Screenshot 2022-03-12 at 4.30.57 PM

You might also like

Download as pdf
Download as pdf
You are on page 1of 15
/ TTele-fix 0191-2846495 )) (0194-2490269(S) Email: Jakeda-k@nicin CCeojakeda2 gmail.com wo jakeda jk govin JAMMU & KASHMIR ENERG SCIRNCE 'Y DEV. AGENCY Letter of Award Mis Kashcomp Technologies, Opposite Usmaina Jamia Masjid, Konibal, Pampore, Pulwama. J&K-192121 No. ST/EDA/Grid/25/P-IV/ 1299-1303 Date: 05-01-2022 Sub: Letter of Award for Design, Supply, Installation and Commissioning including Warranty, Comprehensive Maintenance Contract for 5 years of 35 kW Grid Connected Hybrid Ground Mounted Solar PV power plants at Garrison Engineers 864 Engineer Works Section BB Cantonment,Srinagar. Ref. (i) This office NIT No: ST/EDA/Grid/25/P-IV/1234, dated. 13/12/2021 (ii) Your e-bid no. 1136209 Dear Sirs, JAKEDA is pleased to place work order on your firm for Design, Supply, Installation and Commissioning including Warranty, Comprehensive Maintenance Contract for 5 years of 35 kW Grid Connected Hybrid Ground Mounted Solar PV power plants at Garrison Engineers 864 Engineer Works Section BB Cantonment, Srinagar. B< e- The material should conform to the Technical Specifications approved by JAKEDA as per the requirement of the NIT. The LI unit rate arrived through e-tendering & approved by JAKEDA for the capacity of 35KW Grid Tied —Hybrid SPP is Rs 29,85,112.00/-(Twenty Nine Lakh, Eighty Five Thousand, One Hundred and Twelve Only) inclusive of all Central/UT/local taxes, duties etc. as applicable under rules including freight, insurance, carriage etc. FOR site. 1 Security deposit (sd) / Performance Bank Guarantee (PBG) (i) Your Firm needs to furnish a Security Deposit @ 3% (three percent) of the Contract Value/Projeet Cost within 14 days of receipt of LOA. This Performance security will be valid for a total period of 75 months (12 Months Project commissioning period + prescribed CMC Period, i.e. 60 Months + 03 Month additional) from the date of its issuance. (ii) The SD shall be forfeited as follows without prejudice to the Bidder being liable for any further consequential los JAKEDA; Hundred percent (100%) BG amount furnished for the Project Capacity shall be deducted, if the Successful Bidder fails 10 Commission and Maintain the Projects(s) for 5 years to the or damage incurred to satisfaction of JAKEDA as per tender terms and conditions. (iii) For release of the PBG, you shall have to furnish quarterly maintenance reports duly signed by the Beneficiary Institution. 2 Project Inspection (i) The project will be monitored by JAKEDA and the project will be inspected for quality at any time during commissioning or after the aD completion of the project either by officers) from JAKEDA or any agency/experts authorized by JAKEDA. The cost of Inspection shall be borne by the vendor only. (i) During site inspection by JAKEDA/ authorized representative, if the systems are found uninstalled and false report of installation and commissioning is submitted to JAKEDA for claiming payment, JAKEDA could forfeit entire performance guarantee amount up to n from 100% & terminate the contract and black list your participating in JAKEDA tenders for at least three years. 3. Material Inspection by JAKEDA or its representative (i) Shall be conducted when key project components including solar panels, solar inverters, battery cells and module mounting structure is delivered at site. During the material inspection, the design layouts submitted by the vendor shall also be reviewed. 4 Final Inspection Post-Commissioning: () The plant shall be tested for its functionality and performance, The vendor must ensure that all works are executed as per approved designs. 5 Scope of work and guidelines Scope of work is defined in three categories * Grid Connected Hybrid Ground Mounted Solar PV Power Plant © Electrical Works © Civil Works 5.1 Solar Plant ‘The work is to be carried out on “Turn Key Basis’ which includes survey of the site for its feasibility considering the shadow free space, sanctioned load of the beneficiary by the DISCOM, design, supply of grid connected i hybrid ground mounted solar photovoltaic system with all other accessories, equipment and protection devices and including bidirectional meter, installation, testing, commissioning and maintenance services for 5 years, with free replacement warranty on spare parts against manufacturing defects for five years. The technical specifications for the various components and broad scope of work guidelines are as follows: a) The work covers Design, supply, installation, commissioning and Comprehensive Maintenance (CMC) for FIVE years, including supply, installation and commissioning of bidirectional meters as per concemed DISCOM norms. b) Design, supply, civil work, erection, testing and commissioning of SPV grid connected Power Plant as per schedule. ©) The test reports of key components such as Solar PV Modules, Solar Inverters, MMS (HDG & STAAD), Electrical Junction Boxes, Bidirectional Meter must be submitted by the bidder to JAKEDA before supply of material. 4) Your firm is required to get the design reviewed and material inspected before beginning the work at site. In case, the system installation has started without JAKEDA’s approval; in the event that at a later date upon conducting the inspection, JAKEDA recommends corrective measures as necessary, your firm shall have to execute the recommendations mandatorily. No extra cost shall be paid to your firm in such cases. ©) Installation and Commissioning of bi-directional/net meters shall be under the scope of your firm and host institution shall provide necessary support. JAKEDA shall facilitate the process wherever specifically requested by the bidder. 1) Installation of Remote Monitoring hardware / facility with necessary dongle etc. shall be in scope of your firm. The cost of the data pack wi 10 i and internet connectivity shall be the responsibility of the beneficiary. Your firm shall provide rights to JAKEDA to access the Performance data of the inverter by sharing the user id and the Password, as and when required, for JAKEDA to monitor the performance any time. Item Quantity Solar Photovoltaic Modules of rating minimum 35 kW 330 Wp as per MNRE’s ALMM List DC Distribution Box 1 Set “N" in I out where “N” is equal to no. of strings in the array, It shall include a DC isolator at the output of DCDB. Grid-Tied Hybrid Power Conditioning Unit 35kW Consider 0.8 Power Factor the inverter shall be of 35 kW Battery Bank with Rack 35 kWh Battery bank of minimum 240V, 180AH, using2V cells. Isolators for the Battery Bank have to be provided. AC Distribution Box 1 Set Of suitable Rating as per system design, should include MCCB, Multifunction Meter with associated CTs, RYB Indicator, Busbar ete Module Mounting Structure (MMS) 1 Set With Ground Clearance minimum 1000 mm, the ‘material of structure must be hot dip galvanised with 80 mm thickness to bear wind load of project location AC & DC Cables with conduits and other associated As per accessories design Wiring, switches and accessories for Load Segregation As per design GSM Based Remote Monitoring System 1 Set Lightning Arrestor 1 pe Earthing& associated accessories As per Inverter manufacturer's recommendation in this regard design shall be considered, however minimum 3 earthings for the plant are must. 12 Bi-directional Energy Meter As per concerned DISCOM’s regulations 13. Fire Extinguisher 1 Set 1 Set 5.2. Electrical Works Design, Supply, s Specifications | Quantity No | Laying of Input Cable from |3.5C Aluminium |220 Meters Control Room to Bat 150 Room (Including HDPE | somm Conduit and its | | Laying in trenches) 2 | Laying Output Cable from —|3.5C Aluminium | 150 meters Battery 120 sqmm Room to Chinar House | (Including HDPE Conduit and its Laying in trenches) | 3 | Kiosk and Cable Jointing | Standard 2Nos. | 4 | Automatic Changeover 100A,4Pole | 1No. | 5 [MCB with Enclosure | 100 A, 4 Pole and | 2 Nos. IP 65 Enclosure | 8 _| 6 | Fabrication and Installation | Standard IAs per — design of outer casing /panels in MS requirement | for all switchgear equipments and other allied works. CN 5.3. Civil Works c a7 ‘onstruction of 12 fi. X 10 ft. Battery Room and providing chain link fencing around the power plant area as per details bill of quantity mentioned in NIT. Your firm shall install signages of appropriate sizes at the site with the name of the site/Government Institution, capacity of the Solar Power Plant, Name of the Executing Agency ie. JAKEDA, Department of Science and Technology é NJPARTICULARS OF ITEM [UNIT JQTY. Farth Work in Excavation in foundation trenches and inCum 14.18 lal classification of soils including dressing of sides | ramming of bed & dewatering (if any) including all lead! | | [and lifts and disposal of the excavated soil outside | MunicipalDA. Limits or as directed by the Engince |_finchan re. roviding and Laying dry stone soling duly hand packedCum 1.70 [before laying of mud mat including Joading,unloading, carriage T&P complete job. Filling with stone dust (excluding rock) in trenches,Cum 6.79 plinth, sides of foundation et. Layers not exceeding 20cm) | jn depth, consolidating each deposited layer by ramming] Ee spitering lead upto 50m and lift upto 1.5m. Including |. Carriage T&P complete job. a Providing and laying in position ‘cement concrete ofCum |13.60 crovfied grade (1:24) using 40mm nominal size te | rushed stone ageregate including the cost of centrin; cea puttring, all works uptoall levelsIncluding carriage Ir ‘&P complete job. o \5 Prov cement concrete of specified grade for reinforced cement Concrete structural elements including the cost 0 centering, shuttering, finishing but _excludin; reinforcement, including admixtures in recommended [proportions, (as per IS 9103) to accelerate, retard tn lof concrete improve workablity without impairin, lstrength and durablity as per directions of engine: incharge. (1:1.5:3) RCC.Including carriage T&P complete job. All works from plinth level upto floor V level. iding and Laying in Position(1:1.5:3) reinforcedCum [2.38 Reinforcement for R.C.C. work including straightening Kg lcutting, bending, placing in position and binding( including cost of binding wire) at all levels .all complete ob. TMT Bars) (261.80| {foundation and plinth in cement mortar 1:6 (coarse sand is used) Including carriage T&P complete job upto all levels. Brick work with F.P.S bricks of class designation 75A in\Cum 8.55 ‘Structural steel work welded in built up sections, trussesKg and framed work, ete. including cutting, hoisting, fixing in position and applying a priming coat of approved steel iprimer all complete. Including carriage T&P complete job, 998.66, 9 Iequired width & of Gl wire dia. Of 4mm in mesh size '50xSOmm_ including all accessories required as per direction of Engineer incharge Providing & fixing GI chain link fabric fencing ofSqm. 169.15) 1 ‘30mm thickness with 20mm nominal size crushed) lageregate finished with a floating coat of neat cement slurry Including carriage T&P complete job. Providing and laying cement conerete flooring 1:2:4 offSqm. {11.15 12 mm thick cement plaster in 1:4 cement mortar (1[Sqm. ‘cement:4 coarse sand) in brick walls and ceilings with [curing Including carriage T&P complete job. 71.01 12 ‘Providing and finishing of walls and ceilings with putty offSqm. Irequired thickness to prepare the surface even and smooth! icomplete in specified areas as per specified pattern 51.15 Providing and fixing aluminium doors and windows withiSqm. [partition panels (both side decorative laminated for doors) land Smm glass for windows as approved by the Engineer iincharge including all accessories required for doors and) indows including carriage upto site complete. complete) jjob. 5.36 Be \14 Wiring fe i ir jo | Uning for Light point with 1.5 sq.mm i | insulted copper conductor single core cable increas ow oe Pee | [ED ecessed bulb including medium class PVC conduit modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm FRLS PVC insulated| fopper Conductor single core cable etc. as required [including modular plate & GI box. I Supply ing and fixing ceiling fan of double ball bearingNo. [1.00 free i with standard down rod, canopy, hanging) | Aluminum blades, without regulator, A.C] | | 30-250 volts including connections with all necessary fratrial complete of approved as required confirming to| | [IS :374/1979 with up to date ammendments. Ceiling Fan (5| [Star Rating, ISI )-1400 mm Sweep of Standard make including regulator on the existing modular plate switch ‘box including connections but including modular plat |__ ete. as required. 5.4 Comprehensive Maintenance Contract After Sales Service a) It shall be the responsibility of the successful bidder to give required service as and when required to the beneficiary. b) Your firm will ensure that necessary spares are always available with their service centrist to provide necessary after sales service to the customer during the warranty period. ) Your firm shall arrange to provide to the beneficiary, a SPV instruction anual, The Vendor shall also arrange to instruct the beneficiary about routine maintenance procedure. Copy of the same shalll be submitted to JAKEDA. Sh 6 De: a Al sign Documents include: ray layout b. Shadow Analysis Report c. Module Mounting dS El >Re =m G locality) g Structure Design and Layout (as per wind speed of the tring and Equipment Layout lectrical Single Line Diagram Earthing and Lightning Protection Design. TP of Solar PV Modules, Inverters, Cables etc i. Detailed Bill of Material with technical specifications j. Test Reports of Solar PV Modules and Inverters. kK. Ci Pl vil work designing and other allied works as required for Solar Power ant. 7 PENALTY FOR DELAY IN COMMISSIONING w@ In case of delay in commissioning of any project site, penalty @ 1/2% per week or part thereof plus applicable GST on the total system cost subject to a maximum of 5% of total system cost plus applicable GST would be levie * This excludes delay in the completion of the work due to unforeseen reasons beyond the control and without fault and negligence of the firm including (but not restricted to) act of God or public anomie action of Government in its sovereign capacity, floods, epidemics, strikes, lockouts, fires and accidents. 8 INCOME TAX @ Income Tax shall be deducted at source and shall be paid to the Tax authorities on account of the supplier. JAKEDA shall provide the Supplier a certificate for such deduction of Tax. Bx / / 9 PRICE. (i) _ The price shall be for the total scope as defined in this document for Supply of items in full & good condition at FOR Site at the destination at Srinagar, including transit insurance. The Price also includes all charges towards packing & forwarding, inspection, insurance, freight charges, all central/ state/ local taxes & duties ete. as applicable for the supplies. 10 WARRANTY (i) The Ground mounted SPV Power Plants shall be warranted for 5 years from the date of commissioning. The mechanical structures, electrical works including power _—_conditioners.__/inverters/ charge controllers/maximum power point tracker units/¢i ution boards/digital meters/switchgear, storage batteries and overall workmanship of the SPV power plants/systems must be warranted against any manufacturing/ design/ installation defects for a minimum period of 5 years. Materials found damaged during transit or during erection shall be replenished by the supplier immediately without waiting for settlement of their claim with their Insurance Company. (ii) Your firm can also provide additional information about the system and condition of guarantee as necessary, (iii) The agreement will be valid for five years from the date of installation & commissioning of the supplies. (iv) The maintenance service provider shall ensure proper functioning of the system as a whole. All _preventive/routine maintenance and breakdown/corrective maintenance required for ensuring maximum uptime shall have to be provided by your firm. (v) Warranty card shall be provided to the beneficiary. % b 11 CANCELLATION OF ORDER ® aaa ae re 10 terminate in par o full the awarded g its rights and affecting the obligations of the Contractor by giving seven (07) days’ notice in writing in the following events: a) If the Bidder is found defaulter for delayed supply or failure to deliver satisfactory performance or supply of substandard materials pursuant to tender conditions. ) If the Bidder/Vendor fails to comply with the provision (s) of the contract including the responsibilities to provide necessary support and facilitation to the service centers in installation of the system and subsequently fulfil the 5 years free of cost replacement warranty as per the provisions mentioned in this bid document 12 AGREEMENT (i) The firm shall be required to execute an agreement on a valid stamped paper for strict compliance of the terms and conditions of the contract, vis-a-vis the NIT and supply order within a period of 15 days after the placement of LO/LOA (ii) ‘The firm shall have to execute an agreement with JAKEDA as per the terms and conditions of the NIT. (iii) The firm shall bear all the legal expenses incurred on the execution of the agreements. '3 PAYMENT SCHEDULE ‘The following payment schedule shall be adhered ere SNo Payment Milestone = Payment (%age) ilestone | Suppl i ly of Mi ject si | Supp laterial at project site 50% of the Project | Cost. Milestone | Successful Installation and 40% of the Project 2 Commissioning of Grid Connected Solar | Cost. | Power Plant. | Milestone /'Successful Installation and 5% of the Project 3 Commissioning of Net Meter as per Cost. DISCOM norms Milestone | Completion of 5 Years Warranty and 5% @ 1% annually. 4 CMC Period (i) Milestone 1 Payment to the extent of 50% shall be released on the supply of complete equipment at the site as per the BOQ, subject to production of valid test certificates of the equipment from MNRE/NABL accredited test centers and inspection of material by JAKEDA authorized personnel/GERML. (ii) Milestone 2 Payment to the extent of 40% shall be released afier the successful Installation & Commissioning and functioning of the Grid Connected Solar Power Plant for a minimum period of one month and furnishing of Joint Commissioning Report duly signed by JAKEDA, Beneficiary Institution, M/s GERMI and the installing Firm. & Milestone 3 Paym picrroabaireecnanta shall be released after the successful ; ig of the Net Meter as per DISCOM Norms (vi) Milestone 4 Payment to the tune of 5% of the project cost shall be released @ 1% annually till S years Warranty and CMC period against quarterly Comprehensive maintenance reports duly sealed & signed by beneficiary. No variation or modification, or waiver of any of terms and provisions of these specifications shall be deemed valid unless mutually agreed upon in writing by both the purchaser and supplier 14 COMPLETION TIMELI (i) This work should be completed within a period of (90) days from the issuance of the LOA/work order. 15 PACKING (i) All material shall be suitably packed and should conform to the relevant ISS/Railway Rules for transportation direct to destination and the supplier shall be responsible for all the damages/losses due to improper packing, All crates shall be marked with proper signs indicating up and down sides of the packing and also unpacking instructions considered necessary by the suppliers. The quoted price shall be deemed to include the cost of packing. BS 16 DISPUTE RESOLUTION (i) All legal proceeding in connection with the work order will be subject to the jurisdiction of local courts of UT of Jammu and Kashmir. All other terms and conditions as stipulated in the tender document shall be applicable. Yours Sincerely, wh en AL a Qaerceutive Engineer, JAKEDA, Copy to 1. The Chief Executive Officer, JAKEDA for kind information. ‘The Chief Accounts Officer, JAKEDA. 3, Garrison Engineers 864 Engineer Works Section BB Cantonment, Srinagar.

You might also like