Form No. WEIL-QE-CL-005, Rev.

Ruche Phase 1 Topside Production Facility


WEIL Project Number - C371

CHECK LIST FOR INSTALLTION OF JUNCTION


Company BOX Contractor
Report No: DATE: Skid Tag No:
WEIL Package ID: Model:

Drawing Ref: Voltage Rating:

Specification Ref: Ex Rating:

Location: Serial Number:

Equipment Tag No: Manufactirer:

System/Duty: Ex Certificate No:

CHECK LIST Accept Reject Remarks

1 Inpect for any physical damage and defect

Check for material type & locatiobn as per the approved


2
drawing

3 Check for the area classification is confirmed

Check for the Mounting height as per the appoved


4
installtion detail

5 Check for the Leveling and allighnmrnet

6 Check Name plate/Tag No. is provided.

7 Support and device properly fixed

8 Grounding check

Verifiy the cable dressing & arrangement inside the


9
panel is correct.

VENDOR VENDOR QA/QC WEIL QA/QC


Name

Signature

Date