Form No. WEIL-QE-CL-004, Rev.

Ruche Phase 1 Topside Production Facility


WEIL Project Number - C371

CHECK LIST FOR INSTALLTION OF PANEL


Company BOARD Contractor
Report No: DATE: System No:

WEIL Package ID:

Drawing Ref:

Specification Ref:
Location: Description:

Equipment Tag No:

MFR

CHECK LIST Accept Reject Remarks

1 Inpect for any physical damage and defect.

Check panel location and arrangment as per IFC


2
drawing

3 Check base plate

4 Check doors,handles,keylocks & various mechanisam

5 Check for the Leveling and allighnmrnet

6 Check Name plate/Tag No. is provided.

7 Identification & warning sign is provided.

8 Check for the Accessories complete

9 Area classification is confirm

10 groundiong check

Verifiy the cable dressing & arrangement inside the


11
panel is correct.

VENDOR VENDOR QA/QC WEIL QA/QC

Name

Signature

Date

Company

Page 1 of 1