DPWH SET BACK REQ.

1 2 3 4 5 6 7 8
25012
25000

10000 3000 3000 4000 4000 3000 3000 3000 2000

6'' CHB WALL, PLASTERED


900 SMOOTH FINISHED, PAINTED GRAY KITCHEN HOOD
WITH WATER PROOFING
ROOF APEX
2850

ELEV. WATER TANK


ROOF BEAM LEVEL
EXISTING FENCE

CL
6950

ROLL-UP DOOR (SEE DETAIL) MANGO RECEIVING AREA


6050 3950 2625 A A A A A A F F
3500

3500
ACU

2550
W-8 W-8
WALKWAY

W-3 W-4 W-4 W-4 W-4 D-2

FLOOR LINE
600

600
FINISHED GRADE LINE
NATIONAL ROAD A
ROLL-UP DOOR (SEE DETAIL) 6'' CHB WALL, PLASTERED
SMOOTH FINISHED, PAINTED WHITE

1 RIGHT - SIDE ELEVATION


A-7 SCALE: 1 : 100 M.

CADD BY: M.M/LADERA / APRIL 6, 2022 /4th Revised/ PEO FILE


PROJECT TITLE: PREPARED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED: SHEET CONTENT: SHEET NO:
Republic of the Philippines
DEPARTMENT OF AGRICULTURE Construction of Romblon RIGHT-SIDE ELEVATION
A
PHILIPPINE RURAL DEVELOPMENT PROJECT
Mango Trading and Processing
PROVINCE OF ROMBLON GERBY M. SOLIS RUEL M. MERIDA WILLARD B. MORTOS JOSE R. RIANO CADD by: M.MLADERA

LOCATION: BRGY. CANJALON, SAN FERNANDO, ROMBLON Engineer III Provincial Engineer PPMIU - Head Governor Date: