REALISASI ANGGARAN BIAYA (RAB)


Provinsi : Lampung No. Rab : 02 (Dua)
Kabupaten : Pringsewu Program : P3MD
Kecamatan : Pardasuka Jenis Kegiatan Sumur Bor
Desa : Pardasuka Selatan Ukuran/Dimensi 50 m
Lokasi : Dusun 04 Jumlah 1 unit
VOLUME JUMLAH HARGA
Kategori Harga Satuan Jumlah
URAIAN Dari Dari Satuan Biaya Rp. Jumlah APBDESA
Total Swadaya APBDESA Swadaya Rp.
Rp.
1. BAHAN a b c = a -b d e f g=bxf h=cxf
1.1 Pipa PVC AW 4" 13.00 - 13.00 btg I-b 290,000.00 - 3,770,000

1.2 Pipa PVC Rucika 1 1/4" 3.00 - 3.00 btg I-b 81,000.00 - 243,000

1.3 Pipa PVC Rucika 1" 3.00 - 3.00 btg I-b 49,000 - 147,000

1.4 Pipa PVC AW 3/4" 2.00 - 2.00 btg I-b 35,000 - 70,000

1.5 Keni 1 1/4" R 4.00 - 4.00 buah I-b 11,000 - 44,000

1.6 Keni 3/4" R 10.00 - 10.00 buah I-b 9,000 - 90,000

1.7 T DRAT DALAM 3/4" R 10.00 - 10.00 buah I-b 7,000 - 70,000

1.8 Seal Tape 5.00 - 5.00 bh I-b 5,000 - 25,000

1.9 Lem isarplast 2.00 - 2.00 bh I-b 50,000.00 - 100,000

1.10 Kran Air 10.00 - 10.00 buah I-b 30,000 - 300,000

1.11 Jet Pump 1.00 - 1.00 unit I-b 3,500,000 - 3,500,000

1.12 Tali Tambang Dia 10 mm 50.00 - 50.00 m' I-b 6,000 - 300,000

1.13 Batu Bata 1,000.00 - 1,000.00 buah I-a 500 - 500,000

1.14 Semen 46.00 - 46.00 zak I-b 63,000 - 2,898,000

1.15 Pasir 6.00 - 6.00 m3 I-a 264,000 - 1,584,000

1.16 Kawat beton 13.00 - 13.00 kg I-b 21,000 - 273,000

1.17 Split 3.00 - 3.00 m3 I-a 492,000 - 1,476,000

1.18 Kabel NYY 3 x 2 1/5 1.00 - 1.00 roll I-b 540,000 - 540,000
1.19 Atap Tower 9.00 - 9.00 M2 I-a 450,000 - 4,050,000
1.20 Oversok 1 - 3/4 5.00 - 5.00 buah I-b 10,000 - 50,000

1.21 Klem Kabel 5.00 - 5.00 bks I-b 5,000 - 25,000

1.22 Paku 12.00 - 12.00 kg I-b 17,000 - 204,000

1.23 Bekisting 2.00 - 2.00 m3 I-a 1,800,000 - 3,600,000

1.24 Stop kran 1 1/4" 2.00 - 2.00 buah I-b 30,000 - 60,000

1.25 Besi Ø10 mm KS 67.00 - 67.00 btg I-b 110,000 - 7,370,000

1.26 Besi Ø8 mm KS 36.00 - 36.00 btg I-b 71,000 - 2,556,000

1.27 Besi Ø6 mm KS 4.00 - 4.00 btg I-b 40,000 - 160,000

1.28 Tower Air 2.00 - 2.00 Unit I-b 1,500,000 - 3,000,000

1.29 Giolistrik (Laporan) 1.00 - 1.00 unit I-a 2,500,000 - 2,500,000

1.30 Pemasangan Listrik 1.00 1.00 titik I-b 1,800,000 1,800,000

Sub Total 1 ) - 41,305,000

2. ALAT

2.1 Ember 10.00 - 10.00 bh II-a 10,000 - 100,000

2.2 Benang Nilon 5.00 - 5.00 roll II-a 5,000 - 25,000

2.2 Lori 1.00 - 1.00 roll II-a 500,000 - 500,000

2.2 Cangkul 2.00 - 2.00 roll II-a 70,000 - 140,000

2.2 Skop 1.00 - 1.00 roll II-a 85,000 - 85,000

2.3 Nomenklatur 1.00 - 1.00 bh II-a 300,000 - 300,000


P3MD Form.7.e

VOLUME JUMLAH HARGA


URAIAN Dari Dari Satuan Kategori Harga Satuan Jumlah
Jumlah APBDESA
Total Biaya Rp. Swadaya
Swadaya APBDESA Rp. Rp.
1. BAHAN a b c = a -b d e f g=bxf h=cxf
2.4 Papan Nama Proyek 1.00 - 1.00 bh II-a 150,000 - 150,000
P3MD Form.7.e

VOLUME JUMLAH HARGA


URAIAN Dari Dari Satuan Kategori Harga Satuan Jumlah
Jumlah APBDESA
Total Biaya Rp. Swadaya
Swadaya APBDESA Rp. Rp.
1. BAHAN a b c = a -b d e f g=bxf h=cxf
Sub Total 2 ) - 1,300,000
3. UPAH

Honor TPK Barang/Jasa

- Ketua 1 1.00 Keg III-a 125000 125,000

- Sekretaris 1 1.00 Keg III-a 100000 100,000

- Anggota ( 3 Orang ) 3 3.00 Keg III-a 75000 225,000

3.1 Pekerja 67.00 67.00 hok III-a 75,000 - 5,025,000

3.2 Tukang 28.00 - 28.00 hok III-a 95,000 - 2,660,000

3.3 Pengeboran 50.00 - 50.00 m III-a 290,000 - 14,500,000

Sub Total 3 ) - 22,635,000

Sumber Dana APBDES Total Biaya APBDES 65,240,000

Catatan :

Sumbangan lahan tidak dimasukkan RAB tetapi dilaporkan dengan form. 6a, 6b dan 6c

Sumbangan dalam bentuk bahan upah dan alat, ditulis dalam kolom Volume dari Swadaya

Operasional TPK dilaporkan pada form Rekapitulasi

Kategori Biaya

I-a Pembelian bahan hasil tenaga manusia

I-b Pembelian bahan hasil industri

II-a Pembelian alat tangan

II-b Pembelian / penyewaan alat mesin

III-a Pembayaran tenaga kerja untuk konstruksi

III-b Pembayaran tenaga untuk pengumpulan bahan

Diketahui Dibuat Oleh

PEKON PARDASUKA SELATAN Ketua PPKP

KETUA
P3MD TOS Sumur Bor

PERHITUNGAN KEBUTUHAN BAHAN DAN HOK

LOKASI : PARDASUKA SELATAN


KECAMATAN : PARDASUKA
KEDALAMAN : 50 m
VOLUME : 1 unit
6.00

2.00

Tinggi bak : 1.5 m 6.00


3.00

2.00

3.00
Dimensi Bak Distribusi
28 KK
Jumlah pemakai air pada saat ini adalah : 430 orang
Jumlah pemakai air pada saat 10 tahun mendatang :
430 x ( 1 + 2 / 100 )^ 10 = 524 org = 524

Bila kebutuhan 1 org/lt/hr = 60 lt/hr


Debit yang dibutuhkan tiap 1 orang = 60
(lt/dtk)
60 x 60 x 24

Q1 = 0.00069444 lt/dt
Q324= 524 x Q1 = 0.36 lt/dt
1.5
Vol Hidran Umum untuk menampung air selama ± 10 jam : 2
0.36 x 60 x 60 x 10 = 13100 lt
2
Direncanakan dimensi bak Penampung = 2.0 x 2.0 x 1.5 = 6 m3

Volume Galian
Panjang = (6 x 2 )+(6 x 2 ) = 24.00 m
A 0.25 Volume = 0.35 x 0.25 x 24.00 = 2.10 m3

0.35

Vol Pondasi Setempat 0.80


Jumlah = 4.00 bh
0.9 Volume = 0.90 x 0.90 x 0.90 = 0.729 m3
B = 2.916 m3

Total Volume Galian = 5.02 m3


0.9

Volume Urugan
0.10 Panjang = 24.00 m
A Volume 1 = Urugan kembali pondasi
0.25 = (0.1 + 0.05) / 2 x 0.25 x 24 x 2 = 0.90 m3

0.25
0.35

4 / 10
P3MD TOS Sumur Bor

Pondasi Setempat 0.80


0.30 Jumlah = 4.00 bh
B Volume 1 = Urugan kembali pondasi
0.9 = (0.3 + 0.05) / 2 x 0.9 x 4 x (0.8 + 0.1) = 0.57 m3
Volume 2 = Urugan lantai, dari tanah asli ke permukaan lantai, tinggi = 0.20 m
= ((6 x 6) x 0.2 = 7.20 m3

0.8 Total Urugan = 8.67 m3


0.9

Volume Pondasi
0.10 Panjang = 24.00 m
A Volume = (0.1 + 0.2) / 2 x 0.2 x 24 = 0.72 m3

0.2 Vol. Pasir Urug


= 0.03 x 0.3 x 24.00 = 0.22 m3

0.03
0.2

0.3

B 0.30 Jumlah = 4.00 Buah


Volume = (0.3 + 0.8) / 2 x 0.8 x 4 x 0.8 = 1.41 m3

Vol Pasir Urug


= 0.03 x 0.9 x 0.80 x 4 = 0.09 m3
0.8

0.03 Pelindung kran = 12.00 x 0.20 x 0.10 = 0.24 m3


0.8 Saluran air = 24.00 x 0.75 x 0.05 = 0.9 m3
Beton Tumbuk = 6.00 x 6.00 x 0.05 = 1.8 m3
0.9

Volume Sloof dan Balok Landasan Bak


0.20 Panjang = (3 x 2 ) + (3 x 2 ) = 12.00 m
Volume = 0.20 x 0.20 x 12.00 x 2 = 0.96 m3

0.20 Besi Ø10 mm = 4 x (3 + 0.1 ) x 2 + (3 + 0.1 ) x 2 x 2 = 99.20 m


4Ø 10 = 99.20 / 12.00 = 8.27 ≈ 8.27 btg

Ø 8 - 0.2 Besi Ø8 mm = (((3/0.2 + 1) x 2) + ((3/0.2 + 1) x 2)) x 2 = 128.00 bh


= 128.00 x 0.74 = 94.21 m
= 94.21 / 12.00 = 7.85 ≈ 7.85 btg
Volume Kolom
0.25 Tinggi = 4.00 m Panjang kolom yang tertanam pondasi = 0.40 m
Jml Kolom = 4.00 bh
Volume Beton = 0.25 x 0.25 x 4.40 x 4 = 1.10 m3
0.25
8Ø 10 Besi Ø10 mm = 8 x 4.40 + 0.1 x 4 = 144.00 m
= 144.00 / 12.00 = 12.00 ≈ 12.00 btg
Ø 8 - 0.2 Besi Ø8 mm = 4.40 / 0.20 + 1 x 4 = 92.00 bh
= 92.00 x 0.94 = 86.11 m
= 86.11 / 12.00 = 7.18 ≈ 7.18 btg

Volume Balok Kran


0.10 Panjang = (3 x 2 ) + (3 x 2 ) = 12.00 m
Volume = 0.10 x 0.10 x 12.00 = 0.12 m3

0.10 Besi Ø8 mm = 4 x (3 + 0.1 ) x 2 + (3 + 0.1 ) x 2 x 2 = 99.20 m


Ø8 = 99.20 / 12.00 = 8.27 ≈ 8.27 btg
Besi Ø6 mm = (((3/0.2 + 1) x 2) + ((3/0.2 + 1) x 2)) x 2 = 128 bh
Ø 6 - 0.2 = 128.00 x 0.34 = 43.01 m
= 43.01 / 12.00 = 3.58 ≈ 3.58 btg

5 / 10
P3MD TOS Sumur Bor

Tebal Plat Bawah = 0.15 m


Volume = 3.0 x 3.0 x 0.15 x 1 = 1.35 m3

Jumlah Penulangan 1 Besi 10


Panjang a = 2.96 + 0.11 x 2 + 0.12 x 16.0
= 100.16 m
3.0 Panjang b = 2.96 + 0.11 x 2 + 0.12 x 16.0
= 100.16 m
Jumlah Panjang = 200.32 m
Jumlah 200.32
= = 16.69 Batang
3.0 12
O 10 - 0.20 = 16.69 Batang = 123.53 kg

Tebal Dinding 4 Sisi = 0.10 m


Volume = 0.00 x 0.0 x 0.10 x 4 = 0.00 m3

Jumlah Penulangan 4 Sisi Besi 10


Panjang Vertikal = -0.04 + 0.10 x 1 x 4
= 0.24 m
Jumlah 0.24
= = 0.02 = 0.02 Btg = 0.15 kg
12

Panjang Horisontal = -0.04 + 0.10 x 4 + 0.1 x 1


= 0.34 m
O 10 - 0.10 Jumlah 0.34
= = 0.02833
12
= 0.02833 Batang = 0.21 kg

Tebal Plat Atas = 0.10 m


Volume = 0.00 x 0.0 x 0.10 x 1 = 0.00 m3

Jumlah Penulangan 1 Besi 10


Panjang a = (0.04) + 0.10 x 1
= 0.06 m
Panjang b = (0.04) + 0.10 x 1
= 0.06 m
Jumlah Panjang = 0.12
Jumlah 0.12
= = 0.01 Batang
12
O 10 - 0.20 = 0.01 Batang = 0.07 kg

Plesteran
1 Kolom = 0.25 x 4.00 x 4 x 4 = 16.00 M2
2 Balok Kran = 0.10 x 12.00 x 4 = 4.80 M2
3 Balok Bak = 0.20 x 12.00 x 4 = 9.60 M2
4 Dinding = 0.00 x 0.00 x 4 x 2 = 0.00 M2
5 Lantai Bak = 0.00 x 0.00 x 2 = 0.00 M2
Jumlah = 30.40 M2

ANALISA
No. Kode Koefisien Volume
1. SNI-2835-2008 - 6.1 1 m3 galian biasa
- Pekerja 0.75 7.12 5.34 ≈ 5.00 hok

2. SNI-2835-2008 - 6.11 1 m3 urugan pasir


- Pasir Urug 1.2 0.30 0.36 ≈ 0.00 hok
- Pekerja 0.3 0.30 0.09 ≈ 0.00 hok

3. SNI-2835-2008 - 6.9 1 m3 urugan tanah biasa dan dipadatkan tiap 20 cm


- Pekerja 0.75 8.67 6.50 ≈ 7.00 hok

4. SNI-2836-2008 - 6.2 1 m3 pasangan batu belah 1:4


- Batu Belah 1.2 2.13 2.55 ≈ 3.00 m3
- Semen 3.26 2.13 6.94 ≈ 7.00 zak
- Pasir 0.52 2.13 1.11 ≈ 1.10 m3
- Pekerja 1.5 2.13 3.19 ≈ 3.00 hok
- Tukang 0.75 2.13 1.60 ≈ 2.00 hok

6 / 10
P3MD TOS Sumur Bor

7 / 10
P3MD TOS Sumur Bor

5. SNI-7394-2008 - 6.29 1 m3 sloof beton bertulang 1:2:3


- Semen 7.42 0.48 3.56 ≈ 4.00 zak
- Pasir Beton 0.54 0.48 0.26 ≈ 0.30 m3
- Split 0.81 0.48 0.39 ≈ 0.00 m3
- Bekisting 0.27 0.48 0.13 ≈ 1.50 m3
- Bendrat 3.00 0.48 1.44 ≈ 1.00 kg
- Paku 2.00 0.48 0.96 ≈ 1.00 kg
- Besi Ø10 mm 1.05 4.13 4.34 ≈ 5.00 btg
- Besi Ø8 mm 1.05 15.03 15.78 ≈ 16.00 btg
- Pekerja 5.65 0.48 2.71 ≈ 2.00 hok
- Tukang 3.235 0.48 1.55 ≈ 2.00 hok

6. SNI-7394-2008 - 6.30 1 m3 kolom beton bertulang 1:2:3


- Semen 7.42 1.10 8.16 ≈ 8.00 zak
- Pasir Beton 0.54 1.10 0.59 ≈ 0.60 m3
- Split 0.81 1.10 0.89 ≈ 1.00 m3
- Bekisting 0.40 1.10 0.44 ≈ 0.00 m3
- Bendrat 4.50 1.10 4.95 ≈ 5.00 kg
- Paku 4.00 1.10 4.40 ≈ 4.00 kg
- Besi Ø10 mm 1.05 12.00 12.60 ≈ 13.00 btg
- Besi Ø8 mm 1.05 7.18 7.53 ≈ 8.00 btg
- Pekerja 7.05 1.10 7.76 ≈ 8.00 hok
- Tukang 4.025 1.10 4.43 ≈ 4.00 hok

7. SNI-7394-2008 - 6.31 1 m3 balok beton bertulang 1:2:3 (balok kran, balok bak)
- Semen 7.42 0.60 4.45 ≈ 4.00 zak
- Pasir Beton 0.54 0.60 0.32 ≈ 0.30 m3
- Split 0.81 0.60 0.49 ≈ 0.00 m3
- Bekisting 0.32 0.60 0.19 ≈ 0.00 m3
- Bendrat 3.00 0.60 1.80 ≈ 2.00 kg
- Paku 3.20 0.60 1.92 ≈ 2.00 kg
- Besi Ø10 mm 1.05 4.13 4.34 ≈ 4.00 btg
- Besi Ø8 mm 1.05 12.19 12.80 ≈ 13.00 btg
- Besi Ø6 mm 1.05 3.58 3.76 ≈ 4.00 btg
- Pekerja 6.35 0.60 3.81 ≈ 4.00 hok
- Tukang 3.325 0.60 2.00 ≈ 2.00 hok

8. SNI-7394-2008 - 6.32 1 m3 plat beton bertulang 1:2:3 (lantai bak)


- Semen 7.42 1.35 10.02 ≈ 10.00 zak
- Pasir Beton 0.54 1.35 0.73 ≈ 0.70 m3
- Split 0.81 1.35 1.09 ≈ 1.00 m3
- Bekisting 0.32 1.35 0.43 ≈ 0.00 m3
- Dolken 32.00 1.35 43.20 ≈ 43.00 btg
- Bendrat 3.00 1.35 4.05 ≈ 4.00 kg
- Paku 3.20 1.35 4.32 ≈ 4.00 kg
- Besi Ø10 mm 1.05 43.06 45.21 ≈ 45.00 btg
- Pekerja 5.3 1.35 7.16 ≈ 7.00 hok
- Tukang 2.625 1.35 3.54 ≈ 4.00 hok

9. SNI-7394-2008 - 6.33 1 m3 dinding beton bertulang 1:2:3


- Semen 7.42 0.00 0.00 ≈ 0.00 zak
- Pasir Beton 0.54 0.00 0.00 ≈ 0.00 m3
- Split 0.81 0.00 0.00 ≈ 0.00 m3
- Bekisting 0.24 0.00 0.00 ≈ 0.00 m3
- Bendrat 2.25 0.00 0.00 ≈ 0.00 kg
- Paku 3.20 0.00 0.00 ≈ 0.00 kg
- Besi Ø10 mm 1.05 0.03 0.03 ≈ 0.00 btg
- Pekerja 5.3 0.00 0.00 ≈ 0.00 hok
- Tukang 2.625 0.00 0.00 ≈ 0.00 hok

10. SNI-2837-2008 - 6.4 1 m2 plesteran tebal 15 mm + Aci 1 : 4 (dinding + lantai)


Luas plester = 30.40 m2
Luas lantai = 72.00 m2 (tebal plester = 3 cm)
- Semen 0.125 102.40 12.78 ≈ 13.00 zak
- Pasir 0.024 102.40 2.46 ≈ 2.50 m3
- Pekerja 0.300 102.40 30.72 ≈ 31.00 hok
- Tukang 0.150 102.40 15.36 ≈ 15.00 hok

8 / 10
P3MD TOS Sumur Bor

11. 1 m3 pasangan bata


- Batu Bata 750 0.00 0.00 ≈ 0.0 bh
- Semen 3.1 0.00 0.00 ≈ 0.00 zak
- Pasir 0.4 0.00 0.00 ≈ 0.00 m3
- Pekerja 4.5 0.00 0.00 ≈ 0.00 hok
- Tukang 1.5 0.00 0.00 ≈ 0.00 hok

KEBUTUHAN BAHAN DAN TENAGA UNTUK 1 UNIT SUMUR BOR KEDALAMAN 50 m

PEKERJA = 67.27 ≈ 67 HOK


TUKANG = 28.48 ≈ 28 HOK
BATU BELAH 2.55 ≈ 3 M3
SEMEN = 45.91 ≈ 46 ZAK
SPLIT = 2.47 ≈ 3 M3
PASIR = 5.83 ≈ 6 M3
BESI DIAMETER 10MM = 66.52 ≈ 67 BTG
BESI DIAMETER 8 MM = 36.11 ≈ 36 BTG
BESI DIAMETER 6 MM = 3.76 ≈ 4 BTG
BENDRAT = 12.24 ≈ 13 KG
BEKISTING = 1.19 ≈ 1 M3
PAKU = 11.60 ≈ 12 KG
PIPA AW 4" = 18.00 18 BTG
PIPA AW 1 1/4" = 3.00 3 BTG
KNEE 1 1/4" = 4.00 4 BUAH
OVERSHOCK 1 - 3/4 = 2.50 3 BUAH
PIPA AW 1" = 3.00 3 BTG
PIPA AW 3/4" = 2.00 2 BTG
KNEE 3/4" = 3.00 3 BUAH
T DRAT DALAM 3/4" = 10.00 10 BUAH
KRAN AIR = 10.00 10 BUAH
STOP KRAN 1 1/4" = 2.00 2 BUAH
SEAL TAPE = 5.00 5 BUAH
LEM ISARPLAST = 2.00 2 BUAH

9 / 10
Form. 24

Sumur Bor DANA DESA TAHUN 2021


Kran Air

5m
Bak Penampungan PROPINSI : LAMPUNG
1m
KABUAPTEN : PERINGSEWU
KECAMATAN : PARDASUKA

5m DESA :
PARDASUKA SELATAN
Resapan
4m

2m
JENIS PRASARANA :
AIR BERSIH

TOWER AIR
1m
Sal Kuras ISOMETRI LOKASI :
PARDASUKA SELATAN
Pipa PVC 3/4 Inch 2m

Mesin Pompa
Balok 0,20 x 0,20 Kolom JUDUL GAMBAR :
Dudukan Mesin Pompa Ø10-15 SUMUR BOR
Pasangan Batu Bata 2m
PENULANGAN DINDING BAK 2m

1,5 m Balok 0,12 x 0,12 Lantai Rabat Ø10-15 DIBUAT OLEH :


15 cm
TPK / KADER TEKNIK

15 cm

C
Sloof 0,25 x 0,20
PENULANGAN LANTAI
Pipa PVC 1 Inch
A
Sengkang Ø6-15
30 m TAMPAK SAMPING B PENULANGAN BAK AIR
Sengkang Ø6-10 Ø10-20
Kolom 0,25 x 0,25 x 3 m
70 Tul Kolom 4Ø12 4Ø12
4Ø12 +0.20 Tul Sloof 4Ø10
0.00 Tanah Asli

0,70 cm 15
25

Pas. 1 : 4
0,30 15
25 0,50 Detail C
Detail B DETAIL PONDASI A

You might also like