5m)
Project : Binus Dormitory Tgl : 17/12/2008
Engineer : Agha Riwayat Revisi : R.1
b
qt = qo Ka
a
a1 qo
h3
h Wt
h1
W1
H Pa1
W2 gt ; fa
h2
e1 Pa2
a' b'
H/3
hp Pp t1
O qb
W3
gs ; fp
qo Ka + gt HKa
Kp = 1+sin.fa
L1 l L2
1-sin.fa Ka = 1-sin.fa
R1 R2 1+sin.fa
L
1. Data Geometri
h = 4.70 ( tinggi tanah urugan awal )
h2 = 2.50 m ( rencana tinggi urugan tanah )
hp = 0.30 m
H = 2.80 m
h1 = 2.60 m
h3 = 2.20 m
L1 = 0.50 m Jarak titik berat W1, W2, W3, Wt terhadap titik O
L2 = 0.75 m e1 = 0.54 m
l = 1.75 m e2 = -0.74 m
L = 3.00 m e3 = -0.13 m
t1 = 0.20 m et = 1.18 m
a = 0.50 m eq = 0.96 m
a1 = 1.67 m
a' = 1.67 m
b = 2.50 m
b' = 1.33 m
q0 = 1.00 Ton/m² ( Beban Tambahan)
Berat Jenis Batu Kali = 2.20 Ton/m³
2. Data Tanah
fa = 35.00 º ( Sudut Geser Tanah Urugan)
gt = 1.70 Ton/m³ ( Berat Jenis Tanah Urugan )
sin fa = 0.57
Ka = 0.27 ( Koef Tek. Tanah Aktif )
file:///conversion/tmp/activity_task_scratch/635196261.xls Page 1
3. Data Tiang Pancang
Ukuran Tiang = 25 x 25 cm2 L = 12 m
Pijin Tekan Tiang = 57.7 Ton
Pijin Tarik Tiang = 15.86 Ton
Pijin Horisontal = 4.60 Ton
Pa1 = q0.Ka.H
= 0.76 Ton/m
Pa2 = ½gt.H2.Ka
= 1.81 Ton/m
Pa = Pa1+Pa2
= 2.56 Ton/m
Pp = ½gs.hp2.Kp
= 0.10 Ton/m
Mw = (W1 x e1) + (W2 x e2) + (W3 x e3) + (Wt x et) + (q0 x b' x eq)
= 9.57 Ton m (per m1)
file:///conversion/tmp/activity_task_scratch/635196261.xls Page 2
* Tinjauan Lebar Jalur (b)
= 2.4 m
M b
b
b
R1 R2
R1 = M / l (Tekan)
R2 = M / l (Tarik)
R1 = Mxb
l
= 16.87 Ton (Tekan)
R2 = (-M x b)
l
= -16.87 Ton (Tarik)
Cek Reaksi R1 R2
(Akibat Momen) 16.87 -16.87
(Akibat Vertikal) 24.28 24.28
= 41.15 (Tekan) 7.41 (Tekan)
(OK < P ijin Tekan Tiang) (OK < P ijin Tekan Tiang)
Pp = ½gs.hp2.Kp.b
= 0.25 Ton/m
PH Ijin Tiang = 4.60 Ton
Jml tiang = 2.00 bh
Total PH Ijin Tiang = 9.20 Ton
(Pa1 + Pa2) x b = 6.16
file:///conversion/tmp/activity_task_scratch/635196261.xls Page 3
Perhitungan Dinding Penahan Tanah Batu Kali + Pile (Urugan Max 2.5m)
Project : Binus Dormitory Tgl : 17/12/2008
Engineer : Agha Riwayat Revisi : R.1
b
qt = qo Ka
a
a1 qo
h3
h Wt
h1
W1
H Pa1
W2 gt ; fa
h2
e1 Pa2
a' b'
H/3
hp Pp t1
O qb
W3
gs ; fp
qo Ka + gt HKa
Kp = 1+sin.fa
L1 l L2
1-sin.fa Ka = 1-sin.fa
R1 R2 1+sin.fa
L
1. Data Geometri
h = 3.70 ( tinggi tanah urugan awal )
h2 = 2.50 m ( rencana tinggi urugan tanah )
hp = 0.30 m
H = 2.80 m
h1 = 2.60 m
h3 = 1.20 m
L1 = 0.50 m Jarak titik berat W1, W2, W3, Wt terhadap titik O
L2 = 0.75 m e1 = 0.52 m
l = 1.15 m e2 = 0.47 m
L = 2.40 m e3 = 0.13 m
t1 = 0.20 m 'et = 0.90 m
a = 0.50 m eq = 0.68 m
a1 = 1.12 m
a' = 1.12 m
b = 1.90 m
b' = 1.28 m
q0 = 1.00 Ton/m² ( Beban Tambahan)
Berat Jenis Batu Kali = 2.20 Ton/m³
2. Data Tanah
fa = 35.00 º ( Sudut Geser Tanah Urugan)
gt = 1.70 Ton/m³ ( Berat Jenis Tanah Urugan )
sin fa = 0.57
Ka = 0.27 ( Koef Tek. Tanah Aktif )
file:///conversion/tmp/activity_task_scratch/635196261.xls Page 4
3. Data Tiang Pancang
Ukuran Tiang = 25 x 25 cm2 L = 12 m
Pijin Tekan Tiang = 57.7 Ton
Pijin Tarik Tiang = 15.86 Ton
Pijin Horisontal = 4.60 Ton
Pa1 = q0.Ka.H
= 0.76 Ton/m
Pa2 = ½gt.H2.Ka
= 1.81 Ton/m
Pa = Pa1+Pa2
= 2.56 Ton/m
Pp = ½gs.hp2.Kp
= 0.10 Ton/m
Mw = (W1 x e1) + (W2 x e2) + (W3 x e3) + (Wt x et) + (q0 x b' x eq)
= 6.17 Ton m (per m1)
file:///conversion/tmp/activity_task_scratch/635196261.xls Page 5
* Tinjauan Lebar Jalur (b)
= 2.4 m
M b
b
b
R1 R2
R1 = M / l (Tekan)
R2 = M / l (Tarik)
R1 = Mxb
l
= 18.57 Ton (Tekan)
R2 = (-M x b)
l
= -18.57 Ton (Tarik)
Cek Reaksi R1 R2
(Akibat Momen) 18.57 -18.57
(Akibat Vertikal) 19.13 19.13
= 37.70 (Tekan) 0.57 (Tekan)
(OK < P ijin Tekan Tiang) (OK < P ijin Tekan Tiang)
Pp = ½gs.hp2.Kp.b
= 0.25 Ton/m
PH Ijin Tiang = 4.60 Ton
Jml tiang = 2.00 bh
Total PH Ijin Tiang = 9.20 Ton
(Pa1 + Pa2) x b = 6.16
file:///conversion/tmp/activity_task_scratch/635196261.xls Page 6
Perhitungan Dinding Penahan Tanah Batu Kali + Pile (Urugan Max 2.5m)
Project : Binus Dormitory Tgl : 17/12/2008
Engineer : Agha Riwayat Revisi : R.1
b
qt = qo Ka
a
a1 qo
h3
h Wt
h1
W1
H Pa1
W2 gt ; fa
h2
e1 Pa2
a' b'
H/3
hp Pp t1
O qb
W3
gs ; fp
qo Ka + gt HKa
Kp = 1+sin.fa
L1 l L2
1-sin.fa Ka = 1-sin.fa
R1 R2 1+sin.fa
L
1. Data Geometri
h = 2.80 ( tinggi tanah urugan awal )
h2 = 2.50 m ( rencana tinggi urugan tanah )
hp = 0.30 m
H = 2.80 m
h1 = 2.60 m
h3 = 0.30 m
L1 = 0.40 m Jarak titik berat W1, W2, W3, Wt terhadap titik O
L2 = 0.25 m e1 = 0.60 m
l = 1.03 m e2 = 0.06 m
L = 1.68 m e3 = 0.07 m
t1 = 0.20 m 'et = 0.41 m
a = 0.50 m eq = 0.24 m
a1 = 0.63 m
a' = 0.63 m
b = 1.18 m
b' = 1.05 m
q0 = 1.00 Ton/m² ( Beban Tambahan)
Berat Jenis Batu Kali = 2.20 Ton/m³
2. Data Tanah
fa = 35.00 º ( Sudut Geser Tanah Urugan)
gt = 1.70 Ton/m³ ( Berat Jenis Tanah Urugan )
sin fa = 0.57
Ka = 0.27 ( Koef Tek. Tanah Aktif )
file:///conversion/tmp/activity_task_scratch/635196261.xls Page 7
3. Data Tiang Pancang
Ukuran Tiang = 25 x 25 cm2 L = 12 m
Pijin Tekan Tiang = 57.7 Ton
Pijin Tarik Tiang = 15.86 Ton
Pijin Horisontal = 4.60 Ton
Pa1 = q0.Ka.H
= 0.76 Ton/m
Pa2 = ½gt.H2.Ka
= 1.81 Ton/m
Pa = Pa1+Pa2
= 2.56 Ton/m
Pp = ½gs.hp2.Kp
= 0.10 Ton/m
Mw = (W1 x e1) + (W2 x e2) + (W3 x e3) + (Wt x et) + (q0 x b' x eq)
= 3.51 Ton m (per m1)
file:///conversion/tmp/activity_task_scratch/635196261.xls Page 8
* Tinjauan Lebar Jalur (b)
= 2.4 m
M b
b
b
R1 R2
R1 = M / l (Tekan)
R2 = M / l (Tarik)
R1 = Mxb
l
= 14.54 Ton (Tekan)
R2 = (-M x b)
l
= -14.54 Ton (Tarik)
Cek Reaksi R1 R2
(Akibat Momen) 14.54 -14.54
(Akibat Vertikal) 13.09 13.09
= 27.63 (Tekan) -1.45 (Tarik)
(OK < P ijin Tekan Tiang) (OK < P ijin Tarik Tiang)
Pp = ½gs.hp2.Kp.b
= 0.25 Ton/m
PH Ijin Tiang = 4.60 Ton
Jml tiang = 2.00 bh
Total PH Ijin Tiang = 9.20 Ton
(Pa1 + Pa2) x b = 6.16
file:///conversion/tmp/activity_task_scratch/635196261.xls Page 9
Perhitungan Dinding Penahan Tanah Batu Kali + Pile (Urugan Max 2.5m)
Project : Binus Dormitory Tgl : 17/12/2008
Engineer : Agha Riwayat Revisi : R.1
b
qo qt = q o K a
a
gt ; fa
h Wt
W1 h1
H Pa1
W2
e1 Pa2
a' b'
H/3
hp Pp t1
qb
W3
gs ; fp
qo Ka + gt HKa
Kp = 1+sin.fa
L1 l L2
1-sin.fa Ka = 1-sin.fa
R1 R2 1+sin.fa
L
1. Data Geometri
h = 2.50 ( tinggi tanah urugan)
hp = 0.30 m
H = 2.80 m Jarak titik berat W1, W2, W3, Wt terhadap titik O
h1 = 2.60 m e1 = 0.68 m
L1 = 0.50 m e2 = 0.20 m
L2 = 0.75 m e3 = 0.13 m
l = 1.03 m 'et = 0.73 m
L = 2.28 m eq = 0.47 m
t1 = 0.20 m
a = 0.68 m
a' = 0.68 m
b = 1.60 m
b' = 1.60 m
q0 = 1.00 Ton/m² ( Beban Tambahan)
Berat Jenis Batu Kali = 2.20 Ton/m³
2. Data Tanah
fa = 35.00 º ( Sudut Geser Tanah Urugan)
gt = 1.70 Ton/m³ ( Berat Jenis Tanah Urugan )
sin fa = 0.57
Ka = 0.27 ( Koef Tek. Tanah Aktif )
file:///conversion/tmp/activity_task_scratch/635196261.xls Page 10
3. Data Tiang Pancang
Ukuran Tiang = 25 x 25 cm2 L = 12 m
Pijin Tekan Tiang = 57.7 Ton
Pijin Tarik Tiang = 15.86 Ton
Pijin Horisontal = 4.60 Ton
Pa1 = q0.Ka.H
= 0.76 Ton/m
Pa2 = ½gt.H2.Ka
= 1.81 Ton/m
Pa = Pa1+Pa2
= 2.56 Ton/m
Pp = ½gs.hp2.Kp
= 0.10 Ton/m
Mw = (W1 x e1) + (W2 x e2) + (W3 x e3) + (Wt x et) + (q0 x b' x eq)
= 7.69 Ton m (per m1)
file:///conversion/tmp/activity_task_scratch/635196261.xls Page 11
* Tinjauan Lebar Jalur (b)
= 2.4 m
M b
b
b
R1 R2
R1 = M / l (Tekan)
R2 = M / l (Tarik)
R1 = Mxb
l
= 24.30 Ton (Tekan)
R2 = (-M x b)
l
= -24.30 Ton (Tarik)
Cek Reaksi R1 R2
(Akibat Momen) 24.30 -24.30
(Akibat Vertikal) 23.13 23.13
= 47.43 (Tekan) -1.17 (Tarik)
(OK < P ijin Tekan Tiang) (OK < P ijin Tarik Tiang)
Pp = ½gs.hp2.Kp.b
= 0.25 Ton/m
PH Ijin Tiang = 4.60 Ton
Jml tiang = 2.00 bh
Total PH Ijin Tiang = 9.20 Ton
(Pa1 + Pa2) x b = 6.16
file:///conversion/tmp/activity_task_scratch/635196261.xls Page 12
Perhitungan Dinding Penahan Tanah Batu Kali + Pile
Project : Binus Dormitory Tgl : 17/12/2008
Engineer : Agha Riwayat Revisi : R.1
b
qo qt = q o K a
a
gt ; fa
h Wt
W1 h1
H Pa1
W2
e1 Pa2
a' b'
H/3
hp Pp t1
qb
W3
gs ; fp
qo Ka + gt HKa
Kp = 1+sin.fa
L1 l L2
1-sin.fa Ka = 1-sin.fa
R1 R2 1+sin.fa
L
1. Data Geometri
h = 1.80 m ( tinggi tanah urugan)
hp = 0.30 m
H = 2.10 m Jarak titik berat W1, W2, W3, Wt terhadap titik O
h1 = 1.90 m e1 = 0.38 m
L1 = 0.25 m e2 = 0.18 m
L2 = 0.40 m e3 = 0.07 m
l = 0.75 m 'et = 0.48 m
L = 1.40 m eq = 0.33 m
t1 = 0.20 m
a = 0.50 m
a' = 0.50 m
b = 0.90 m
b' = 0.90 m
q0 = 1.00 Ton/m² ( Beban Tambahan)
Berat Jenis Batu Kali = 2.20 Ton/m³
2. Data Tanah
fa = 35.00 º ( Sudut Geser Tanah Urugan)
gt = 1.70 Ton/m³ ( Berat Jenis Tanah Urugan )
sin fa = 0.57
Ka = 0.27 ( Koef Tek. Tanah Aktif )
file:///conversion/tmp/activity_task_scratch/635196261.xls Page 13
3. Data Tiang Pancang
Ukuran Tiang = 25 x 25 cm2 L = 12 m
Pijin Tekan Tiang = 57.7 Ton
Pijin Tarik Tiang = 15.86 Ton
Pijin Horisontal = 4.60 Ton
Pa1 = q0.Ka.H
= 0.57 Ton/m
Pa2 = ½gt.H2.Ka
= 1.02 Ton/m
Pa = Pa1+Pa2
= 1.58 Ton/m
Pp = ½gs.hp2.Kp
= 0.10 Ton/m
Mw = (W1 x e1) + (W2 x e2) + (W3 x e3) + (Wt x et) + (q0 x b' x eq)
= 1.27 Ton m (per m1)
file:///conversion/tmp/activity_task_scratch/635196261.xls Page 14
* Tinjauan Lebar Jalur (b)
= 3.0 m
M b
b
b
R1 R2
R1 = M / l (Tekan)
R2 = M / l (Tarik)
R1 = Mxb
l
= 9.75 Ton (Tekan)
R2 = (-M x b)
l
= -9.75 Ton (Tarik)
Cek Reaksi R1 R2
(Akibat Momen) 9.75 -9.75
(Akibat Vertikal) 10.49 10.49
= 20.25 (Tekan) 0.74 (Tekan)
(OK < P ijin Tekan Tiang) (OK < P ijin Tekan Tiang)
Pp = ½gs.hp2.Kp.b
= 0.31 Ton/m
PH Ijin Tiang = 4.60 Ton
Jml tiang = 2.00 bh
Total PH Ijin Tiang = 9.20 Ton
(Pa1 + Pa2) x b = 4.75
file:///conversion/tmp/activity_task_scratch/635196261.xls Page 15
PILE LOAD CAPACITY
Pu = ( 25 x Np x Ap ) + (∑Ns x Ls + Nc x Lc ) x K
5 2
P allowable = Pu / 2
∑ = 79.30
Pile 25x25
K1 = 4 x 0.25 = 1.00 m
Ap = 0.25 x 0.25 = 0.06 m
5
C. Perhitungan Dinding Penahan Tanah
Batu Kali + Pile (Urugan Max 2.5m)