Unit RFU OWN BD REMARK HM BD DATE BD TIME EST RFU PIT LOC
(2022) Number
PMS 300 Hrs (SC/PM) Complete engine parts, on progress Repair Bracket Torque Rod Apar, Repair hinge torque rod upper
DT2522 27932.5 1-Nov-22 06:57 25-Dec-22 Workshop
RH/LH, Install sliding operator seat, Complete parts. Resistor blower motor failure
Engine blowby (UNS/ENG) Regasket cyl head, Repaired & Installed Intercooler, test performance still problem ECM to
4 2 DH 2 GR3053 6493 14-Dec-22 19:00 30-Dec-22 Workshop
GRADER XCMG GR3005 solenoid cut off and solenoid Priming Pump problem done. Continue Mechanic can't running
GR3063 Troubleshooting engine low power (UNS/ENG) 4847 25-Dec-22 6:45 12:00 TOS
GRADER SANY STG230C-8S 2 2 DH 0
GRADER CATERPILLAR 14H 2 1 WBS 1 HGR3064 Transmission leak WBS
DOZER SHANTUI D22E 7 3 DH 4 TD1238 Engine can't start (done) & Strobelight shut-off (UNS-P/WRL) Continue mechanic APAR low, Seat belt operator missing 5450,2 25-Dec-22 7:41 14:00 Bukit Simon
TD1224 PMS 250 HRS, Engine low power & Transmission oil low (SC/PM) Continue mechanic 5007 25-Dec-22 6:49 12:30 BC 3
TD1237 AC HOT (UNS-P/ACS) Waiting thermostat AC 25-Dec-22 8:10 18:00 AMJ Barat
Total 23 13 10
DEWATERING
PUMP DND LCCCH-200-610. 2 2 JMI 0
Total 2 2 0
SUPPORT & FACILITY
FT1129
MERCY 2528 3 3 DH 0 FT1153
FT1132
Total 3 3 0
Service truck
VOLVO FM380 1 1 DH 0 ST1093
MAINTENANCE COMPONENT
DESCRIPTION REMARK Description
CODE
CODE
STA Starting System
SC Plan Schedule Service, Replacement major component dari planner CRG Charging System
UNS Unschedule Breakdown, replace part saat breakdown yang tidak direncanakan planner ETC Electronic Control
UNS-P Unschedule Predictive Backlog, breakdown terprediksi sebelumnya (terdapat orderan) EFS Engine Fuel System