for xx event


Erection on construction site

Containment system completion

1/22/2016
CONFIDENTIAL
14
Onshore solutions – Prefabricated steel tank

15

CONFIDENTIAL 1/22/2016 Entreprise XX & GTT for xx event


Membrane Cylindrical Steel Outer Tank (1/2)

Target capacity : from 2k to 40k

Build in specialized environment

Towed in-place and dropped

Entreprise XX & GTT for xx event


Concrete floating caisson
Double stiffened slab
Casted sump to reduce dead stock

1/22/2016
Metallic outer tank
Various concepts depending on requirements
• Cryogenic Steel + CS without Secondary Barrier

CONFIDENTIAL
• None cryogenic steel + CS with Secondary Barrier
• Membrane Single containment

16
Membrane Cylindrical Steel Outer Tank (2/2)

Overall sequence description


Concrete box construction

Concrete box towing to the yard

Entreprise XX & GTT for xx event


Metallic tank construction in the yard

Simplified membrane installation

Piping and tank equipment installation

1/22/2016
Towing of the tank and slab to the final site

CONFIDENTIAL
Installation on site
17
Solution with all in one caisson (add-on)

18

CONFIDENTIAL 1/22/2016 Entreprise XX & GTT for xx event


Membrane Multi-functions Solutions

Storage taking advantage of


existing facilities
The storage function is
combined with another function
Breakwater dike

Entreprise XX & GTT for xx event


Jetty pile

No visual impact

In a harbour environment,
storage and potential hazards

1/22/2016
remote from public and other
activities

CONFIDENTIAL
Membrane perfectly adapted to
fit internal shape
19
Entreprise XX & GTT for xx event
Thank you for your attention
Jérôme Pellé • jpelle@gtt.fr

1/22/2016
CONFIDENTIAL
20