Professional Documents
Culture Documents
2016-06 - GST Pump Tower
2016-06 - GST Pump Tower
June 2016
Disclaimer
This document is strictly confidential. Any unauthorised access to, appropriation of,
copying, modification, use or disclosure thereof, in whole or in part, by any means, for
any purpose, infringes GTT’s rights. This document is part of GTT’s proprietary know-
how and may contain trade secrets protected worldwide by TRIPS and EU Directives
against their unlawful acquisition, use and disclosure. It is also protected by Copyright
law. The production, offering or placing on the market of, the importation, export or
storage of goods or services using GTT’s trade secrets or know-how is subject to GTT’s
prior written consent. Any violation of these obligations may give rise to civil or criminal
liability. © GTT, 2010-2016
01/06/2016 JGC/Rekind
CONFIDENTIAL
2
External Structures & Piping Arrangement
Vacuum breakers Pressure relief valves
01/06/2016 JGC/Rekind
Tubular structure area
CONFIDENTIAL
Not technology dependant
3
Typical Tubular Structure
01/06/2016 JGC/Rekind
CONFIDENTIAL
Bottom guide
4
Pump tower
01/06/2016 JGC/Rekind
CONFIDENTIAL
5
Pump tower
01/06/2016 JGC/Rekind
CONFIDENTIAL
6
Pump tower
01/06/2016 JGC/Rekind
CONFIDENTIAL
7
Smaller tank size:
Reduced unpumpable with sump
Example of a 40,000m3 LNG tank
44m Tank diameter
36m Overall height
Sump well configuration only 500m3 dead stock
Increased prefabrication : only 4 months for
Membrane system installation on site
Reduced footprint and tank height
01/06/2016 JGC/Rekind
CONFIDENTIAL
8
Thank you for your attention
Stéphane Maillard • smaillard@gtt.fr
01/06/2016 JGC/Rekind
CONFIDENTIAL
9