09DJK19F1023 Slide Pembentangan
09DJK19F1023 Slide Pembentangan
09DJK19F1023 Slide Pembentangan
MATRIX NO : 09DJK17F1023
MISSION
LIFE TECH & IDEAS FOR THE SELLBEING OF PEOPLE, SOCIETY AND THE PLANET
VISION
LEADING THE INDUSTRY WITH AIR AND WATER TECHNOLOGIES THAT SECURE A COMFORTABLE
AND SUSTAINABLE NEW WORLD
PQC DEPARTMENT
PQC DEPARTMENT IS MORE TO THE PRODUCT SAFETY AND QUALITY. EACH AIR-
CONDITIONING SET WELL BE CHECK ONE BY ONE TO MAKE SURE ITS SAFE AND FOLLOW THE
COMPANY RECOMMENDATION. THE BAD SET WILL BE REPAIR UNTIL THE SET IS SAFE AND
GOOD TO RE-CHECK.
TOOLS
PS-CHORD
R32 GUN
INPUT GAS R32
R410A GUN
INPUT GAS R410A
TOURQE
THIGHTEN THE VALVE
INFRARED REFRIGERANT GAS LEAK DITECTOR
TO DISPLAY THE NUMBER OF LEAKING
PROBE
TO POINT THE PROBE TO AIR-CONDITIONER SET
PREPARATION SECTION
THE PREPARATION SECTION IS TO INPUT THE R32 GAS TO THE AIR-CONDIOTIONING SET.
PS-CHORD NEED TO INPUT AT THE TERMINAL OF AIR-CONDITIONING SET.
2 GUN NEED TO BE INPUT AT VACP THAT ARE ATTACHED TO VALVE AT AIR-CONDITIONING
SET.
PULL THE LAVER AT THE END OF GUN TO LET THE GAS IN.
SOUND SECTION